Banyan Gold Reports 144.8 m of 0.74 g/t at the Powerline Deposit, Aurmac Project, Yukon

2021-09-08 / @accesswire

 

VANCOUVER, BC / ACCESSWIRE / September 8, 2021 / Banyan Gold Corp. (the "Company" or "Banyan") (TSXV:BYN) is pleased to release assay results from the final fifteen (15) drill holes of the Phase 1 program at the Powerline Deposit, AurMac Property, Yukon. Fifty (50) holes, totalling 10,476 metres ("m"), were drilled in a systematic 100 m centered grid completed in July 2021. Banyan is pleased that the results have increased the area of known gold mineralization by more than 650% (from 0.16 km2 to 1.22 km2) and demonstrated potential for additional growth of the deposit in all directions (Figures 1 &2). Phase 2 drilling at Powerline is ongoing.

Assay highlights from this series of drill results include:

  • 144.8 metres of 0.74 g/t Au from 7.6m in DDH AX-21-101
    • Including 47.5 m of 1.43 g/t Au from 7.6m
  • 60.9 metres of 0.41 g/t Au from 10.7m in DDH AX-21-103
  • 89.6 metres of 0.50 g/t Au from 6.4 m in DDH AX-21-111
  • 78.1 metres of 0.43 g/t Au from 129.5 m in DDH AX-21-112
  • 28.2 metres of 1.28 g/t Au from 8.8 m in DDH AX-21-113

"Results continue to demonstrate growth potential of the Powerline Deposit, with continuity of near-surface gold distributed in mineralized horizons concordant with the sub-horizontal mineralization model." states Tara Christie, President and CEO. "Banyan is well positioned to continue to rapidly advance our AurMac Project with our recent financing which will enable us to ramp up to three drills and plan to complete a total of 30,000 m drilling in 2021. Projects with the potential to host three to five million ounces, that are near-surface adjacent to an existing highway, communications and power infrastructure are extremely rare and will be in demand."

Powerline Zone
2021 Drilling at Powerline to date consists of ninety-five (95) diamond drill holes totalling 18,738 m. The May 25, 2020 Powerline resource was based on fifteen (15) drill holes totalling 2,269 m. Gold mineralization is interpreted to be associated with swaths of quartz veins dipping shallowly to the north, and within pyrrhotitic horizons with a dip to the south. The combination of the two controls of gold mineralization equate to sub-horizontal mineralization envelopes at the current drill hole spacing.

A video to accompany this news release and additional information is located on our website.

Image 1: Photographs of visible gold

Figure 1: 2021 Drill program at Powerline and Aurex Hill, showing historic, completed and planned diamond drill holes with interpreted area of influence for the Powerline Zone noted.

Figure 2: Plan map of Powerline Zone 2021 drill holes reported, planned and completed.

Table 1: 2021 Highlighted Powerline Diamond Drill Analytical Results

Hole ID

From (m)

To (m)

Interval* (m)

Au (g/t)

AX-21-101

7.6

152.4

144.8

0.74

Including

7.6

55.1

47.5

1.43

Including

65.5

67.5

2.0

1.62

Including

91.4

92.5

1.1

3.87

Including

100.1

101.6

1.5

8.32

Including

121.4

123.1

1.7

1.25

Including

128.0

129.5

1.5

2.13

Including

134.0

135.6

1.6

1.26

Including

150.9

152.4

1.5

3.99

AX-21-102

39.6

41.1

1.5

2.57

And

103.7

105.2

1.5

1.37

And

192.0

224.0

32.0

0.33

Including

221.0

222.5

1.5

1.05

AX-21-103

10.7

71.6

60.9

0.41

Including

44.2

45.5

1.3

3.43

Including

52.0

53.3

1.3

3.01

Including

65.5

68.6

3.1

2.45

And

93.0

118.9

25.9

0.22

Including

93.0

94.5

1.5

1.18

And

163.6

178.3

14.7

0.75

Including

166.2

167.6

1.4

4.82

Including

175.8

176.3

0.5

2.02

And

227.5

229.6

2.1

1.39

AX-21-104

29.0

93.5

64.5

0.20

Including

65.5

67.1

1.6

1.26

And

199.0

200.6

1.6

1.08

AX-21-105

9.1

18.4

9.3

0.68

Including

14.3

15.8

1.5

1.38

Including

17.0

18.4

1.4

1.54

And

76.7

92.0

15.3

0.92

Including

78.9

80.4

1.5

2.19

Including

90.2

92.0

1.8

4.04

And

128.8

133.4

4.6

1.17

AX-21-106

8.5

24.3

15.8

0.22

And

148.9

158.4

9.5

0.28

Including

148.9

149.4

0.5

1.30

AX-21-108

18.5

51.4

32.9

0.22

Including

37.5

38.1

0.6

2.79

And

142.8

148.9

6.1

0.44

And

187.6

189.0

1.4

7.90

AX-21-109

8.8

78.7

69.9

0.20

Including

14.9

15.7

0.8

1.45

Including

62.5

63.9

1.4

1.19

Including

77.7

78.7

1.0

1.57

And

103.1

214.9

111.8

0.20

Including

211.8

213.4

1.6

3.05

AX-21-110

10.7

22.9

12.2

0.28

And

173.7

175.2

1.5

1.63

AX-21-111

6.4

96.0

89.6

0.50

Including

9.2

10.7

1.5

1.20

Including

36.6

56.9

20.3

1.03

Including

86.9

88.5

1.6

1.28

Including

93.0

94.5

1.5

2.22

And

182.9

198.4

15.5

0.39

Including

192.0

193.6

1.6

2.06

AX-21-112

129.5

207.6

78.1

0.43

Including

129.5

131.5

2.0

1.99

Including

145.8

147.4

1.6

1.28

Including

149.1

150.6

1.5

1.20

Including

152.1

153.6

1.5

2.17

Including

167.2

168.7

1.5

1.39

Including

176.2

177.9

1.7

1.20

Including

179.4

180.9

1.5

1.56

Including

206.1

207.6

1.5

1.02

AX-21-113

8.8

37.0

28.2

1.28

Including

8.8

10.2

1.4

1.47

Including

12.2

13.7

1.5

2.20

Including

23.6

24.2

0.6

18.9

Including

24.2

34.7

10.5

1.57

And

45.7

48.8

3.1

0.45

And

95.4

103.4

8.0

0.19

And

120.3

132.6

12.3

0.31

And

195.1

201.2

6.1

0.56

AX-21-114

47.6

77.3

29.7

0.59

Including

50.2

51.8

1.6

3.75

Including

63.9

65.5

1.6

1.42

Including

73.0

73.8

0.8

6.76

And

129.2

167.7

38.5

0.23

Including

139.7

140.7

1.0

2.01

AX-21-115

128.0

144.5

16.5

0.51

Including

132.3

132.6

0.3

12.00

Including

143.3

144.5

1.2

1.10

* True widths are estimated to be greater than 90% of the reported intervals.

2021 Drilling Program Update
Phase 1 Drilling at AurMac included drilling at both the Powerline and Aurex Hill targets.

At Powerline, 10,476 m (50 holes) was drilled in a systematic, 100 m centered, drill grid designed to test the expansion potential of the Powerline Deposit. Drilling at Aurex Hill included eighteen (18) diamond drill holes totalling 4,386 m. Assay results are pending from the eighteen (18) drill holes at Aurex Hill and from the ongoing Phase 2, drilling at Powerline.

Phase 2 Drilling is designed to continue to expand the limits of the Powerline Deposit and is planned to continue until December 2021. 2022 drilling is planned to resume in February.

Banyan targets completing a total of 30,000 m of drilling in 2021 and similar amount in 2022.

Qualified Person
Paul D. Gray, P.Geo., Vice President of Exploration for the Company, is a "qualified person" as ‎defined under NI 43-101 and has reviewed and approved the content of this news release.‎

Upcoming Catalysts

  • Precious Metals Beaver Creek, September 8-11, 2021
    • Presentation September 10th at 4:40 pm MST
  • GCFF Virtual Conference 2021 - Global Resource Investment Conference, September 23, 2021 - Presentation 8:50 am PST
  • Mining Investment Americas, October 13-15, 2021
  • John Turmazos Webinar, October 13, 2021
  • Deutsch Godnesse (German Gold Show), November 12-13, 2021
  • 2021 Precious Metals Summit Zurich, November 15-17, 2021

COVID-19 Update
Banyan Gold continues to take proactive measures to protect the health and safety of our Yukon communities, our contractors and our employees from COVID 19 and exploration activities in 2021 will have additional safety measures in place, following and exceeding all the recommendations of Yukon's Chief Medical Officer. Over 90% of Banyan Gold employees and contractors on site are fully vaccinated.

About Banyan
Banyan's primary asset AurMac is adjacent to Victoria Gold's Eagle Gold Mine, in Canada's Yukon Territory, which announced commercial production on July 1, 2020. The AurMac initial resource of 903,945 oz Au (see Table 2 below) was announced in May 2020. Our major strategic shareholders include Alexco Resource Corp, Franklin Gold and Precious Metals Fund, Osisko Development, and Victoria Gold Corporation. Banyan is focused on gold exploration projects that have the geological potential, size of land package and proximity to infrastructure that is advantageous for a mineral project to have potential to become a mine. Our Yukon based projects both fit this model and our objective is to gain shareholder value by advancing projects in our pipeline.

The 173 sq km AurMac Property lies 30 km from Victoria Gold's Eagle Project and adjacent to Alexco's Keno Hill Silver District and is highly prospective for structurally controlled, intrusion related gold-silver mineralization. The property is located adjacent to the main Yukon highway and just off the main access road to the Victoria Gold open-pit, heap leach Eagle Gold mine. The AurMac Property benefits from a 3-phase powerline, existing Yukon Energy Corp. switching power station and cell phone coverage. Banyan has optioned the properties from Victoria Gold and Alexco respectively with a right to earn up to a 100% subject to royalties.

The 2020 Initial Mineral Resource Estimate prepared in accordance with National Instrument 43-101 ("NI 43-101") guidelines for the AurMac Property is 903,945 ‎ounces of gold. It is a near surface, road accessible pit constrained Mineral Resource contained in two near/on-surface deposits: The Airstrip and Powerline deposits. The Mineral Resource is summarized in Table 2 below.

Table 2: Pit-Constrained Inferred Mineral Resources at a 0.2 g/t Au Cut-Off - AurMac Property

Deposit

Classification

Tonnage
Tonnes

Average Au Grade
g/t

Au Content
oz

Airstrip

Inferred

45,997,911

0.524

774,926

Powerline

Inferred

6,578,609

0.610

129,019

Total Combined

Inferred

52,576,520

0.535

903,945

Notes: ‎

  1. The effective date for the Mineral Resource is May 25, 2020.
  2. Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, changes in global gold markets or other relevant issues.
  3. The CIM definitions were followed for classification of Mineral Resources. The quantity and grade of reported inferred Mineral Resources in this estimation are uncertain in nature ‎and there has been insufficient exploration to define these inferred Mineral Resources as an ‎indicated Mineral Resource and it is uncertain if further exploration will result in upgrading them to an ‎indicated or measured Mineral Resource category.
  4. Mineral Resources are reported at a cut-off grade of 0.2 g/t Au, using a US$/CAN$ exchange rate of 0.75 and constrained within an open pit shell optimized with the Lerchs-Grossman algorithm to constrain the Mineral Resources with the following estimated parameters: gold price of US$1,500/ounce, US$1.50/t mining cost, US$2.00/t processing cost, US$2.50/t G+A, 80% heap leach recoveries, and 45° pit slop.
  5. Mineral Resource Estimate prepared in accordance with 43-101 guidelines by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting Inc, with technical report filed July 7,2020.

The Hyland Gold Project, located 70 km Northeast of Watson Lake, Yukon, along the Southeast end of the Tintina Gold Belt is a sediment hosted, structurally controlled, intrusion related gold deposit, with a large land package (over 125 sq km), with the resource contained in the Main Zone area (900 m x 600 m) daylighting at surface and numerous other known surface gold targets. The Main Zone oxide zone is amenable to heap leach open pit mining, with column leach recoveries of 86%. The project has an existing gravel access road.

Table 3 shows the Hyland Main Zone Indicated Gold Resource Estimate, prepared in accordance with NI 43-101, at a 0.3 g/t gold equivalent cut-off, contains 8.6 million tonnes grading 0.85 g/t AuEq for 236,000 AuEq ounces with an Inferred Mineral Resource of 10.8 million tonnes grading 0.83 g/t AuEq for 288,000 AuEq ounces. NI 43-101 prepared by Robert Carne, Allan Armitage and Paul Gray on May 1, 2018.

Table 3: Hyland Main Zone Indicated Gold Resource Estimate

Cut-off Grade

(AuEq g/t)

In situ Tonnes

Au

Ag

AuEq

Grade (g/t)

Ozs

Grade (g/t)

Ozs

Grade (g/t)

Ozs

Indicated

0.3

8,637,000

0.78

216,000

7.04

1,954,000

0.85

236,000

Inferred

0.3

10,784,000

0.77

266,000

5.32

1,845,000

0.83

288,000

Notes: ‎

  1. Mineral resources which are not mineral reserves do not have demonstrated economic viability.
  2. All figures are rounded to reflect the relative accuracy of the estimate.
  3. Mineral resources are reported at a cut-off grade of 0.3 g/t AuEq. AuEq grade is based on $1,350.00/oz Au, $17.00/oz Ag and assumes a 100% recovery. The AuEq calculation does not apply any adjustment factors for difference in metallurgical recoveries of gold and silver. This information can only be derived from definitive metallurgical testing which has yet to be completed.

Banyan trades on the TSX-Venture Exchange under the symbol "BYN". For more information, please visit the corporate website at www.BanyanGold.com or contact the Company.

ON BEHALF OF BANYAN GOLD CORPORATION

(signed) "Tara Christie"

Tara Christie
President & CEO

For more information, please contact:
Tara Christie
Tel: (888) 629-0444
Email: tchristie@banyangold.com

David Rutt
Tel: (888) 629-0444
Email: drutt@banyangold.com

CAUTIONARY STATEMENT: Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This news release contains forward-looking information, which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, Banyan's objectives, goals or future plans, statements regarding exploration expectations, exploration or development plans and mineral resource estimates. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, uncertainties inherent in resource estimates , capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry, enhanced risks inherent to conducting business in any jurisdiction, and those risks set out in Banyan's public documents filed on SEDAR. Although Banyan believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Banyan disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Statements in this news release regarding Banyan which are not historical facts are "forward-looking statements" that involve risks and uncertainties. Such information can generally be identified by the use of forwarding-looking wording such as "may", "will", "expect", "estimate", "anticipate", "intend", "believe" and "continue" or the negative thereof or similar variations.

SOURCE: Banyan Gold Corp.



View source version on accesswire.com:
https://www.accesswire.com/663071/Banyan-Gold-Reports-1448-m-of-074-gt-at-the-Powerline-Deposit-Aurmac-Project-Yukon

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok