Atalaya Mining PLC Announces 1st Quarter Financial Results

2019-05-23 / @accesswire

 

Atalaya Mining Plc. ("Atalaya" and/or the "Group")

Condensed Interim Consolidated Financial Statements for the three months ended 31 March 2019

NICOSIA, CYPRUS / ACCESSWIRE / May 23, 2019 / Atalaya Mining Plc (AIM: ATYM; TSX: AYM), the European mining and development company, is pleased to announces its unaudited quarterly results for the three months ended 31 March 2019, together with the unaudited, condensed, interim consolidated financial statements.

Unaudited Financial Highlights

Quarter Ended 31 March

Q1 2019

Q1 2018

%

Revenues from operations

?,?k

51,712

52,676

(1.8)%

Operating costs

?,?k

(30,026)

(36,426)

(17.6)%

EBITDA

?,?k

19,510

14,998

30.1%

Profit for the period

?,?k

14,155

8,790

61.0%

Earnings per share

?,? cents/share

10.3

6.5

58.5%

Cash flows from operating activities

?,?k

8,114

18,377

(55.8)%

Cash flows used in investing activities

?,?k

(17,138)

(8,741)

96.1%

Cash flows from financing activities

?,?k

-

48

n.q.

Working capital surplus

?,?k

9,010

8,435

6.8%

Average realised copper price

$/lb

2.80

3.03

(7.6)%

Cu concentrate produced

(tonnes)

43,441

42,429

2.4%

Cu production

(tonnes)

10,219

9,441

8.2%

Cash costs

$/lb payable

1.89

2.27

(16.7)%

All-In Sustaining Cost

$/lb payable

2.18

2.65

(17.7)%

?EUR? Revenues of ?,?51.7 million for the three months ended 31 March 2019 ("Q1 2019") compared with ?,?52.7 million for the three months ended 31 March 2018 ("Q1 2018"). The variance was due to stronger average US Dollar rates against the Euro and offset by lower copper prices and slightly lower volumes sold during the period.

?EUR? Operating costs during Q1 2019 were ?,?30.0 million compared with ?,?36.4 million in Q1 2018. Lower expenses were mainly due to a reduction in earthworks and changes in inventories.

?EUR? Cash costs during Q1 2019 were $1.89/lb of payable copper, an increase from cash costs of $1.77/lb of payable copper in Q4 2018 but lower than Q1 2018 ($2.27/lb). The decrease against Q1 2018 was mainly the result of lower mining, and technical services, maintenance, penalties and concentrate deductions. All-in Sustaining Costs ("AISC") during Q1 2019 amounted to $2.18/lb of payable copper, an increase from $2.00/lb of payable copper during Q4 2018 but lower than Q1 2018 ($2.65/lb).

?EUR? Management expects cash costs for the year to remain within the guidance range provided of $1.95/lb to $2.15/lb and AISC from $2.25/lb to $2.45/lb.

?EUR? EBITDA of ?,?19.5 million in Q1 2019 compared with ?,?15.0 million in Q1 2018. The increase in EBITDA was mainly the result of lower operating costs in Q1 2019.

?EUR? Q1 2019 profit after tax amounted to ?,?14.2 million (or 10.3 cents basic earnings per share) compared with a profit for Q1 2018 of ?,?8.8 million (or 6.5 cents basic earnings per share).

?EUR? Inventories of concentrate at 31 March 2019 amounted to ?,?2.4 million (?,?3.0 million at 31 December 2018).

?EUR? At the end of Q1 2019 working capital was ?,?9.0 million, a ?,?0.6 million increase from ?,?8.4 million at the end of Q4 2018. Unrestricted cash balances as at 31 March 2019 amounted to ?,?23.8 million.

Financial Highlights (continued)

?EUR? Cash flow from operating activities before changes in working capital was ?,?20.3 million for Q1 2019 compared with a cash flow of ?,?15.2 million during Q1 2018.

?EUR? Net cash flow from operating activities after changes in working capital was ?,?8.1 million for Q1 2019 compared with a cash flow of ?,?18.4 million during Q1 2018.

Operational Highlights

Proyecto Riotinto

?EUR? Copper production during Q1 2019 was 10,219 tonnes, an increase of 8.2% compared with 9,441 tonnes produced during Q1 2018.

?EUR? Ore processed during Q1 2019 was 2,445,977 tonnes, an increase on Q1 2018 when ore processed amounted to 2,206,861 tonnes.

?EUR? Copper recovery during the quarter was 90.27%, higher than 88.47% achieved in Q1 2018.

?EUR? The Company maintains its previously stated copper production guidance for 2019 of 45,000 - 46,500 tonnes.

Expansion to 15Mtpa at ProyectoRiotinto

?EUR? The 15Mtpa expansion project has progressed materially during the quarter with expected mechanical completion on track for the end of Q2 2019. Overall progress completion at the end of the quarter was 97% with construction reporting 72% completion.

?EUR? The new primary crushing area is mechanically well advanced with electrical works progressing. In the new milling area, mechanical activities are progressing according to plan. New flotation and concentrate handling areas are in the final stages of commissioning.

Proyecto Touro

?EUR? During the quarter, feedback has been received from the relevant Administration bodies as part of the assessment of the environmental impact studies. The Company is addressing additional requests to complement current management plans. This stage of the process is expected to last until the end of Q2 2019.

Legal updates

?EUR? On 29 March 2019, the Company announced that it had received notification from the Supreme Court in Spain that it does not have jurisdiction over the appeal made by the Junta de Andaluc?-a ("JdA") and the Company, which voluntarily joined the appeal as co-defendant. Therefore, the previously announced Ruling made by the Tribunal Superior de Justicia de Andaluc?-a ("TSJA") remains valid. The Company will continue operating the mine normally and has been advised the Ruling will not impact its operations at Proyecto Riotinto.

?EUR? On 26 April 2019, the Company announced a judgment related to the Mining Permits to operate Proyecto Riotinto (the "Mining Permits") was handed down by the TSJA. The TSJA declared the Mining Permits are linked to the Environmental Permits, ruled by the same tribunal on September 2018. The new ruling on the Mining Permits is based on the requirement to have an AAU before issuing mining permits and therefore invalidates the existing Mining Permits. The TSJA has not accepted the requests by EeA for the cessation of activities at the mine and an increase in the scope of the environmental plan.

?EUR? All the pending claims made by EeA have now been ruled by the TSJA. Atalaya continues to work with its legal advisors to evaluate the possibility of appealing the ruling and to ensure the JdA addresses all procedural points raised in both rulings. The Company continues operating the mine normally as the rulings do not state the operation at Proyecto Riotinto is to be ceased, not even temporarily and it is still confident that the ruling will not impact its operations at Proyecto Riotinto. The JdA has publicly supported the continuation of the mine.

Alberto Lavandeira, CEO commented:

"We are delighted withAtalaya's financial performance for Q1 2019, in which reduced operating costshave led to a substantial increase in profits of over 60%. Progress with ourexpansion to 15Mtpa at Proyecto Riotinto is proceeding to plan with mechanicalcompletion on track for the end of Q2 2019. Once completed, we will enjoyimproved operational efficiencies and reduced cash costs compared with 2018. Wemaintain our guidance for full year 2019 production of 45,000 to 46,500 tonnesof copper."

This announcement containsinformation which, prior to its publication constituted inside information forthe purposes of Article 7 of Regulation (EU) No 596/2014.

Contacts:

Newgate Communications

Elisabeth Cowell / Adam Lloyd / Tom Carnegie

+ 44 20 3757 6880

4C Communications

Carina Corbett

+44 20 3170 7973

Canaccord Genuity (NOMAD and Joint Broker)

Henry Fitzgerald-O'Connor / James Asensio

+44 20 7523 8000

BMO Capital Markets (Joint Broker)

Jeffrey Couch / Tom Rider / Michael Rechsteiner

+44 20 7236 1010

About Atalaya Mining Plc

Atalaya is an AIM and TSX-listed mining and development group which produces copper concentrates and silver by-product at its wholly owned Proyecto Riotinto site in southwest Spain. In addition, the Group has a phased, earn-in agreement for up to 80% ownership of Proyecto Touro, a brownfield copper project in the northwest of Spain which is currently in the permitting stage. For further information, visit www.atalayamining.com

Management's review

(All amounts in Euro thousands unless otherwise stated)

For the three months to 31 March 2019 and 2018 - (Unaudited)

ATALAYA MINING PLC

MANAGEMENT'S REVIEW AND

CONDENSED INTERIM CONSOLIDATED

FINANCIAL STATEMENTS

31 March 2019

(UNAUDITED)

Notice to Reader

The accompanying unaudited, condensed, interim consolidated financial statements of Atalaya Mining Plc have been prepared by and are the responsibility of Atalaya Mining Plc's management. The unaudited, condensed, interim consolidated financial statements have not been reviewed by Atalaya's auditors.

Introduction

This report provides an overview and analysis of the financial results of operations of Atalaya Mining Plc and its subsidiaries ("Atalaya" and/or "Group"), to enable the reader to assess material changes in the financial position between 31 December 2018 and 31 March 2019 and results of operations for the three months ended 31 March 2019 and 2018.

This report has been prepared as of 22 May 2019. The analysis, hereby included, is intended to supplement and complement the unaudited, condensed, interim consolidated financial statements and notes thereto ("Financial Statements") as at and for the three months ended 31 March 2019. The reader should review the Financial Statements in conjunction with the review of this report and with the audited, consolidated financial statements for the year ended 31 December 2018, and the unaudited, condensed interim consolidated financial statements for the three months ended 31 March 2018. These documents can be found on Atalaya's website at www.atalayamining.com.

Atalaya prepares its Financial Statements in accordance with International Financial Reporting Standards ("IFRSs"). The currency referred to in this document is the Euro, unless otherwise specified.

Forward-lookingstatements

This report may include certain "forward-looking statements" and "forward-looking information" under applicable securities laws. Except for statements of historical fact, certain information contained herein constitutes forward-looking statements. Forward-looking statements are frequently characterised by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking statements are based on the opinions and estimates of management at the date the statements are made, and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. Assumptions upon which such forward-looking statements are based include that all required third party regulatory and governmental approvals will be obtained. Many of these assumptions are based on factors and events that are not within the control of Atalaya and there is no assurance they will prove to be correct. Factors that could cause actual results to vary materially from results anticipated by such forward-looking statements include changes in market conditions and other risk factors discussed or referred to in this report and other documents filed with the applicable securities regulatory authorities. Although Atalaya has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Atalaya undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements.

1. Description of thebusiness

Atalaya is a Cyprus European mining and development company. The Company is listed on the AIM Market of the London Stock Exchange ("AIM") and on the Toronto Stock Exchange ("TSX").

Proyecto Riotinto, wholly owned by the Company's subsidiary Atalaya Riotinto Minera, S.L.U., is located in Huelva, Spain. The Group operates the Cerro Colorado open-pit mine and its associated processing plant where copper in concentrate and silver by-product are produced. A brownfield expansion of the plant is in progress.

The Group has an initial 10% stake in Cobre San Rafael, S.L., the owner of Proyecto Touro, as part of an earn-in agreement which will enable the Group to acquire up to 80% of the copper project. Proyecto Touro is located in Galicia, north-west Spain.

2. Overview ofoperational results

Proyecto Riotinto

The following table presents a summarised statement of operations of Proyecto Riotinto for the three months ended 31 March 2019 and 2018.

Units expressed in accordance with the international system of units (SI)

Unit

Three months
ended

31 Mar 2019

Three months ended

31 Mar 2018

Three months ended

31 Dec 2018

Ore mined

t

2,549,985

2,559,201

2,814,637

Ore processed

t

2,445,977

2,206,861

2,631,092

Copper ore grade

%

0.46

0.48

0.48

Copper concentrate grade

%

23.52

22.25

24.01

Copper recovery rate

%

90.26

88.47

89.05

Copper concentrate

t

43,441

42,429

46,531

Copper contained in concentrate

t

10,219

9,441

11,172

Payable copper contained in concentrate

t

9,785

9,016

10,706

Cash cost*

$/lb payable

1.89

2.27

1.77

All-in sustaining cost*

$/lb payable

2.18

2.65

2.00

(*) Refer to Section 5of this Management's Review

Note: The numbers in the above table may slightly differ among them due to rounding.

Three months operational review

Copper production at Proyecto Riotinto for Q1 2019 increased to 10,219 tonnes from 9,441 tonnes reported in Q1 2018, and 11,172 tonnes in Q4 2018, representing an increase and a decrease of 8.2% and (8.5)%, respectively. Ore milled was consistent with previous quarters and in line with management's expectations. Copper head grade was in line with previous quarter and with expectations. The increase in copper production during the quarter compared with Q1 2018 was mainly attributable to a record average recovery of 90.26%.

Mining operations are progressing according to plan and at similar levels to previous quarters. On a combined basis, ore, waste and marginal ore amounted to 2.3 million m3 in Q1 2019 versus 2.5 million m3 in Q4 2018. Additional mining equipment is available on site in anticipation of the increase in production scheduled for H2 2019.

During Q1 2019, the Group sold 45,172 tonnes of concentrates, compared with 44,487 tonnes in Q4 2018 and 48,682 tonnes in Q1 2018. On-site concentrate inventories at the end of the quarter were approximately 2,936 tonnes. All concentrate in stock at the beginning of the quarter and produced during the quarter was delivered to the port at Huelva.

Exploration around Proyecto Riotinto is progressing well with two drilling programmes under way. Remaining massive sulphides and stockwork mineralisation are being targeted under the Atalaya pit. Lateral extensions of massive sulphides and stockwork are also being drilled around Filon Sur. Geological modelling is being updated as information becomes available.

2. Overview of operational results (continued)

Expansionto 15Mtpa at Proyecto Riotinto

The 15Mtpa expansion project has progressed materially during the quarter with expected mechanical completion on track for the end of Q2 2019. Overall progress completion at the end of the quarter was 97% with construction reporting 72% completion. The new primary crushing area is mechanically well advanced with electrical works progressing. In the new milling area, mechanical activities are progressing according to plan. New flotation and concentrate handling areas are in the final stages of commissioning.

Proyecto Touro

During the quarter, feedback has been received from the relevant Administration bodies as part of the assessment of the environmental impact studies. The Company is busy addressing additional requests to complement current management plans. This stage of the process is expected to last until the end of Q2 2019.

3. Outlook

Theforward-looking information contained in this section is subject to the riskfactors and assumptions contained in the cautionary statement on forward-lookingstatements included in the introduction note of this report.

Operationalguidance

Proyecto Riotinto operational guidance for 2019 remains as follows:

Guidance

Unit

2019

Ore processed

million tonnes

11.4

Contained copper

tonnes

45,000 - 46,500

Copper head grade for 2019 is budgeted to average 0.47% Cu, with a recovery rate of approximately 85% to 87%. Cash operating costs for 2019 are expected to be in the range of $1.95/lb - $2.15/lb, and AISC is estimated to be in the range of $2.25/lb - $2.45/lb.

4. Overview of thefinancial results

The following table presents summarised consolidated income statements for the three months ended 31 March 2019, with comparatives for the three months ended 31 March 2018.

(Euro 000's)

Three months ended

31 Mar 2019

Three months ended

31 Mar 2018

Revenue

51,712

52,676

Total operating costs

(30,026)

(36,426)

Administrative and other expenses

(1,917)

(1,053)

Exploration expenses

(201)

(199)

Care and maintenance expenditure

(5)

-

EBITDA

19,510

14,998

Depreciation/amortisation

(3,426)

(4,100)

Net foreign exchange gain

713

170

Net finance cost

(31)

(7)

Tax

(2,611)

(2,271)

Profit for the period

14,155

8,790

Three months financial review

Revenues for the three month period ended 31 March 2019 amounted to ?,?51.7 million (Q1 2018: ?,?52.7 million). Lower revenues, compared with the same quarter in the previous year, were mainly driven by stronger US Dollar average rates against Euro and offset by lower copper prices and slightly lower volumes during the period.

Realised prices of $2.80/lb copper during Q1 2019 compared with $3.03/lb copper in Q1 2018. All concentrates were sold under offtake agreements in place.

Operating costs for the three month period ended 31 March 2019 amounted to ?,?30.1 million, compared with ?,?36.4 million in Q1 2018. The decrease was mainly due to lower mining and processing variable costs, in addition to a lesser depreciation charge (due to an extension of the life of mine as per updated reserves and resources report in mid-2018).

Cash costs of $1.89/lb payable copper during Q1 2019 compared with $2.27lb payable copper in the same period last year. Cash costs were impacted by lower mining, technical services and maintenance costs and higher capitalised stripping costs compared with Q1 2018. Capitalised stripping costs during Q1 2019 amounted to ?,?0.8 million compared with ?,?0.3 million in Q1 2018. All-in sustaining costs in the reporting quarter were $2.18/lb payable copper compared with $2.65/lb payable copper in Q1 2018. The decrease in AISC compared with Q1 2018 mainly related to lower sustaining capex and agency fees as well as lower cash operating costs.

Sustaining capex for Q1 2019 amounted to ?,?1.7 million compared with ?,?2.7 million in Q1 2018. Sustaining capex related to enhancements in processing systems of the plant and continuous development programmes at the tailings storage facilities.

Administrative and other expenses amounted to ?,?1.9 million (Q1 2018: ?,?1.1 million) and include non-operating costs of the Cyprus office, corporate legal and consultancy costs, on-going listing costs, officers and directors' emoluments, and salaries and related costs of the corporate office.

Exploration costs at Proyecto Riotinto for the three month period ended 31 March 2019 amounted to ?,?0.2 million, similar amount that in Q1 2018. All exploration costs at Proyecto Touro are capitalised.

EBITDA for the three months ended 31 March 2019 amounted to ?,?19.5 million compared with Q1 2018 of ?,?15.0 million.

The main item below the EBITDA line is depreciation and amortisation of ?,?3.4 million (Q1 2018: ?,?4.1 million). Net financing costs for Q1 2019 amounted to ?,?31k compared with ?,?7k in Q1 2018.

Copperprices

The average realised copper price decreased 7.6% from US$3.03 per pound in Q1 2018 to US$2.80 per pound in Q1 2019.

The average prices of copper for the three months ended 31 March 2019 and 2018 are summarised below:

(USD)

Three months ended

31 Mar 2019

Three months ended

31 Mar 2018

Realised copper price per lb

2.80

3.03

Market copper price per lb

2.82

3.16

Realised copper prices for the reporting period noted above have been calculated using payable copper and including provisional invoices and final settlements of quotation periods ("QPs") together. Lower realised prices than market averages are mainly due to the final settlement of invoices where QP was fixed in the previous quarter due to a short open period when copper prices were lower. The realised price of shipments during the quarter excluding QP was approximately $2.82/lb.

5. Non-GAAP Measures

Atalaya has included certain non-IFRS measures including "EBITDA", "Cash Cost per pound of payable copper", "All In Sustaining Costs" ("AISC") and "realised prices" in this report. Non-IFRS measures do not have any standardised meaning prescribed under IFRS, and therefore they may not be comparable to similar measures presented by other companies. These measures are intended to provide additional information and should not be considered in isolation or as a substitute for indicators prepared in accordance with IFRS.

EBITDA includes gross sales net of penalties and discounts and all operating costs, excluding finance, tax, impairment, depreciation and amortisation expenses.

Cash Cost per pound of payable copper includes cash operating costs, including treatment and refining charges ("TC/RC"), freight and distribution costs net of by-product credits. Cash Cost per pound of payable copper is consistent with the widely accepted industry standard established by Wood Mackenzie and is also known as the C1 cash cost.

AISC per pound of payable copper includes C1 Cash Costs plus royalties and agency fees, expenditures on rehabilitation, capitalised stripping costs, exploration and geology costs, corporate costs and sustaining capital expenditures.

Realised price per pound of payable copper is the value of the copper payable included in the concentrate produced before deducting the penalties, discounts, credits and other features governed by the offtake agreements of the Group and all discounts or premiums provided in commodity hedge agreements with financial institutions, expressed in USD per pound of payable copper. Realised price is consistent with the widely accepted industry standard definition.

6. Liquidity and capitalresources

Atalaya monitors factors that could impact its liquidity as part of Atalaya's overall capital management strategy. Factors that are monitored include, but are not limited to, the market price of copper, foreign currency rates, production levels, operating costs, capital and administrative costs.

The following is a summary of Atalaya's cash position and cash flows as at 31 March 2019 and 31 December 2018.

Liquidity information

(Euro 000's)

31 March 2019

31 December 2018

Unrestricted cash and cash equivalents at Group level

22,089

24,357

Unrestricted cash and cash equivalents at Operation level

1,707

8,463

Restricted cash

250

250

Working capital surplus

9,010

8,435

Unrestricted cash and cash equivalents as at 31 March 2019 decreased to ?,?23.8 million from ?,?32.8 million at 31 December 2018. The decrease in cash balances is the result of net cash flow incurred in the period. Cash balances are unrestricted and include balances at operational and corporate level.

Restricted cash remains at ?,?0.3 million as at 31 March 2019 and mainly relates to deposit bond guarantees.

6. Liquidityand capital resources (continued)

As of 31 March 2019, Atalaya reported a working capital surplus of ?,?9.0 million, compared with a working capital surplus of ?,?8.4 million at 31 December 2018. The main liability of the working capital is trade payables related to Proyecto Riotinto contractors. At 31 March 2019, trade payables have been reduced by circa 17% compared with the same period last year.

Overview of the Group'scash flows

(Euro 000's)

Three months ended

31 Mar 2019

Three months ended

31 Mar 2018

Cash flows from operating activities

8,114

18,377

Cash flows used in investing activities

(17,138)

(8,741)

Cash flows from financing activities

-

48

Net (decrease)/increase in cash and cash equivalents

(9,024)

9,684

Three months cash flows review

Cash and cash equivalents decreased by ?,?9.0 million during the three months ended 31 March 2019. This was due to the net results of cash from operating activities amounting to ?,?8.1 million and the cash used in investing activities amounting to ?,?17.1 million.

Cash generated from operating activities before working capital changes was ?,?20.3 million. Atalaya increased its trade receivables in the period by ?,?11.9 million, decreased its inventory levels by ?,?0.8 million and decreased its trade payables by ?,?1.0 million.

Investing activities during the quarter consumed ?,?17.1 million, relating mainly to the expansion project Capex and sustaining capex mostly in enhancements in processing systems of the plant.

Foreignexchange

Foreign exchange rate movements can have a significant effect on Atalaya's operations, financial position and results. Atalaya's sales are denominated in U.S. dollars ("USD"), while Atalaya's operating expenses, income taxes and other expenses are mainly denominated in Euros ("EUR"), and to a much lesser extent in British Pounds ("GBP").

Accordingly, fluctuations in the exchange rates can potentially impact the results of operations and carrying value of assets and liabilities on the balance sheet.

During the three months ended 31 March 2019, Atalaya recognised a foreign exchange profit of ?,?0.7 million. Foreign exchange losses mainly related to change in the period end EUR and USD conversion rates, as all sales are cashed and occasionally held in USD.

The following table summarises the movement in key currencies versus the EUR:

Three months ended

31 Mar 2019

Three months ended

31 Mar 2018

Average rates for the periods

GBP - EUR

0.8725

0.8833

USD - EUR

1.1358

1.2292

Spot rates as at

GBP - EUR

0.8583

0.8749

USD - EUR

1.1235

1.2321

7. Deferredconsideration

In September 2008, the Group moved to 100% ownership of Atalaya Riotinto Mineral S.L. ("ARM") (and thus full ownership of Proyecto Riotinto) by acquiring the remaining 49% of the issued capital of ARM. At the time of the acquisition, the Group signed a Master Agreement (the "Master Agreement") with Astor Management AG ("Astor") which included a deferred consideration of ?,?43.9 million (the "Deferred Consideration") payable as consideration in respect of the acquisition. The Company also entered into a credit assignment agreement at the same time with a related company of Astor, Shorthorn AG, pursuant to which the benefit of outstanding loans was assigned to the Company in consideration for the payment of ?,?9.1 million to Shorthorn (the "Loan Assignment").

The Master Agreement has been the subject of litigation in the High Court and the Court of Appeal that has now concluded. As a consequence, ARM must apply any excess cash (after payment of operating expenses, sustaining capital expenditure, any senior debt service requirements and up to US$10 million per annum (for non-Proyecto Riotinto related expenses)) to pay the consideration due to Astor (including the Deferred Consideration and the amount of ?,?9.1 million payable under the Loan Assignment). "Excess cash" is not defined in the Master Agreement leaving ambiguity as to how it is to be calculated.

As at 31 March 2019, no consideration has been paid.

The amount of the liability recognised by the Group is ?,?53 million. The effect of discounting remains insignificant, in line with 2018 assessment, and therefore the Group has measured the liability for the Astor deferred consideration on an undiscounted basis.

8. Corporatesocial responsibility

During the quarter, Atalaya has continued its involvement in social responsibility through several activities through Fundaci??n Atalaya Riotinto.

Continuing its work in education and entrepreneurship, the Company has renewed the Language School Program in cooperation with the City Council of Nerva, and has restarted the school visits program of the mining region to Atalaya ?s facilities.

The Company has launched the second edition of "el Reto Malacate": an initiative to reward the best business project to be settled in the region.

In cooperation with the City Hall of Minas de Riotinto, Atalaya has provided the necessary funding for the opening of the Museum of the Town, which contains large scale models that represent the old town of Minas de Riotinto.

Atalaya has also reached agreements with the towns of Nerva and Campofr?-o to, respectively, repopulate an important avenue with palm trees, and labelling through town ?s advertising to attract tourism.

Also, in collaboration with Asociaci??n Matilde, the Company has cooperated in a program consisting of restoring an organic local garden and selling its products to the market. People involved in this project comes from families at risk of social exclusion.

Atalaya has also taken part into the GAVI program (Business Alliance for Childhood Vaccination) in collaboration with the Fundaci??n La Caixa" and Bill & Melinda Gates Foundation.

9. Healthand safety

The prevention of occupational hazards has the highest priority in the Company. The investigation and the analysis of any type of accident is fully performed under the "methodology of the 5 whys" to both own personnel and contractors, even if the accident results in no lost time injury.

During Q1 2019 the Company worked alongside with contractors to strongly reinforce the compliance of safety regulations and accident prevention, establishing a quality assessment of the safety actions carried out by Atalaya.

In addition, the Company is running a program for the evaluation of psychosocial factors in the work environment. For this purpose, Atalaya and the employees 'representatives has formed a working group, supported by an external consulting company. The Company has given out a survey to all its personnel to be submitted on a voluntary basis and entirely confidential. The final results of the survey will be analysed by the external consultant and the Company will receive feedback in the coming months, so to implement a guideline in the improvement of working conditions.

9. Healthand safety (continued)

The Company is also developing a training program for high-risk activities. This program involves trainings in the assembling of lifelines, interlocking of equipment, working in cramped spaces, etc.

All these lines of work are resulting in enhancements of safety with respect to the previous year, meaning just two accidents with a minor loss in the first quarter of 2019.

The Company carries on working towards zero damages.

10. Environmentalmanagement

During the first quarter of 2019, the environmental department has continued executing the actions of environmental monitoring of the activity, management of the natural environment and the usual historical heritage. Key points of the quarter:

- An analysis of the evolution of the diffuse contamination has been performed, registering a 37% decrease in the pollutant load towards the Tinto and Odiel rivers, thanks to the restoration and water management actions carried out since the beginning of the mining operation.

- Results in terms of emissions to the atmosphere and air quality from 2018 have been analysed and veryfied that the limit values and established target values were met in all the controls carried out.

- Results from 2018 analysis showed a reduction of 16% in the production of hazardous waste and 25% in non-hazardous waste with respect to 2017.

Archaeological excavation work has continued, focusing on the Look Out site for its release as soon as possible.

11. Risk factors

Due to the nature of Atalaya's business in the mining industry, the Group is subject to various risks that could materially impact the future operating results and could cause actual events to differ materially from those described in forward-looking statements relating to Atalaya. Readers are encouraged to read and consider the risk factors detailed in Atalaya's audited, consolidated financial statements for the year ended 31 December 2018.

12. Criticalaccounting policies, estimates and accounting changes

The preparation of Atalaya's Financial Statements in accordance with IFRS requires management to make estimates and assumptions that affect amounts reported in the Financial Statements and accompanying notes. There is a full discussion and description of Atalaya's critical accounting policies in the audited consolidated financial statements for the year ended 31 December 2018.

13. Otherinformation

Additional information about Atalaya Mining Plc. is available at www.atalayamining.com

Interim ConsolidatedIncome Statements

(All amounts in Euro thousands unless otherwise stated)

For the three months to 31 March 2019 and 2018 - (Unaudited)

(Euro 000's)

Notes

Three months ended

31 March 2019

Three
months ended

31 March 2018

Revenue

4

51,712

52,676

Operating costs and mine site administrative expenses

(30,026)

(36,392)

Mine site depreciation and amortization

(3,426)

(4,100)

Gross profit

18,260

12,184

Administration and other expenses

(1,917)

(1,049)

Share-based benefits

(53)

(38)

Care and maintenance expenditure

(5)

-

Exploration expenses

(201)

(199)

Operating profit

16,084

10,898

Other income

-

Net foreign exchange gain

713

170

Net finance costs

5

(31)

(7)

Profit before tax

16,766

11,061

Tax

(2,611)

(2,271)

Profit for the period

14,155

8,790

Profit for the period attributable to:

- Owners of the parent

14,161

8,857

- Non-controlling interests

(6)

(67)

14,155

8,790

Earnings per share from operations attributable to equity holders of the parent during the period :

Basic earnings per share (EUR cents per share)

6

10.3

6.5

Fully diluted earnings per share (EUR cents per share)

6

10.2

6.5

Profit for the period

Other comprehensive income:

14,155

8,790

Change in fair value of financial assets through other comprehensive income 'OCI'

5

3

Total comprehensive profit for the period

14,160

8,793

Total comprehensive profit for the period attributable to:

- Owners of the parent

14,166

8,860

- Non-controlling interests

(6)

(67)

14,160

8,793

The notes on pages 13 to 26 are an integral part of these condensed interim consolidated financial statements.

Interim ConsolidatedBalance Sheet

(All amounts in Euro thousands unless otherwise stated)

As at 31 March 2019 and 31 December 2018 - (Unaudited)

(Euro 000's)

Note

31 March 2019

31 December 2018

Assets

Non-current assets

Property, plant and equipment

7

271,589

257,376

Intangible assets

8

71,572

71,951

Trade and other receivables

10

250

249

Deferred tax asset

7,876

7,927

351,287

337,503

Current assets

Inventories

9

10,078

10,822

Trade and other receivables

10

34,340

23,688

Other financial assets

76

71

Cash and cash equivalents

24,046

33,070

68,540

67,651

Total assets

419,827

405,154

Equity and liabilities

Equity attributable to owners of the parent

Share capital

11

13,372

13,372

Share premium

11

314,319

314,319

Other reserves

12

22,055

12,791

Accumulated losses

(53,353)

(58,308)

296,393

282,174

Non-controlling interests

4,194

4,200

Total equity

300,587

286,374

Liabilities

Non-current liabilities

Trade and other payables

13

34

45

Provisions

14

6,672

6,519

Deferred consideration

15

53,000

53,000

59,706

59,564

Current liabilities

Trade and other payables

13

56,238

57,271

Current tax liabilities

3,296

1,945

59,534

59,216

Total liabilities

119,240

118,780

Total equity and liabilities

419,827

405,154

The notes on pages 13 to 26 are an integral part of these condensed interim consolidated financial statements.

Interim ConsolidatedStatements of Changes in Equity

(All amounts in Euro thousands unless otherwise stated)

For the three months to 31 March 2019 and 2018 - (Unaudited)

(Euro 000's)

Share

capital

Share premium(1)

Other reserves(2)

Accum.

losses

Total

Non-controlling interest

Total equity

At 1 January 2018

13,192

309,577

6,137

(86,527)

242,379

4,474

246,853

Profit for the period

-

-

-

8,857

8,857

(67)

8,790

Change in fair value of financial assets through OCI

-

-

3

-

3

-

3

Total comprehensive income

13,192

309,577

6,140

(77,670)

251,239

4,407

255,646

Transactions with owners

Issue of share capital

19

455

-

-

474

-

474

Depletion factor

-

-

5,050

(5,050)

-

-

-

Recognition of share-based payments

-

-

38

-

38

-

38

At 31 March 2018

13,211

310,032

11,228

(82,720)

251,751

4,407

256,158

Profit for the period

-

-

-

25,858

25,858

(207)

25,651

Change in fair value of financial assets through OCI

-

-

(61)

-

(61)

-

(61)

Total comprehensive income

13,211

310,032

11,167

(56,862)

277,548

4,200

281,748

Transactions with owners

Issue of share capital

161

4,292

-

-

4,453

-

4,453

Share issue costs

-

(5)

-

-

(5)

-

(5)

Recognition of non-distributable reserve

-

-

1,446

(1,446)

-

-

-

Recognition of share-based payments

-

-

178

-

178

-

178

At 31 December 2018/1 January 2019

13,372

314,319

12,791

(58,308)

282,174

4,200

286,374

Profit for the period

-

-

-

14,161

14,161

(6)

14,155

Change in fair value of financial assets through OCI

-

-

5

-

5

-

5

Total comprehensive income

13,372

314,319

12,796

(44,147)

296,340

4,194

300,534

Transactions with owners

-

-

-

-

Recognition of share-based payments

-

-

53

-

53

-

53

Recognition of depletion factor

-

-

5,378

(5,378)

-

-

-

Recognition of non-distributable reserve

-

-

1,984

(1,984)

-

-

-

Recognition of distributable reserve

-

-

1,844

(1,844)

-

-

-

At 31 March 2019

13,372

314,319

22,055

(53,353)

296,393

4,194

300,587

(1) The share premium reserve is not available for distribution

(2) Refer to Note 12

The notes on pages 13 to 26 are an integral part of these condensed interim consolidated financial statements.

Interim ConsolidatedStatements of Cash Flows

(All amounts in Euro thousands unless otherwise stated)

For the three months to 31 March 2019 and 2018 - (Unaudited)

(Euro 000's)

Notes

Three months ended

31 March

2019

Three

months ended

31 March

2018

Cash flows from operating activities

Profit before tax

16,766

11,061

Adjustments for:

Depreciation of property, plant and equipment

7

2,604

3,070

Amortisation of intangibles

8

822

1,030

Recognition of share-based payments

12

53

38

Interest income

5

(3)

(20)

Interest expense

5

4

1

Unwinding of discounting

5

30

26

Legal provisions

14

2

(20)

Loss in disposal of property, plant and equipment

7

2

-

Unrealised foreign exchange loss on financing activities

(1)

(25)

Cash inflows from operating activities before working capital changes

20,279

15,161

Changes in working capital:

Inventories

9

744

4,080

Trade and other receivables

10

(11,861)

(956)

Trade and other payables

13

(1,044)

76

Deferred consideration

15

-

17

Cash flows from operations

8,118

18,378

Interest paid

(4)

(1)

Net cash from operating activities

8,114

18,377

Cash flows from investing activities

Purchase of property, plant and equipment

(16,698)

(8,280)

Purchase of intangible assets

8

(443)

(481)

Interest received

5

3

20

Net cash used in investing activities

(17,138)

(8,741)

Cash flows from financing activities

Proceeds from issue of share capital

-

48

Net cash flows from financing activities

-

48

Net (decrease) / increase in cash and cash equivalents

(9,024)

9,684

Cash and cash equivalents:

At beginning of the period

33,070

42,856

At end of the period

24,046

52,540

The notes on pages 13 to 26 are an integral part of these condensed interim consolidated financial statements.

Notes to the CondensedInterim Consolidated Financial Statements

(All amounts in Euro thousands unless otherwise stated)

For the three months to 31 March 2019 and 2018 - (Unaudited)

1.Incorporation and summary of business

Countryof incorporation

Atalaya Mining Plc (the "Company") was incorporated in Cyprus on 17 September 2004 as a private company with limited liability under the Companies Law, Cap. 113 and was converted to a public limited liability company on 26 January 2005. Its registered office is at 1 Lampousa Street, Nicosia, Cyprus.

The Company was listed on AIM of the London Stock Exchange in May 2005 under the symbol ATYM and on the TSX on 20 December 2010 under the symbol AYM. The Company continued to be listed on AIM and the TSX as at 31 March 2019.

Additional information about Atalaya Mining Plc is available at www.atalayamining.com as per requirement of AIM rule 26.

Changeof name and share consolidation

Following the Company's Extraordinary General Meeting ("EGM") on 13 October 2015, the change of name from EMED Mining Public Limited to Atalaya Mining Plc became effective on 21 October 2015. On the same day, the consolidation of ordinary shares came into effect, whereby all shareholders received one new ordinary share of nominal value Stg ?0.075 for every 30 existing ordinary shares of nominal value Stg ?0.0025.

Principalactivities

The Company owns and operates through a wholly-owned subsidiary, "The Riotinto project", an open-pit copper mine located in the Pyritic belt, in the Andalusia region of Spain, approximately 65 km northwest of Seville. A brownfield expansion of this mine is in progress.

In addition, the Company has a phased earn-in agreement to up 80% ownership of "The Touro project", a brownfield copper project in northwest Spain, which is currently at the permitting stage.

The Company's and its subsidiaries' business is to explore for and develop metals production operations in Europe, with an initial focus on copper.

The strategy is to evaluate and prioritise metal production opportunities in several jurisdictions throughout the well-known belts of base and precious metal mineralisation in Spain and the Eastern European region.

2. Basisof preparation and accounting policies

2.1Basis of preparation

(a) Overview

The condensed interim consolidated financial statements have been prepared in accordance with International Financial Reporting Standards (IFRS). IFRS comprise the standard issued by the International Accounting Standard Board ("IASB"), and IFRS Interpretations Committee ("IFRICs") as issued by the IASB. Additionally, the consolidated financial statements have also been prepared in accordance with the IFRS as adopted by the European Union (EU), using the historical cost convention.

These condensed interim consolidated financial statements are unaudited and include the financial statements of the Company and its subsidiary undertakings. They have been prepared using accounting bases and policies consistent with those used in the preparation of the consolidated financial statements of the Company and the Group for the year ended 31 December 2018. These condensed interim consolidated financial statements do not include all of the disclosures required for annual financial statements, and accordingly, should be read in conjunction with the consolidated financial statements and other information set out in the Company's 31 December 2018 Annual Report. The accounting policies are unchanged from those disclosed in the annual consolidated financial statements.

The Directors have formed a judgment at the time of approving the financial statements that there is a reasonable expectation that the Company and the Group have adequate available resources to continue in operational existence for the foreseeable future.

2. Basisof preparation and accounting policies (cont.)

2.1Basis of preparation (cont.)

(b) Going concern

These consolidated financial statements have been prepared on the basis of accounting principles applicable to a going concern which assumes that the Group will realise its assets and discharge its liabilities in the normal course of business. Management has carried out an assessment of the going concern assumption and has concluded that the Group will generate sufficient cash and cash equivalents to continue operating for the next twelve months.

2.2Adoption of new and revised International Financial Reporting Standards (IFRSs)

The Group has adopted all the new and revised IFRSs and International Accounting Standards (IASs) which are relevant to its operations and are effective for accounting periods commencing on 1 January 2019. The adoption of these Standards did not have a material effect on the condensed interim consolidated financial statements.

IFRS 16 - Leases

The new standard on leases that replaces IAS 17, IFRIC 4, SIC-15 and SIC-27. Under the provisions of the standard most leases, including the majority of those previously classified as operating leases, will be brought onto the statement of financial position, as both a right-of-use asset and a largely offsetting lease liability. The right-of-use asset and lease liability are both based on the present value of lease payments due over the term of the lease, with the asset being depreciated in accordance with IAS 16 'Property, Plant and Equipment' and the liability increased for the accretion of interest and reduced by lease payments.

As of the date of the Report, Atalaya has completed the assessment of the potential impact of IFRS 16 on its consolidated financial statements concluding that there is no material impact. The actual impact of applying IFRS 16 on the consolidated financial statements in the period of initial application will depend on future economic conditions, including the Group ?s borrowing rate at 1 January 2019, the composition of Atalaya ?s borrowing rate at 1 January 2019, the composition of Atalaya ?s portfolio at that date, its latest assessment of whether it will exercise any lease renewal options, and the extent to which Atalaya chooses to use practical expedients and recognition exemptions. The directors continue to consider the potential effects on the Group's financial statements and do not currently expect that there will be a material impact, given the current market and internal conditions.

2.3Fair value estimation

The fair values of the Group's financial assets and liabilities approximate their carrying amounts at the reporting date.

The fair value of financial instruments traded in active markets, such as publicly traded trading and other financial assets is based on quoted market prices at the reporting date. The quoted market price used for financial assets held by the Group is the current bid price. The appropriate quoted market price for financial liabilities is the current ask price.

The fair value of financial instruments that are not traded in an active market is determined by using valuation techniques. The Group uses a variety of methods, such as estimated discounted cash flows, and makes assumptions that are based on market conditions existing at the reporting date.

Fairvalue measurements recognised in the consolidated statement of financialposition

The following table provides an analysis of financial instruments that are measured subsequent to initial recognition at fair value, Grouped into Levels 1 to 3 based on the degree to which the fair value is observable.

?EUR? Level 1 fair value measurements are those derived from quoted prices (unadjusted) in active markets for identical assets or liabilities.

?EUR? Level 2 fair value measurements are those derived from inputs other than quoted prices included within Level 1 that are observable for the asset or liability, either directly (i.e. as prices) or indirectly (i.e. derived from prices).

?EUR? Level 3 fair value measurements are those derived from valuation techniques that include inputs for the asset or liability that are not based on observable market data (unobservable inputs).

2. Basisof preparation and accounting policies (cont.)

2.3Fair value estimation (cont.)

Financial assets

(Euro 000's)

Level 1

Level 2

Level 3

Total

31 March 2019

Other financial assets

Financial assets at FV through OCI

76

-

-

76

Trade and other receivables

Receivables (subject to provisional pricing)

-

15,474

-

15,474

Total

76

15,474

-

15,550

31 December 2018

Other financial assets

Financial assets at FV through OCI

71

-

-

71

Trade and other receivables

Receivables (subject to provisional pricing)

-

6,959

-

6,959

Total

71

6,959

-

7,030

2.4Critical accounting estimates and judgements

The preparation of the financial statements requires management to make judgements, estimates and assumptions that affect the reported amounts of revenues, expenses, assets and liabilities, and the accompanying disclosures, and the disclosure of contingent liabilities at the date of the consolidated financial statements. Estimates and assumptions are continually evaluated and are based on management's experience and other factors, including expectations of future events that are believed to be reasonable under the circumstances. Uncertainty about these assumptions and estimates could result in outcomes that require a material adjustment to the carrying amount of assets or liabilities affected in future periods.

Provisions are recognised when the Group has a present legal or constructive obligation as a result of past events, it is probable that an outflow of resources will be required to settle the obligation, and a reliable estimate of the amount can be made. If the effect of the time value of money is material, provisions are discounted using a current pre-tax rate that reflects, where appropriate, the risks specific to the liability. Where discounting is used, the increase in the provision due to the passage of time is recognised as a finance cost.

A full analysis of critical accounting estimates and judgements is set out in Note 3.4 to the 2018 audited financial statements.

3.Business and geographical segments

Businesssegments

The Group has only one distinct business segment, being that of mining operations, which include mineral exploration and development.

Copper concentrates produced by the Group are sold to three off-takers as per the relevant offtake agreement (Note 18.3)

Geographicalsegments

The Group's mining activities are located in Spain. The commercialisation of the copper concentrates produced in Spain is carried out through Cyprus. Sales transactions to related parties are on arm's length basis in a similar manner to transaction with third parties. Accounting policies used by the Group in different locations are the same as those contained in Note 2.

(Euro 000's)

Cyprus

Spain

Other

Total

Three months ended 31 March 2019 (*)

Revenue

3,325

48,387

-

51,712

Earnings/(loss) Before Interest, Tax, Depreciation and Amortisation (EBITDA)

1,703

17,900

(93)

19,510

Depreciation/amortisation charge

-

(3,426)

-

(3,426)

Net foreign exchange (loss) / gain

447

226

-

713

Finance income

-

3

-

3

Finance cost

-

(34)

-

(34)

Profit/(loss) before tax

2,150

14,709

(93)

16,766

Tax

(2,611)

Profit for the period

14,155

Total assets

38,835

380,338

654

419,827

Total liabilities

(14,552)

(104,531)

(157)

(119,240)

Depreciation of property, plant and equipment

-

2,604

-

2,604

Amortisation of intangible assets

-

822

-

822

Total additions of non-current assets

-

17,256

-

17,256

Three months ended 31 March 2018 (*)

Revenue

52,676

-

-

52,676

Earnings/(loss) Before Interest, Tax, Depreciation and Amortisation (EBITDA)

49,711

(34,708)

(5)

14,998

Depreciation/amortisation charge

-

(4,100)

-

(4,100)

Net foreign exchange gain/(loss)

454

(284)

-

170

Finance income

20

-

-

20

Finance cost

-

(27)

-

(27)

Profit/(loss) before tax

50,185

(39,119)

(5)

11,061

Tax

(2,271)

Profit for the period

8,790

Total assets

59,608

326,118

200

385,926

Total liabilities

(12,598)

(117,112)

(58)

(129,768)

Depreciation of property, plant and equipment

-

3,070

-

3,070

Amortisation of intangible assets

-

1,030

-

1,030

Total additions of non-current assets

-

9,096

-

9,096

(*) For the purposes of the geographical segment, in 2019 revenues have been reallocated between Cyprus and Span as per IFRS 15. Comparatives for 2018 have not been restated,

4. Revenue

(Euro 000's)

Three months ended

31 March 2019

Three months ended

31 March 2018

Revenue from contracts with customers

48,218

52,822

Fair value gain/(losses) relating to provisional pricing within sales (1)

3,494

(146)

Total revenue

51,712

52,676

All revenue from copper concentrate is recognised at a point in time when the control is transferred. Revenue from freight services is recognised over time as the services are provided.

(1) Provisional pricing impact represented the change in fair value of the embedded derivative arising on sales of concentrate.

5. Net finance cost

(Euro 000's)

Three months ended

31 March 2019

Three months ended

31 March 2018

Interest expense :

Other interest

4

1

Unwinding of discount on mine rehabilitation provision (Note 14)

30

26

Interest income(1)

(3)

(20)

31

7

(1) Interest income relates to interest received on bank balances

6. Earnings per share

The calculation of the basic and fully diluted loss per share attributable to the ordinary equity holders of the Company is based on the following data:

(Euro 000's)

Three months ended

31 March 2019

Three months ended

31 March 2018

Parent company

(904)

142

Subsidiaries

15,065

8,715

Profit attributable to equity holders of the parent

14,161

8,857

Weighted number of ordinary shares for the purposes of basic earnings per share (000's)

137,339

135,590

Basic profit/(loss) per share (EUR cents/share)

10.3

6.5

Weighted number of ordinary shares for the purposes of fully diluted earnings per share (000's)

138,306

137,202

Fully diluted profit per share (EUR cents/share)

10.2

6.5

At 31 March 2019 there are nil warrants (Note 11) and 913,000 options (Note 12) (2018: 262,569 warrants and 1,334,333 options) which have been included when calculating the weighted average number of shares for 2018.

7. Property, plant andequipment

(Euro 000's)

Land and buildings

Plant and machinery

Assets under construction(4)

Deferred mining costs(3)

Other assets(2)

Total

Cost

At 1 January 2018

40,995

145,402

11,445

22,317

785

220,944

Additions

370(1)

-

8,021

285

-

8,676

Reclassifications

-

70

(70)

-

-

-

At 31 March 2018

41,365

145,472

19,396

22,602

785

229,620

Additions

4,488(1)

2,324

47,638

4,935

-

59,385

Reclassifications

-

5,024

(5,024)

-

-

-

At 31 December 2018

45,853

152,820

62,010

27,537

785

289,005

Additions

166

413

15,486

754

-

16,819

Disposals

-

-

-

-

(5)

(5)

Reclassifications

-

183

(183)

-

-

-

At 31 March 2019

46,019

153,416

77,313

28,291

780

305,819

Depreciation

At 1 January 2018

4,076

13,465

-

3,469

476

21,486

Charge for the period

589

2,102

-

364

15

3,070

At 31 March 2018

4,665

15,567

-

3,833

491

24,556

Charge for the period

1,407

4,748

848

70

7,073

At 31 December 2018

6,072

20,315

-

4,681

561

31,629

Charge for the period

512

1,757

-

319

16

2,604

Disposals

-

-

-

-

(3)

(3)

At 31 March 2019

6,584

22,072

-

5,000

574

34,230

Net book value

At 31 March 2019

39,435

131,344

77,313

23,291

206

271,589

At 31 December 2018

39,781

132,505

62,010

22,856

224

257,376

(1) Mine rehabilitation assets and Rumbo Royalty Buyout.

(2) Includes motor vehicles, furniture, fixtures and office equipment which are depreciated over 5-10 years.

(3) Stripping costs

(4) Assets under construction at 31 March 2019 were ?,?77.3 million (2018: ?,?62.0 million) which include the capitalisation of costs related to the Expansion Project and sustaining capital expenditures.

The above fixed assets are located mainly in Spain.

8. Intangible assets

(Euro 000's)

Permits of Rio Tinto Project

Licences, R&D and software

Total

Cost

At 1 January 2018

76,521

4,505

81,026

Additions

17

464

481

At 31 March 2018

76,538

4,969

81,507

Additions

-

2,012

2,012

Disposals

-

(955)

(955)

At 31 December 2018

76,538

6,026

82,564

Additions

-

443

443

At 31 March 2019

76,538

6,469

83,007

Amortisation

On 1 January 2018

7,145

181

7,326

Charge for the period

1,019

11

1,030

At 31 March 2018

8,164

192

8,356

Charge for the period

2,206

51

2,257

At 31 December 2018

10,370

243

10,613

Charge for the period

806

16

822

At 31 March 2019

11,176

259

11,435

Net book value

At 31 March 2019

65,362

6,210

71,572

At 31 December 2018

66,168

5,783

71,951

(1) Permits and R&D include an amount of ?,?5.0 million and an amount of ?,?1.9 million respectively that relate to the Touro Project mining rights.

In July 2018, the Company announced an updated technical report on the mineral resources and reserves of The Riotinto Project. The Report increases the open pit mineral reserves by 29% and stated the life of mine as 13.8 years, considering the on-going expansion of the processing plant.

The ultimate recovery of balances carried forward in relation to areas of interest or all such assets including intangibles is dependent on successful development, and commercial exploitation, or alternatively the sale of the respective areas.

The Group conducts impairment testing on an annual basis unless indicators of impairment are not present at the reporting date. In considering the carrying value of the assets at The Riotinto Project, including the intangible assets and any impairment thereof, the Group assessed that no indicators were present as at 31 March 2019 and thus no impairment has been recognised.

9. Inventories

(Euro 000's)

31 March 2019

31 Dec 2018

Finished products

2,400

2,955

Materials and supplies

7,184

7,381

Work in progress

494

486

10,078

10,822

As of 31 March 2019, copper concentrate produced and not sold amounted to 2,936 tonnes (31 Dec 2018: 4,667 tonnes). Accordingly, the inventory for copper concentrate was ?,?2.4 million (31 Dec 2018: ?,?3.0 million). During the period the Group recorded cost of sales amounting to ?,?33.5 million (Q1 2018: ?,?40.5 million).

Materials and supplies relate mainly to machinery spare parts. Work in progress represents ore stockpiles, which is ore that has been extracted and is available for further processing.

10. Trade and otherreceivables

(Euro 000's)

31 March 2019

31 Dec 2018

Non-current

Deposits

250

249

250

249

Current

Trade receivables at fair value - subject to provisional pricing

6,628

4,498

Trade receivables from shareholders at fair value - subject to provisional pricing (Note 18.3)

8,846

2,461

Other receivables from related parties at amortised cost (Note 18.3)

56

56

Deposits

29

26

VAT receivable

15,189

13,691

Tax advances

-

1,208

Prepayments

2,082

688

Other current assets

1,510

1,060

34,340

23,688

Allowance for expected credit losses

-

-

Total current trade and other receivables

34,340

23,688

Trade receivables are shown net of any interest applied to prepayments. Payment terms are aligned with offtake agreements and market standards and generally are 7 days on 90% of the invoice and the remaining 10% at the settlement date which can vary between 1 to 5 months. The fair values of trade and other receivables approximate to their book values.

11. Share capital and share premium

Shares

000's

Share Capital

Stg ?'000

Share premium

Stg ?'000

Total

Stg ?'000

Authorised

Ordinary shares of Stg ?0.075 each*

200,000

15,000

-

15,000

Issued and fully paid

000's

Euro 000's

Euro 000's

Euro 000's

Balance at 31 December 2017/1 January 2018

135,254

13,192

309,577

322,769

13 Feb 2018 Shares issued to Rumbo at ?1.87

a)

193

16

410

426

13 Feb 2018 Exercised share options at ?1.44

b)

29

3

45

48

Balance at 31 March 2018

135,476

13,211

310,032

323,243

13 April 2018 Shares issued to Rumbo buyout at ?2.118

c)

1,601

139

3,887

4,026

1 June 2018 Exercised warrants at ?1.425

d)

263

22

405

427

Share issued costs

-

-

(5)

(5)

Balance at 31 December 2018/31 March 2019

137,340

13,372

314,319

327,691

Authorisedcapital

The Company's authorised share capital is 200,000,000 ordinary shares of Stg ?0.075 each.

Issuedcapital

2019

There were no changes in share capital during the three months ended 31 March 2019.

11. Share capital and sharepremium (continued)

2018

a) On 13 February 2018, the Company issued 192,540 new ordinary shares of ?0.075 to Rumbo at a price of ?1.867, thus creating a share premium of ?,?410,146.

b) On 13 February 2018, the Company was notified that certain employees exercised options over 29,000 ordinary shares of ?0.075 at a price of ?1.44, thus creating a share premium of ?,?44,576.

c) On 5 April 2018, the Company entered into an agreement with Rumbo to purchase the whole royalty agreement for a total consideration of US$4,750,000 to be paid through the issuance of 1,600,907 new ordinary shares of ?0.075 at a price of ?2.118 per share. After this transaction the share premium increased by ?,?3,887,128. On 13 April 2018, the new ordinary shares were issued to Rumbo.

d) On 1 June 2018, 262,569 warrants were exercised at ?1.425 per ordinary share. Hence, 262,569 new ordinary shares of ?0.075 were issued, thus creating a share premium of ?,?405,087.

Warrants

All warrants had been exercised in June 2018 (see d) above).

As at 31 March 2019, there were no warrants.

12. Other reserves

(Euro 000's)

Share option

Bonus share

Depletion factor(1)

Available-for-sale investment(2)

Fair value reserve of financial assets at FVOCI (3)

Non-Distributable reserve(4)

Distributable reserve(5)

Total

At 1 January 2018

6,536

208

450

(1,057)

6,137

Adjustment for initial application of IFRS 9

-

-

-

1,057

(1,057)

-

-

-

Recognition of depletion factor

-

-

5,050

-

-

-

-

5,050

Recognition of share based payments

38

-

-

-

-

-

-

38

Change in fair value of financial assets at fair value through OCI

-

-

-

-

3

-

-

3

At 31 March 2018

6,574

208

5,500

-

(1,054)

-

-

11,228

Recognition of non-distributable reserve

-

-

-

-

-

1,446

-

1,446

Recognition of share based payments

178

-

-

-

-

-

178

Change in fair value of financial assets at fair value through OCI

-

-

-

-

(61)

-

-

(61)

At 31 December 2018

6,752

208

5,500

-

(1,115)

1,446

-

12,791

Recognition of share based payments

53

-

-

-

-

-

-

53

Recognition of depletion factor

-

-

5,378

-

-

-

-

5,378

Recognition of non-distributable reserve

-

-

-

-

-

1,984

-

1,984

Recognition of distributable reserve

-

-

-

-

-

-

1,844

1,844

Change in fair value of financial assets at fair value through OCI

-

-

-

-

5

-

-

5

At 31 March 2019

6,805

208

10,878

-

(1,110)

3,430

1,844

22,055

12. Other reserves (continued)

(1) Depletion factor reserve

At 31 December 2018, the Group has disposed ?,?5,050k as a depletion factor reserve in order to fulfil with the Spanish Corporate Tax Act.

(2) Available-for-sale investments reserve

As at 31 December 2017 this reserve recorded fair value changes on available-for-sale investments. On disposal or impairment, the cumulative changes in fair value were recycled to the income statement. These assets were reclassified upon adoption of IFRS 9.

(3) Fair value reserve of financial assets at FVOCI

The Group has elected to recognise changes in the fair value of certain investments in equity securities in OCI, as explained in (2) above. These changes are accumulated within the FVOCI reserve within equity. The Group transfers amounts from this reserve to retained earnings when the relevant equity securities are derecognised.

(4) Non-distributable reserve

To comply with Spanish Law on Corporations, the Group needed to record a reserve when profit generated equal to a 10% of profit/(loss) for the year until 20% of share capital is reached.

(5) Distributable reserve

As result of the profit generated in 2018, the Group decided to record a distributable reserve.

In general, option agreements contain provisions adjusting the exercise price in certain circumstances including the allotment of fully paid ordinary shares by way of a capitalisation of the Company's reserves, a sub division or consolidation of the ordinary shares, a reduction of share capital and offers or invitations (whether by way of rights issue or otherwise) to the holders of ordinary shares.

Details of share options outstanding as at 31 March 2019:

Number of share options 000's

Outstanding options at 1 January 2019

1,313

- Expired during the reporting period

(400)

Outstanding options at 31 March 2018

913

13. Trade and otherpayables

(Euro 000's)

31 March 2019

31 Dec 2018

Non-current

Land options

21

32

Government grant

13

13

34

45

Current

Trade payables

51,252

53,098

Land options and mortgage

792

791

Accruals

4,194

3,382

56,238

57,271

Trade payables are mainly for the acquisition of materials, supplies and other services. These payables do not accrue interest and no guarantees have been granted. The fair value of trade and other payables approximate their book values.

Trade payables are non-interest-bearing and are normally settled on 60-day terms.

14. Provisions

(Euro 000's)

Legal costs

Rehabilitation costs

Total costs

1 January 2018

213

5,514

5,727

Additions

-

370

370

Revision of provision

(20)

-

(20)

Finance cost

-

26

26

At 31 March 2018

193

5,910

6,103

Additions

6

576

582

Revision of provision

(72)

(133)

(205)

Finance cost

-

39

39

At 31 December 2018

127

6,392

6,519

Additions

5

121

126

Revision of provision

(3)

-

(3)

Finance cost

-

30

30

At 31 March 2019

129

6,543

6,672

(Euro 000's)

31 March 2019

31 Dec 2018

Non-current

6,672

6,519

Current

-

-

Total

6,672

6,519

Rehabilitation provision

Rehabilitation provision represents the accrued cost required to provide adequate restoration and rehabilitation upon the completion of production activities. These amounts will be settled when rehabilitation is undertaken, generally over the project's life.

The discount rate used in the calculation of the net present value of the provision as at 31 March 2019 was 1.87%, which is the 15-year Spain Government Bond rate (31 December 2018: 1.87%, which is the 15-year Spain Government Bond rate). An inflation rate of 1.5% is applied on annual basis.

Legalprovision

The Group has been named a defendant in several legal actions in Spain, the outcome of which is not determinable as at 31 March 2019. Management has reviewed individually each case and made a provision of ?,?129 thousand for these claims, which has been reflected in these unaudited interim consolidated financial statements.

15. Deferred consideration

In September 2008, the Group moved to 100% ownership of Atalaya Riotinto Mineral S.L. ("ARM") (and thus full ownership of Proyecto Riotinto) by acquiring the remaining 49% of the issued capital of ARM. At the time of the acquisition, the Group signed a Master Agreement (the "Master Agreement") with Astor Management AG ("Astor") which included a deferred consideration of ?,?43.9 million (the "Deferred Consideration") payable as consideration in respect of the acquisition. The Company also entered into a credit assignment agreement at the same time with a related company of Astor, Shorthorn AG, pursuant to which the benefit of outstanding loans was assigned to the Company in consideration for the payment of ?,?9.1 million to Shorthorn (the "Loan Assignment").

The Master Agreement has been the subject of litigation in the High Court and the Court of Appeal that has now concluded. As a consequence, ARM must apply any excess cash (after payment of operating expenses, sustaining capital expenditure, any senior debt service requirements and up to US$10 million per annum (for non-Proyecto Riotinto related expenses)) to pay the consideration due to Astor (including the Deferred Consideration and the amount of ?,?9.1 million payable under the Loan Assignment). "Excess cash" is not defined in the Master Agreement leaving ambiguity as to how it is to be calculated.

As at 31 March 2019, no consideration has been paid.

15. Deferred consideration (continued)

The amount of the liability recognised by the Group is ?,?53 million. The effect of discounting remains insignificant, in line with prior year's assessment, and therefore the Group has measured the liability for the Deferred Consideration on an undiscounted basis.

16. Acquisition, incorporation and disposal of subsidiaries

There were neither acquisition, nor incorporation, nor disposal of subsidiaries during the three month period to 31 March 2019.

On 22 May 2019 the Group sold its remaining 10% in Eastern Mediterranean Minerals (Cyprus) Limited ("EMM"). Refer to events after reported date set out in Note 22.

17. Wind-up of subsidiaries

There were no operations wound-up during the three month period to 31 March 2019.

18. Related party transactions

The following transactions were carried out with related parties:

18.1Compensation of key management personnel

The total remuneration and fees of Directors (including Executive Directors) and other key management personnel was as follows:

(Euro 000's)

Three months ended

31 March 2018

Three months ended

31 March 2017

Directors' remuneration and fees

244

256

Share option-based benefits to directors

11

7

Key management personnel fees

114

119

Share option-based and other benefits to key management personnel

25

16

394

398

18.2 Share-basedbenefits

The directors and key management personnel have not been granted any options during the three month period ended 31 March 2019 (Q1 2018: nil).

18.3 Transactions with relatedparties/shareholders

i) Transaction with shareholders

(Euro 000's)

Three months ended

31 March 2019

Three months ended

31 March 2018

Trafigura- Revenue from contracts

11,677

10,061

Freight services

-

-

11,677

10,061

Gain / (losses) relating provisional pricing within sales

771

(485)

12,448

9,576

18. Related party transactions (continued)

ii) Period-end balances with related parties

(Euro 000's)

31 March 2019

31 Dec 2018

Receivables from related parties:

Recursos Cuenca Minera S.L.

56

56

Total (Note10)

56

56

The above balances bear no interest and are repayable on demand.

iii) Period-end balances with shareholders

(Euro 000's)

31 March 2019

31 Dec 2018

Trafigura - Debtor balance- subject to provisional pricing

8,846

2,461

Total (Note 10)

8,846

2,461

The above debtor balance arising from sales of goods and other balances bear no interest and is repayable on demand.

19. Contingent liabilities

Judicialand administrative cases

In the normal course of business, the Group may be involved in legal proceedings, claims and assessments. Such matters are subject to many uncertainties, and outcomes are not predictable with assurance. Legal fees for such matters are expensed as incurred and the Group accrues for adverse outcomes as they become probable and estimable.

The Junta de Andaluc?-a notified the Group of another disciplinary proceeding for unauthorised discharge in 2014. The Group submitted the relevant defence arguments on 10 March 2015 but has had no response or feedback from the Junta de Andaluc?-a since the submissions. Based on the time that has lapsed without a response, it is expected that the outcome of this proceedings will also be favourable for the Group. Once the necessary time has lapsed, the Group will ask for the Administrative File to be dismissed.

Receiptof rulings of claims made by an environmental Group

On 26 September 2018, Atalaya received notice from the Tribunal Superior de Justicia de Andaluc?-a ("TSJA") ruling in favour of certain claims made by environmental group Ecologistas en Accion ("EeA") against the government of Andaluc?-a ("Junta de Andaluc?-a" or "JdA") and Atalaya, as co-defendant in the case.

In July 2014, EeA had filed a legal claim to JdA with a request to declare null the Unified Environmental declaration (in Spanish, Authorization Ambiental Unificada, or "AAU") granted to Atalaya Riotinto Minera, S.L.U. dated 27 March 2014, which was required in order to secure the required mining permits for Proyecto Riotinto. The judgment, in spite of annulling the AAU on procedural grounds, made very clear that the AAU was correct and therefore, rejected the issues raised by EeA and confirmed the decision of JdA not to suspend the AAU.

The JdA filed for appeal to the Supreme Court. Although the claim was against the JdA, Atalaya, being an interested party in the process, voluntarily joined as co-defendant to ask for permission to appeal to the Supreme Court in Spain.

On 29 March 2019, Atalaya announced the receipt of notification from the Supreme Court in Spain stating that it does not have jurisdiction over the appeal made by the Junta de Andaluc?-a and the Company, which voluntary joined the appeal as con-defendant.

The main legal consequence of the Supreme Court rejection is the ruling of the TSJA dated 26 September 2018 is now final and enforceable and the environmental authority must repair the defect in the process. The Company is currently in discussions to the Junta de Andaluc?-a to resolve the formal defects identified by the Tribunal Superior de Justicia de Andaluc?-a.

19. Contingent liabilities (cont.)

In addition to the legal procedure described above, on 26 April 2019, the Company announced a judgment related to the Mining Permits to operate Proyecto Riotinto (the "Mining Permits") was handed down by the TSJA. The TSJA declared the Mining Permits are linked to the Environmental Permits, ruled by the same tribunal on September 2018. The new ruling on the Mining Permits is based on the requirement to have an AAU before issuing mining permits and therefore invalidates the existing Mining Permits. The TSJA has not accepted the requests by EeA for the cessation of activities at the mine and an increase in the scope of the environmental plan.

All the pending claims made by EeA have now been ruled by the TSJA. Atalaya continues to work with its legal advisors to evaluate the possibility of appealing the ruling and to ensure the Junta de Andaluc?-a addresses all procedural points raised in both rulings. The Company continues operating the mine normally as the rulings do not state the operation at Proyecto Riotinto is to be ceased, not even temporarily and it is still confident that the ruling will not impact its operations at Proyecto Riotinto. The JdA has publicly stated support for the continued and normal operations at the Riotinto mine.

20. Commitments

There have been no new commitments during the quarter.

21. Significant events

There have been no significant events during the quarter other than as disclosed in the financial statements and the notes above.

22. Events after the reporting period

Judgmenton the Mining Permits

On 26 April 2019, the Company announcement the ruling on the Mining Permits granted the by the Junta de Andaluc?-a. Note 19.

Disposalof subsidiary

On 20 March 2019, the Board of Directors approved the disposal of the 10% free-carried investment of Atalaya in Eastern Mediterranean Minerals (Cyprus) Limited ("EMM"), an exploration company with interest in Cyprus. On 22 May 2019 the Group sold its remaining 10% for an immaterial consideration in Eastern Mediterranean Minerals (Cyprus) Limited ("EMM").

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

SOURCE: Atalaya Mining Plc



View source version on accesswire.com:
https://www.accesswire.com/546318/Atalaya-Mining-PLC-Announces-1st-Quarter-Financial-Results

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok