KELOWNA, BC, Jan. 23, 2019 /CNW/ - Cantex Mine Development Corp. (CD: TSXV) (the "Company") is pleased to announce details of the upcoming work program on its 100% owned 14,077 hectare North Rackla claim block.
Geophysics
Ground magnetic, electromagnetic, resistivity and gravity surveys are planned over 1 km2 covering 2.3 kilometres of the strike length of the massive sulphide zone. These surveys will be focused on determining the exact location of the massive sulphide mineralization beneath a region covered in glacial till between the Discovery and Extension zones. The results will be used to fine tune the proposed drill program as well as test areas at the extremities of the mineralized zone.
In addition, ground geophysics is proposed over a surrounding 6 km2 area in which the Company's soil-talus sampling has identified anomalous silver-lead-zinc values.
Drilling
The Company will be utilizing three diamond drills on the project this year. One core drill is currently on site, a second drill is currently being refurbished and a third new drill has been ordered and is nearing completion. These drill rigs will be tasked with completing a 75 hole, 17,000 metre drill program on the massive sulphide zone and a three hole 1,000 metre program at the northern gold area.
Geochemistry
Within the North Rackla claim block there are numerous discrete areas where the Company's previous widely spaced soil-talus sample lines have detected anomalous metal values. Infill sample lines are proposed in the areas, with an additional 7,500 soil-talus samples planned. This work should constrain the bedrock sources of these anomalies.
Mineralogy
CF Minerals has undertaken scanning electron microscope and electron microprobe studies of the mineralization intersected at the Extension Zone last year and reports that the massive sulphides consist of fine to coarse grained sphalerite (zinc sulphide) intergrown with galena (lead sulphide) and microcrystalline to coarsely crystalline light brown to grey siderite (iron carbonate).
The sphalerite is essentially pure zinc sulphide with up to 1% iron but without other elements such as cadmium.
The galena locally contains +/- 5 micron elongated blebs of silver bearing tetrahedrite-tennanite series minerals containing silver, copper, zinc and antimony.
The siderite analysed was iron rich, typically 38.7% iron oxide, 13.4% manganese oxide and 7.2% magnesium oxide together with stochiometric lead and zinc sulphides and some silica. Small amounts of pyrite are occasionally present.
Fine veinlets and vugs of siderite locally intergrown with galena and sphalerite are common. Vein quartz has not been observed but quartz occurs randomly in trace to small amounts as globules within the carbonates and adjacent to the sulphides.
The mineralogy and chemistry of the ore supports a Sedex (sedimentary exhalative) origin of the mineralization, similar to the Broken Hill Deposit.
Eleven sections of mineralized core have had their densities measured. Their specific gravities range from 2.93 to 4.69 g/cm3 with an average of 3.83 g/cm3.
Financing
The Company intends to complete a $10 to 15 million financing in February to fund the 2019 exploration program. The Board is considering various options, including a rights offering to existing shareholders.
AGM and Core Display
The Company is pleased to invite its shareholders to its Annual General Meeting at 1:30pm on Friday January 25th at the Ramada hotel in Kelowna, BC. In advance of the meeting shareholders are invited to view the core from last year's drilling between the hours of 11am and 12:30pm at the premises of CF Mineral Research Ltd., located at 1677 Powick Rd., Kelowna BC.
Summary
The Directors are exceedingly optimistic about the summer program and hope to prove out one kilometer of the 2.4 kilometre long massive sulphide zone which has been identified by soil-talus sampling, prospecting, trenching and drilling.
The technical information and results reported here have been reviewed by Mr. Chad Ulansky P.Geol., a Qualified Person under National Instrument 43-101, who is responsible for the technical content of this release.
Signed,
Charles Fipke
Charles Fipke
Chairman
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Information set forth in this news release includes forward-looking statements under applicable securities laws. Forward-looking statements are statements that relate to future, not past, events. In this context, forward-looking statements often address expected future business and financial performance, and often contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements that an action or event "may", "might", "could", "should", or "will" be taken or occur, or other similar expressions. All statements, other than statements of historical fact, included herein including, without limitation; statements about the terms and completion of the proposed sale transaction are forward-looking statements. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, risks identified in the management discussion and analysis section of the Company's interim and most recent annual financial statement or other reports and filings with Canadian securities regulators. Forward looking statements are made based on management's beliefs, estimates and opinions on the date that statements are made and the respective companies undertakes no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change, except as required by applicable securities laws. Investors are cautioned against attributing undue certainty to forward-looking statements. THIS NEWS RELEASE IS NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR DISSEMINATION IN THE UNITED STATES.
SOURCE Cantex Mine Development Corp.
View original content: http://www.newswire.ca/en/releases/archive/January2019/23/c9973.html