Copper Mountain Announces Continued Positive Drill Results at New Ingerbelle, Extends Mineralization to the West

2022-01-20 / @newswire

 

VANCOUVER, BC, Jan. 20, 2022 /CNW/ - Copper Mountain Mining Corporation (TSX: CMMC) (ASX:C6C) (the "Company" or "Copper Mountain") is pleased to announce positive results from an additional 10 diamond drill holes, totalling 4,178 metres, as part of the ongoing exploration program at the New Ingerbelle copper-gold open pit ("New Ingerbelle"). The drill program continues to intersect significant widths of high-grade mineralization below, and adjacent to, the current reserve pit. New Ingerbelle is situated one kilometre from the Copper Mountain Mine main pit. The Copper Mountain Mine is in southern British Columbia, near the town of Princeton.  

The location of the 10 drill holes is shown on a map and a longitudinal section of the deposit in Figures 1 and 2.  A complete drill hole summary is provided in Table 1. Figures 3 and 4 show the location of all drill holes in the current New Ingerbelle drill program. 

"Drilling at New Ingerbelle continues to expand the size of the deposit" commented Gil Clausen, Copper Mountain's President and CEO. "The ongoing drill program has extended the New Ingerbelle mineralization at depth as well as along strike and the deposit remains open in a number of directions. Based on the positive drilling results from the current program, we expect to substantially increase the Mineral Reserve and Mineral Resource estimate at our Copper Mountain Mine.  We plan on announcing an updated Mineral Reserve and Mineral Resource estimate, which will include all drill results from this ongoing drill program along with a new life of mine plan based on a mine/mill expansion by mid-2022. We believe this new plan will demonstrate the scale potential of the Copper Mountain Mine."

Drill Program

The ten drill holes are in the central and western parts of the deposit and have been successful to date in testing the extent and continuity of mineralization at depth and westward below an interpreted, ore-bounding thrust fault. Mineralization remains open below the thrust fault and further drilling will be required to determine the western extent of the deposit.

Mineralization at New Ingerbelle consists of disseminated and fracture-controlled sulphide mineralization and exhibits a strong continuity over hundreds of metres of vertical extent. Geology, alteration intensity and copper/gold ratios appear to be relatively consistent over the vertical extent of the mineralization.

The Company is continuing to drill at New Ingerbelle, with two diamond drills on site. The current program consists of approximately 27,000 metres of diamond drilling and is expected to be completed in the first quarter of 2022. The Company plans to incorporate the results of the 2021-2022 drill program into an updated Mineral Reserves and Mineral Resources estimate, which will in turn support a new "Life of Mine Plan" which is expected to be published in mid-2022.

New Ingerbelle is a past producing open pit that was discovered and developed in the late 1960s with mining taking place between 1972 and 1980. Copper Mountain started exploration drilling at New Ingerbelle in 2017. New Ingerbelle's current Mineral Reserve estimate as of January 1, 2021, is 191 million tonnes grading 0.24% Cu, 0.15 g/t Au and 0.48 g/t Ag, containing 1.0 billion lb Cu, 916k oz Au and 2.9 million oz Ag (as disclosed in Copper Mountain's Annual Information Form dated March 29, 2021, available on SEDAR). 


Figure 1: Plan View (Drill Hole Location Map) (CNW Group/Copper Mountain Mining Corporation)

Figure 2 Longitudinal Section (CNW Group/Copper Mountain Mining Corporation)

Figure 3: Plan View of 2021-2022 Drill Program Holes (CNW Group/Copper Mountain Mining Corporation)

Notes:
1.  Planned hole locations may change depending on results and operational constraints.


Figure 4: Longitudinal Section of 2021-2022 Drill Program Holes (CNW Group/Copper Mountain Mining Corporation)

Notes:
1.  Planned hole locations may change depending on results and operational constraints.


Table 1: Drill Hole Table(1,2)

Hole ID

Azi

Dip

Length (m)

From (m)

To (m)

Interval (m)

Cu%

Ag g/t

Au g/t

Cu Eq %(3)

21IG-21

59.8

-56.5

635

54

170

116

0.30

0.55

0.24

0.44




Incl

54

96

42

0.30

0.52

0.32

0.49




Incl

104

142

38

0.37

0.72

0.23

0.50




Incl

142

170

28

0.26

0.45

0.17

0.36





194

221

27

0.19

0.28

0.08

0.23





239

332

93

0.21

0.46

0.12

0.28




Incl

239

281

42

0.17

0.36

0.07

0.21




Incl

290

332

42

0.28

0.63

0.21

0.40





356

365

9

0.17

0.36

0.12

0.24





374

431

57

0.23

0.46

0.19

0.34





461

551

90

0.21

0.42

0.14

0.29

21IG-22

262.0

-46.0

401

11

45

34

0.46

0.98

0.29

0.63





59

113

54

0.24

0.63

0.19

0.35




Incl

59

97

38

0.30

0.79

0.23

0.44




Incl

99

113

14

0.12

0.28

0.07

0.16





182

212

30

0.18

0.41

0.09

0.23





224

332

108

0.20

0.23

0.12

0.27




Incl

224

263

39

0.20

0.31

0.10

0.26




Incl

296

332

36

0.36

0.28

0.24

0.49












21IG-23

243.0

-57.0

446

18

41

23

0.43

0.78

0.27

0.59





104

152

48

0.28

0.51

0.16

0.37





215

248

33

0.54

0.70

0.33

0.73





353

425

72

0.40

0.41

0.20

0.51












21IG-24

301.0

-56.0

377

12

92

80

0.37

0.75

0.24

0.51





113

134

21

0.20

0.23

0.08

0.25





149

251

102

0.63

0.55

0.35

0.83












21IG-25

125.0

-77.0

705

38

90

52

0.36

0.68

0.21

0.48





100

106

6

0.54

1.05

0.26

0.70





116

134

18

0.15

0.24

0.07

0.19





155

170

15

0.27

0.58

0.17

0.36





203

272

69

0.29

0.55

0.19

0.40




Incl

203

215

12

0.22

0.51

0.14

0.30




Incl

224

272

48

0.35

0.64

0.23

0.48





296

527

231

0.31

0.46

0.12

0.38




Incl

296

482

186

0.35

0.53

0.13

0.43




Incl

488

497

9

0.19

0.14

0.06

0.22




Incl

509

527

18

0.13

0.21

0.06

0.17





557

572

15

0.20

0.25

0.06

0.24





617

665

48

0.15

0.17

0.05

0.18












21IG-26

58.0

-50.0

660

118

136

18

0.42

0.48

0.21

0.54





142

153

11

0.18

0.29

0.12

0.25





164

266

102

0.31

0.34

0.13

0.39





320

335

15

0.14

0.20

0.10

0.20





470

482

12

0.34

0.35

0.24

0.48





512

611

99

0.30

0.61

0.17

0.40




Incl

512

527

15

0.32

0.61

0.26

0.47




Incl

539

554

15

0.38

0.66

0.16

0.48




Incl

560

584

24

0.61

0.35

0.31

0.79




Incl

596

611

15

0.29

0.56

0.17

0.39












21IG-27

164

-51

374

177

215

38

0.38

0.71

0.25

0.53





245

260

15

0.53

0.97

0.22

0.67





293

335

42

0.22

0.92

0.14

0.30











0.00

21IG-28

303

-62

580

191

203

12

0.23

1.45

0.09

0.29





251

269

18

0.32

0.73

0.14

0.40





407

485

78

0.44

0.33

0.29

0.61

Notes:

1.  Holes 21IG-19 and 21IG-20 were lost due to ground conditions.

2.  Table shows detailed drill results of intercepts over 0.20% CuEq

3.  CuEq calculated using long-term bank consensus metal prices (in US$) of 3.43, 1,601, 21.04 and recoveries of 85%, 71%, 65% for Cu, Au, and Ag, respectively.

QA/QC and Core Sampling Protocols
Drill core is transported to the secure logging area by geological staff.  Sample intervals are marked on the core which is halved by diamond saw.  Sample size is usually 2m for HQ and 3m for NQ core diameters.  Blanks and field duplicates are inserted into the sample stream and the half core samples are taken to the mine laboratory where samples are dried, crushed, split, and pulverized.   The pulverized sample is analyzed by XRF methods, with samples containing greater than 0.4% Cu being re-analyzed by Atomic Adsorption (AA) methods by the mine laboratory which also reports on inserted certified reference standards.  Pulps from samples with greater than 0.1% Cu are shipped to an accredited commercial laboratory for Au and Ag analysis (either by Fire assay or AA methods) and every twentieth sample is analyzed for Cu and Ag by ICP multi-element analysis.   There are no known issues that would materially affect the accuracy or reliability of the analytical data from the drill program presented herein.

Competent Persons Statement
The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Peter Holbek, B.Sc (Hons), M.Sc. P. Geo. Mr. Holbek is a full time employee of the Company and has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Holbek consents to the inclusion in this news release of the matters based on the information in the form and context in which it appears.

Peter Holbek is a Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the technical content of this release.

About Copper Mountain Mining Corporation
Copper Mountain's flagship asset is the 75% owned Copper Mountain Mine located in southern British Columbia near the town of Princeton. The Copper Mountain Mine currently produces approximately 100 million pounds of copper equivalent per year, with average annual production expected to increase to approximately 140 million pounds of copper equivalent.  Copper Mountain also has the development-stage Eva Copper Project in Queensland, Australia and an extensive 2,100 km2 highly prospective land package in the Mount Isa area. Copper Mountain trades on the Toronto Stock Exchange under the symbol "CMMC" and Australian Stock Exchange under the symbol "C6C".

Additional information is available on the Company's web page at www.CuMtn.com.

On behalf of the Board of

COPPER MOUNTAIN MINING CORPORATION
"Gil Clausen"     

Gil Clausen, P.Eng.
President and Chief Executive Officer

Cautionary Note Regarding Forward-Looking Statements
This news release may contain forward-looking statements and forward-looking information (together, "forward-looking statements") within the meaning of applicable securities laws.  All statements, other than statements of historical facts, are forward-looking statements.  Generally, forward-looking statements can be identified by the use of terminology such as "plans", "expects", "estimates", "intends", "anticipates", "believes" or variations of such words, or statements that certain actions, events or results "may", "could", "would", "might", "occur" or "be achieved".  Forward-looking statements in this news release include statements concerning, among other things: ; the timing of the Company's drilling program at New Ingerbelle; the results of the Company's exploration and development programs; Mineral Resources, Mineral Reserves, realization of Mineral Reserves, and the existence or realization of Mineral Resource estimates; the timing of the Company's updated Mineral Reserves and Mineral Resources estimate and new life of mine plan for the Copper Mountain Mine; the timing of studies, announcements, and analysis; the potential to add the expected increase in the Company's average annual production; the Company's intentions regarding its objectives, goals or future plans; and all other timing, exploration, development, operational, financial, budgetary, economic, legal, social, environmental, regulatory, and political matters that may influence or be influenced by future events or conditions.  Forward-looking statements involve risks, uncertainties and other factors that could cause actual results, performance and opportunities to differ materially from those implied by such forward-looking statements.  Factors that could cause actual results to differ materially from these forward-looking statements include the successful exploration of the Company's properties in Canada and Australia, the reliability of the historical data referenced in this press release and risks set out in Copper Mountain's public documents, including in each management discussion and analysis, filed on SEDAR at www.sedar.com.  Although Copper Mountain believes that the information and assumptions used in preparing the forward-looking statements are reasonable, undue reliance should not be placed on these statements, which only apply as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all.  Except where required by applicable law, Copper Mountain disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise.

This press release includes Mineral Reserves and Mineral Resources classification terms that comply with reporting standards in Canada and the Mineral Reserves and the Mineral Resources estimates are made in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101"). NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ significantly from the requirements of the U.S. Securities and Exchange Commission ("SEC") set out in the SEC rules that are applicable to domestic United States reporting companies. Consequently, Mineral Reserves and Mineral Resources information included in this press release may not be comparable to similar information that would generally be disclosed by domestic U.S. reporting companies subject to the reporting and disclosure requirements of the SEC. Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/copper-mountain-announces-continued-positive-drill-results-at-new-ingerbelle-extends-mineralization-to-the-west-301464814.html

SOURCE Copper Mountain Mining Corporation

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/January2022/20/c0006.html

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok