NOT FOR DISSEMINATION OR DISTRIBUTION INTO THE UNITED STATES OR THROUGH UNITED STATES NEWSWIRE SERVICES
VANCOUVER, BC / ACCESSWIRE / December 8, 2021 / CMC Metals Ltd. (TSXV:CMB)(Frankfurt:ZM5N)(OTC PINK:CMCZF) ("CMC" or the "Company") is pleased to announce a very successful drill program at Silver Hart. This program produced multiple high-grade silver-lead-zinc intersections in the TM West Vein including 2.3 meters of 4,910.8 g/t silver equivalent. In total 2,100 meters (19 holes) of diamond drilling was completed, a majority of which focused on the TM West vein in the Main Zone. Drilling also resulted in an extension of the TM West Vein structure for 360 meters. The Main Zone requires a lot of additional drilling to fully evaluate the resource that exists within it. The Company notes that there is considerable opportunity to further extend the TM west vein and extend other known mineralized vein systems within the Main Zone at Silver Hart. This work will be incorporated into the planning and implementation of future drilling programs.
Highlights of the drill results include:
2021 Highlights of Drill Results | |||||||||||
Hole | From | To | Length | Silver | Copper | Lead | Zinc | Gold | Ag Eq | Comments | |
|
| (m) | (g/t) | (%) | (%) | (%) | (g/t) | (g/t) |
| ||
21-18 | 54.3 | 54.5 | 0.2 | 1153 | 0.37 | 0.34 | 24 | 1.1 | 2074.64 | ||
21-30 | 55.9 | 59.8 | 3.9 | 16.7 | - | 0.15 | 0.87 | 49.58 | |||
including | 58.2 | 58.5 | 0.3 | 67.9 | 0.04 | 0.2 | 8 | 343.73 | |||
21-31 | 62.0 | 70.6 | 8.6 | 295 | - | 0.1 | 0.57 | 316.57 | |||
including | 70.2 | 70.6 | 0.4 | 5279 | 0.84 | 0.5 | 21.1 | 6065.85 | |||
21-32 | 90 | 95.6 | 5.6 | 63.9 | - | 0.1 | 1.79 | 126.28 | |||
including | 94 | 95.6 | 1.6 | 125 | 0.07 | 0.2 | 5.57 | 322.03 | elevated copper and gold | ||
21-32 | 105 | 105.4 | 0.4 | 91.8 | 0.08 | 0.1 | 7.7 | 358.36 | |||
21-33 | 70.5 | 81.3 | 10.8 | 813 | 0.16 | 1.6 | 7.89 | 1130.32 | |||
including | 73 | 75.3 | 2.3 | 3590 | 0.66 | 6.6 | 32.9 | 4910.8 | |||
and | 81 | 81.3 | 0.3 | 177 | - | - | 13.8 | 638.47 | |||
21-34 | 65 | 66 | 1 | 167 | - | - | 1.3 | 207.48 | |||
21-35 | 88.4 | 89 | 0.6 | 26.2 | 0.03 | 0.05 | 4 | 163.69 | |||
and | 90 | 90.5 | 0.5 | 819 | 0.09 | 4.3 | 4.4 | 1082.09 | |||
21-36 | 61.6 | 62.1 | 0.5 | 29 | - | 0.1 | 2.8 | 125.15 | |||
Notes:
John Bossio, Chairman noted, "We are very pleased with the progress of delineating high-grade material in the Main Zone and results which are fulfilling our goal to establish additional resources in the Main Zone at Silver Hart. These results will now be integrated into our resource modelling and also help in planning further drilling which we hope to conduct in 2022. Further resource delineation at the Main Zone and preliminary testing of targets such as T1, T 4 and the hockey stick anomaly will require a minimum of 10,000 meters of drilling. We have a lot of work yet to do to truly understand the resource potential of Silver Hart."
Kevin Brewer, P.Geo, President and CEO noted, "In analyzing the successful results from this season there remains over 10 areas in the Main Zone alone yet to be drill investigated. As a result of successful drilling in 2019 and 2021 we are very confident that further drilling in the Main Zone will result in connectivity, down-dip and lateral extensions of the known mineralized areas and the possibility also remains to identify new mineralization. In addition, we have not even started to investigate the new targets at Silver Hart including possible extensions of the Main Zone, KW Zone, South Zone and Ridge Zone. As we have previously noted in press releases, these new targets are very encouraging with coincident positive results from geophysical, geochemical, prospecting and geological investigations. As a result, we see considerable exploration upside at Silver Hart with targets that merit further exploration by trenching and/or drilling. Silver Hart is at a pivotal stage where extensive drilling now needs to be the focus of future exploration efforts. We have spent the last two years conducting systematic exploration efforts, increased our exploration footprint by more than 1000%, and we are confident this will now culminate in the delineation of additional high-grade silver-lead-zinc deposits at Silver Hart amenable to both open pit and underground mining."
Other hole results showed zinc enrichment indicating that the holes were located in closed proximity to the heat source of the batholith and included:
Other Holes | Comments | ||
21-17 | 30-meter zone of zinc enrichment | ||
21-19 | results pending | ||
21-20 | elevated zinc up to 1.7% | ||
21-22 | elevated zinc | ||
21-23 | elevated zinc throughout | ||
21-24 | 6 meters of 1.1-2.3% zinc @21.0-27.0 meters | ||
21-25 | no intersection | ||
21-26 to 21-28 | assays pending | ||
21-29 | Elevated silver and zinc values, core recovery poor | ||
21-36 | elevated zinc |
The Company is now in the process of developing its strategic plan for 2022 and has just returned from attending Mines and Money Conference in London and meetings with potential investor groups/individuals. Upcoming activities will include the release of final drill and geochemical results from Silver Hart and other properties, and attendance at the Vancouver Resource Investment Conference and the Cordilleran Roundup in January 2022. Other activities will include the filing of permits for Amy, Silverknife, Bridal Veil and Terra Nova and field reporting.
About CMC Metals Ltd.
CMC Metals Ltd. is a growth stage exploration company focused on opportunities high graded polymetallic deposits in Yukon, British Columbia and Newfoundland and Labrador. Our silver-lead-zinc prospects in the Rancheria Silver District include the Silver Hart Deposit and Blue Heaven claims (the "Silver Hart Project") in Yukon, and Rancheria South, Amy and Silverknife claims (the "Rancheria South Project") in British Columbia. Our polymetallic projects with potential for copper-silver-gold and other metals include Logjam (Yukon), Bridal Veil and Terra Nova (both in Newfoundland).
On behalf of the Board:
"John Bossio"
John Bossio, Chairman
CMC METALS LTD.
For Further Information and Investor Inquiries:
Kevin Brewer, P. Geo., MBA, B.Sc.(Hons), Dip. Mine Eng.
President, CEO and Director
Tel: (604) 670-0019
kbrewer80@hotmail.com
Suite 615-800 West Pender St.
Vancouver, BC
V6C 2V6
To be added to CMC's news distribution list, please send an email to info@cmcmetals.ca or contact Mr. Kevin Brewer at 604-670-0019.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
"This news release may contain certain statements that constitute "forward-looking information" within the meaning of applicable securities law, including without limitation, statements that address the timing and content of upcoming work programs, geological interpretations, receipt of property titles and exploitation activities and developments. In this release disclosure regarding the potential to undertake future exploration work comprise forward looking statements. Forward-looking statements address future events and conditions and are necessarily based upon a number of estimates and assumptions. While such estimates and assumptions are considered reasonable by the management of the Company, they are inherently subject to significant business, economic, competitive and regulatory uncertainties and risks, including the ability of the Company to raise the funds necessary to fund its projects, to carry out the work and, accordingly, may not occur as described herein or at all. Actual results may differ materially from those currently anticipated in such statements. Factors that could cause actual results to differ materially from those in forward looking statements include market prices, exploitation and exploration successes, the timing and receipt of government and regulatory approvals, the impact of the constantly evolving COVID-19 pandemic crisis and continued availability
of capital and financing and general economic, market or business conditions. Readers are referred to the Company's filings with the Canadian securities regulators for information on these and other risk factors, available at www.sedar.com. Investors are cautioned that forward-looking statements are not guarantees of future performance or events and, accordingly are cautioned not to put undue reliance on forward-looking statements due to the inherent uncertainty of such statements. The forward-looking statements included in this news release are made as of the date hereof and the Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by applicable securities legislation."
SOURCE: CMC Metals Ltd.