Endeavour Silver Reports High Grade Silver-Gold Intersections in Multiple Veins From 2018 Drill Program at the Bolanitos Mine, Guanajuato, Mexico

2018-11-28 / @nasdaq

 

VANCOUVER, B.C., Nov. 28, 2018 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. (NYSE: EXK; TSX: EDR) reports high grade silver-gold intersections in multiple veins from the 2018 drill program at the Bolanitos mine in Guanajuato, Mexico.  A total of 55 drill holes from surface and 11,000 metres were completed by the end of October on seven different vein targets, all of which are located within four kilometres of the Bolanitos plant (view longitudinal sections for Herradura, Plateros and San Miguel).

Drilling highlights include high silver-gold grades in two parallel veins at the San Miguel target just north of the plant, such as 1,415 grams per tonne (gpt) silver and 2.25 gpt gold over a 1.1 m true width (46.2 oz per short ton (opT) silver equivalent (AgEq) over 3.6 feet (ft) in hole MG-06.  Another highlight comes from the Arcangel vein, part of the La Luz vein system, and includes 138 gpt silver and 13.2 gpt gold over a true width of 1.2 m (32.8 opT silver equivalent over 3.9 ft) in hole LZU-17.

Luis Castro, Vice President, Exploration for Endeavour Silver, commented, “These step-out drill results have outlined several new mineralized areas and provided extensions to known areas, with potential for new resources to extend the mine life at Bolanitos. Specifically, San Miguel is a newly discovered vein to the North East, that is more extensive than previously recognized. Drilling has now wrapped up at Bolanitos for the year and a new resource estimate is expected in January.”

Drilling highlights are summarized in the following table of drill results.

HoleStructureFromTrue widthAuAgAgEq
(m)(m)(gpt)(gpt)(gpt)
LZU-16Arcangel94.108.02.686207
Including101.050.56.9310530
LZU-17Arcangel91.701.213.171381,126
Including93.100.342.604503,645
BL1.5S-3HW Belen84.702.22.1953217
Including84.701.13.3174322
FWBLV1126.202.22.05121274
Including127.000.33.24154397
BSV-09Herradura163.151.53.7449330
Including164.700.35.6991518
BSV-10Herradura222.251.11.7090218
Including222.550.42.87134349
BSV-11Herradura234.301.21.73330460
Including234.300.31.591,1251,244
BSV-15Herradura194.301.32.9251270
Including195.300.44.1255364
PLU-01La Luz112.001.92.6218214
Including114.050.17.5455620
Plateros251.901.92.4890276
Including252.450.34.27272592
PLU-03Plateros162.501.41.01155231
Including163.200.21.40284389
PLU-04Plateros183.151.58.6689738
Including184.700.313.301611,159
PLU-06Plateros154.202.01.93109253
Including157.000.36.88274790
PLU-07Plateros240.451.11.32260359
Including240.450.42.67523723
PLU-11Plateros141.551.84.2191407
Including144.450.214.553191,410
PLU-13Plateros186.602.41.22107198
Including191.900.20.89598665
MG-06HW San Miguel39.901.12.251,4151,584
Including40.550.35.083,7104,091
San Miguel122.651.72.923222
Including123.650.94.124313
MG-07HW San Miguel62.101.12.1825189
Including63.100.34.9455426
San Miguel133.701.66.79420929
Including135.600.248.703,5407,193
MG-08San Ignacio22.501.30.27148168
Including22.500.50.42208239
HW San Miguel104.601.02.029160
Including105.600.33.0510239
MG-09San Ignacio26.501.91.82162298
Including27.600.22.22352519
San Miguel100.251.93.42102358
Including102.000.35.42194601
BUV-21Santa Maria77.201.42.38635813
Including77.600.22.302,7312,903
BUV-24Bolañitos188.101.10.28218239
Including189.100.21.171,0211,109

Silver equivalents are calculated at a ratio of 75:1 silver: gold.  All widths are estimated true widths.

About Endeavour Silver – Endeavour Silver Corp. is a mid-tier precious metals mining company that owns three high-grade, underground, silver-gold mines in Mexico. Endeavour is currently commissioning its fourth mine at El Compas, advancing a possible fifth mine at the Terronera mine project and exploring its portfolio of exploration and development projects in Mexico and Chile to facilitate its goal to become a premier senior silver producer.  Our philosophy of corporate social integrity creates value for all stakeholders.

SOURCE Endeavour Silver Corp. 

Contact Information - For more information, please contact:
Galina Meleger, Director Investor Relations
Toll free: (877) 685-9775
Tel: (604) 640-4804
Fax: (604) 685-9744
Email:  gmeleger@edrsilver.com 
Website: www.edrsilver.com

Follow Endeavour Silver on Facebook, Twitter, Instagram and LinkedIn

Cautionary Note Regarding Forward-Looking Statements

This news release contains “forward-looking statements” within the meaning of the United States private securities litigation reform act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. Such forward‑looking statements and information herein include but are not limited to statements regarding Endeavour’s anticipated performance in 2018 including changes in mining and operations and the timing and results of various activities. The Company does not intend to, and does not assume any obligation to, update such forward-looking statements or information, other than as required by applicable law.

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Endeavour and its operations to be materially different from those expressed or implied by such statements. Such factors include, among others, changes in national and local governments, legislation, taxation, controls, regulations and political or economic developments in Canada and Mexico; financial risks due to precious metals prices, operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of mineral exploration, development and mining; the speculative nature of mineral exploration and development, risks in obtaining necessary licenses and permits, and challenges to the Company’s title to properties; as well as those factors described in the section “risk factors” contained in the Company’s most recent form 40F/Annual Information Form filed with the S.E.C. and Canadian securities regulatory authorities.

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to: the continued operation of the Company’s mining operations, no material adverse change in the market price of commodities, mining operations will operate and the mining products will be completed in accordance with management’s expectations and achieve their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or information, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

 

EndeavourSilver.jpg

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok