VANCOUVER, British Columbia, Jan. 26, 2023 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. (“Endeavour” or the “Company”) (TSX: EDR, NYSE: EXK) announces today it has filed technical reports (the “Technical Reports”) prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects.
The Technical Reports are entitled “NI 43-101 Technical Report: Updated Mineral Resource and Reserve Estimates for the Guanaceví Project, Durango State, Mexico” (the “2022 Guanacevi Report”) with an effective date of November 5, 2022, and “NI 43-101 Technical Report: Updated Mineral Resource and Reserve Estimates for the Bolañitos Project, Guanajuato State, Mexico” (the “2022 Bolañitos Report”) with an effective date of November 9, 2022 and are co-authored by the Company and by Hard Rock Consulting, LLC (“Hard Rock”), a full-service geologic and mine engineering firm.
Below is a summary of material information from the 2022 Guanacevi Report
Mineral Resource Estimate:
Classification | Tonnes | Grade | Contained Metal | |||||
Mass (kt) | Silver (g/t) | Gold (g/t) | AgEq (g/t) | Silver (koz) | Gold (koz) | AgEq (koz) | ||
Measured | 138.8 | 569 | 1.4 | 670 | 2,538 | 6.1 | 2,992 | |
Indicated | 575.6 | 443 | 1.1 | 528 | 8,197 | 21.0 | 9,770 | |
Measured and Indicated | 714.4 | 467 | 1.2 | 556 | 10,735 | 27.0 | 12,762 | |
Inferred | 838.7 | 416 | 0.9 | 487 | 11,225 | 25.0 | 13,132 |
Notes:
Mineral Reserve Estimate:
Classification | Tonnes | Grade | Contained Metal | ||||
Mass (kt) | Silver (g/t) | Gold (g/t) | AgEq (g/t) | Silver (koz) | Gold (koz) | AgEq (koz) | |
Proven | 162.7 | 543 | 1.31 | 648 | 2,841 | 6.9 | 3,390 |
Probable | 1,096.7 | 466 | 1.11 | 555 | 16,445 | 39 | 19,579 |
Proven and Probable | 1,259.4 | 476 | 1.14 | 567 | 19,287 | 46.0 | 22,969 |
Notes:
Below is a summary of material information from the 2022 Bolañitos Report
Mineral Resource Estimate:
Classification | Tonnes | Grade | Contained Metal | |||||
Mass (kt) | Silver (g/t) | Gold (g/t) | AgEq (g/t) | Silver (koz) | Gold (koz) | AgEq (koz) | ||
Measured | 42.0 | 97 | 3.0 | 322 | 131 | 4.0 | 435 | |
Indicated | 411.5 | 111 | 2.3 | 279 | 1,470 | 30.0 | 3,697 | |
Measured and Indicated | 453.5 | 110 | 2.3 | 283 | 1,601 | 34.0 | 4,132 | |
Inferred | 1,656.6 | 141 | 2.5 | 331 | 7,494 | 132.2 | 17,608 |
Notes:
Mineral Reserve Estimate:
Classification | Tonnes | Grade | Contained Metal | ||||
Mass (kt) | Silver (g/t) | Gold (g/t) | AgEq (g/t) | Silver (koz) | Gold (koz) | AgEq (koz) | |
Proven | 158 | 57 | 2.63 | 266 | 290 | 13.4 | 1,357 |
Probable | 376 | 73 | 2.41 | 265 | 878 | 29.2 | 3,199 |
Proven + Probable | 534 | 101 | 2.8 | 326 | 1,168 | 42.6 | 4,556 |
Notes:
Reconciliation to Previously Disclosed Mineral Resource and Mineral Reserve Estimates
The following table compares the current mineral resource and mineral reserve estimates to those previously disclosed by the Company (see news release dated February 3, 2021). The changes in mineral resource and mineral reserve estimates resulted from a combination of depletion through mining and production, increases in gold price to $1735/oz (2022) from $1465/oz (2020) and silver price to $21.80/oz (2022) from $16.51/oz (2020) which affected cut-off grades, re-classification of vertical longitudinal projection Mineral Resources from Indicated and Inferred to Inferred only, and mineral resource and mineral reserve expansion through drilling and mine development.
Silver-Gold Proven and Probable Reserves | |||||||||||||||
| Tonnes (000s) | Ag (g/t) | Au (g/t) | Ag Eq (g/t) | Ag (koz) | Au (koz) | Ag Eq (koz) | ||||||||
Proven | |||||||||||||||
Guanaceví (Dec 2020) | 141 | 319 | 0.82 | 385 | 1,445 | 3.7 | 1,742 | ||||||||
Guanaceví (May 2022) | 163 | 543 | 1.31 | 648 | 2,841 | 6.9 | 3,390 | ||||||||
Difference (%) | 16% | 70% | 60% | 68% | 97% | 86% | 95% | ||||||||
Bolañitos (Dec 2020) | 76 | 34 | 2.62 | 243 | 83 | 6.4 | 596 | ||||||||
Bolañitos (May 2022) | 158 | 57 | 2.63 | 266 | 290 | 13.4 | 1,357 | ||||||||
Difference (%) | 107% | 68% | 1% | 9% | 249% | 109% | 128% | ||||||||
Probable | |||||||||||||||
Guanaceví (Dec 2020) | 948 | 346 | 0.95 | 422 | 10,554 | 28.8 | 12,859 | ||||||||
Guanaceví (May 2022) | 1,097 | 466 | 1.11 | 555 | 16,445 | 39.0 | 19,579 | ||||||||
Difference (%) | 16% | 35% | 17% | 32% | 56% | 35% | 52% | ||||||||
Bolañitos (Dec 2020) | 237 | 53 | 2.51 | 254 | 405 | 19.1 | 1,930 | ||||||||
Bolañitos (May 2022) | 376 | 73 | 2.41 | 265 | 878 | 29.2 | 3,199 | ||||||||
Difference (%) | 59% | 37% | -4% | 4% | 117% | 53% | 66% | ||||||||
Silver-Gold Measured and Indicated Resources | |||||||||||||||
| Tonnes (000s) | Ag (g/t) | Au (g/t) | Ag Eq (g/t) | Ag (koz) | Au (koz) | Ag Eq (koz) | ||||||||
Measured | |||||||||||||||
Guanaceví (Dec 2020) | 95 | 405 | 0.88 | 475 | 1,240 | 2.7 | 1,456 | ||||||||
Guanaceví (May 2022) | 139 | 569 | 1 | 670 | 2,538 | 6 | 2,992 | ||||||||
Difference (%) | 46% | 41% | 59% | 41% | 105% | 127% | 106% | ||||||||
Bolañitos (Dec 2020) | 35 | 76 | 2.37 | 265 | 85 | 2.6 | 296 | ||||||||
Bolañitos (May 2022) | 42 | 97 | 3 | 322 | 131 | 4 | 435 | ||||||||
Difference (%) | 21% | 28% | 27% | 21% | 55% | 51% | 47% | ||||||||
Indicated | |||||||||||||||
Guanaceví (Dec 2020) | 566 | 363 | 0.82 | 428 | 6,603 | 14.9 | 7,797 | ||||||||
Guanaceví (May 2022) | 576 | 443 | 1 | 528 | 8,197 | 21 | 9,770 | ||||||||
Difference (%) | 2% | 22% | 34% | 23% | 24% | 41% | 25% | ||||||||
Bolañitos (Dec 2020) | 193 | 105 | 2.67 | 319 | 654 | 16.5 | 1,976 | ||||||||
Bolañitos (May 2022) | 412 | 111 | 2 | 279 | 1,470 | 30 | 3,697 | ||||||||
Difference (%) | 113% | 5% | -14% | -12% | 125% | 82% | 87% | ||||||||
Silver-Gold Inferred Resources | |||||||||||||||
Tonnes (000s) | Ag (g/t) | Au (g/t) | Ag Eq (g/t) | Ag (koz) | Au (koz) | Ag Eq (koz) | |||||||||
Inferred | |||||||||||||||
Guanaceví (Dec 2020) | 866 | 495 | 1.18 | 589 | 13,765 | 32.7 | 16,384 | ||||||||
Guanaceví (May 2022) | 839 | 416 | 1 | 487 | 11,225 | 25 | 13,132 | ||||||||
Difference (%) | -3% | -16% | -23% | -17% | -18% | -24% | -20% | ||||||||
Bolañitos (Dec 2020) | 311 | 80 | 2.82 | 305 | 798 | 28.2 | 3,054 | ||||||||
Bolañitos (May 2022) | 1,657 | 141 | 3 | 331 | 7,494 | 132 | 17,608 | ||||||||
Difference (%) | 433% | 77% | -11% | 8% | 839% | 369% | 477% |
National Instrument 43-101 Disclosure
The 2022 Guanacevi Report and the 2022 Bolañitos Report were co-authored by Dale Mah, P.Geo., Vice President, Corporate Development of Endeavour, Don Gray, SME-RM, Chief Operations Officer of Endeavour and Richard A. Schwering, SME-RM of Hard Rock Consulting LLC. Mr. Schwering is independent of Endeavour. These authors are Qualified Persons as defined by NI 43-101 and are responsible for all sections of the Technical Reports. These Qualified Persons have prepared the scientific and technical information in the Guanacevi and Bolañitos reports and have reviewed and approved the technical information contained in this news release.
The Technical Reports are available for download under the Company's profile on SEDAR at www.sedar.com and on the Company's website at www.edrsilver.com, and will be filed on EDGAR as soon as practicable at www.sec.gov. There are no differences in the Technical Reports from the information disclosed in this News Release.
About Endeavour Silver
Endeavour is a mid-tier precious metals mining company that operates two high-grade, underground silver-gold mines in Mexico. Endeavour is currently advancing the Terronera mine project towards a development decision, pending financing and final permits and exploring its portfolio of exploration and development projects in Mexico, Chile and the United States to facilitate its goal to become a premier senior silver producer. The Company’s philosophy of corporate social integrity creates value for all stakeholders.
SOURCE Endeavour Silver Corp.
Contact Information
Galina Meleger, Vice President of Investor Relations
Tel: (604) 685-9775
Email: gmeleger@edrsilver.com
Website: www.edrsilver.com
Follow Endeavour Silver on Facebook, Twitter, Instagram and LinkedIn
Cautionary Note Regarding Forward-Looking Statements
This news release contains “forward-looking statements” within the meaning of the United States private securities litigation reform act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. Such forward-looking statements and information herein include but are not limited to estimates of mineral resources and mineral reserves contained in the Technical Reports, statements regarding Endeavour’s anticipated performance in 2022 and the timing and results of various operations and activities. The Company does not intend to and does not assume any obligation to update such forward-looking statements or information, other than as required by applicable law.
Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, production levels, performance or achievements of Endeavour and its operations to be materially different from those expressed or implied by such statements. Such factors include but are not limited to the ultimate impact of the COVID 19 pandemic on operations and results, changes in production and costs guidance, national and local governments, legislation, taxation, controls, regulations and political or economic developments in Canada and Mexico; financial risks due to precious metals prices, operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of mineral exploration, development and mining; the speculative nature of mineral exploration and development, risks in obtaining necessary licenses and permits, and challenges to the Company’s title to properties; as well as those factors described in the section “risk factors” contained in the Company’s most recent form 40F/Annual Information Form filed with the S.E.C. and Canadian securities regulatory authorities available at www.sedar.com.
Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to: the continued operation of the Company’s mining operations, no material adverse change in the market price of commodities, mining operations will operate and the mining products will be completed in accordance with management’s expectations and achieve their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or information, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.