VANCOUVER, British Columbia, Oct. 31, 2018 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. (NYSE: EXK; TSX: EDR) released today its financial results for the Third Quarter ended September 30, 2018. The Company operates three silver-gold mines in Mexico, the Guanaceví mine in Durango state, and the Bolañitos and El Cubo mines in Guanajuato state. Endeavour is currently commissioning its fourth mine, El Compas, in Zacatecas state and advancing the Terronera mine project in Jalisco state to a development decision.
The Company reports a net loss of $5.5 million in the Third Quarter, 2018 compared to $1.0 million earnings in the Third Quarter, 2017, primarily due to higher depreciation and depletion charges. Revenue decreased 6% to $37.6 million and mine operating cash flow before taxes(1) decreased 20% to $9.6 million due to lower realized metal prices and higher costs, offset by higher silver production.
Cash flow from operations before working capital changes increased 21% to $6.9 million and EBITDA fell 8% to $5.6 million compared to the same period last year. Cash costs rose 9% to $8.86 per oz silver payable (net of gold credits) and all-in sustaining costs fell 8% to $16.14 per oz silver payable (net of gold credits) as capital expenditures fell compared to Third Quarter, 2017. For the nine months ended September 30, 2018, cash costs and all-in sustaining costs decreased 5% and 15% respectively to $7.68 and $15.87 per oz silver payable (net of gold credits) compared to the nine months ended September 30, 2017.
Highlights of Third Quarter 2018 (Compared to Third Quarter 2017)
Financial
Operations
(1) EBITDA, mine operating cash flow, cash costs and all-in sustaining costs are non-IFRS measures. Please refer to the definitions in the Company’s Management Discussion & Analysis.
Bradford Cooke, Endeavour CEO, commented, “Our financial performance in Q3, 2018 was impacted by lower metal prices and higher depreciation and depletion charges, primarily at Guanacevi where production lagged behind plan. However, El Cubo production continued its strong performance during the quarter and Bolanitos gold grades are now improving after a slight drop in Q3, 2018.
“We completed a large part of our 2018 exploration and development spending during the third quarter and in late August launched a company-wide initiative to reduce exploration, capital, operating and G&A costs. Looking ahead to Q4, 2018, management anticipates improved operating and financial performance due to higher throughput and grades at Guanaceví, stronger gold grades at Bolanitos and initial commercial production from El Compas. We should also begin to realize the full benefit of the short-term cost reduction program in Q4, 2018.”
Financial Results
Revenue in the Third Quarter, 2018 totaled $37.6 million (2017 - $39.8 million) on sales of 1,532,097 silver ounces and 13,025 gold ounces at realized prices of $14.42 and $1,189 per ounce respectively, compared to sales of 1,275,922 silver ounces and 13,759 gold ounces at realized prices of $17.20 and $1,299 per ounce respectively in Q3, 2017.
After cost of sales of $42.4 million (2017 - $32.5 million), mine operating earnings amounted to a loss of $4.8 million (2017 – earnings of $7.3 million) from mining and milling operations in Mexico. The 30% increase in cost of sales was primarily due to increased depreciation and depletion. Excluding depreciation and depletion of $13.1 million (2017 - $4.4 million), and an inventory write down of $1.3 million (2017 - $0.2 million), mine operating cash flow before taxes was $9.6 million (2017 – $11.9 million) in Q3, 2018.
Net loss amounts to $5.5 million (2017 – earnings of $1.0 million) after exploration, general and administrative expenses, foreign exchange and tax recovery.
Direct production costs per tonne in Q3, 2018 increased 2% compared with 2017. The higher production costs per tonne were driven mainly by lower Guanaceví mine output due to mine development falling behind schedule in 2017, the costs related to implement a productivity optimization program and higher labour and contractor costs.
Higher direct costs at Guanaceví and lower gold grades processed at Bolanitos resulted in higher consolidated cash costs, net of gold by-product credits (a non-IFRS measure), rising to $8.86 per ounce. Lower costs per ounce at El Cubo due to higher grades partially offset the higher cost per ounce at Guanacevi and Bolanitos. All-in sustaining costs (also a non-IFRS measure) compared to 2017 decreased to $16.14 per oz in Q3, 2018. This decrease in all‑in sustaining costs is attributable to the lower operating costs and the lower capital expenditures in 2018 compared to 2017, partially offset by higher general and administration charges at the corporate level.
For the nine months ended September 30, 2018, direct production costs were $84.00 per tonne compared to the guided range of $80-$85 per tonne. The lower than planned throughput at Guanacevi was partially offset by the cost performance of the El Cubo operation.
Consolidated cash costs, net of gold by-product credits, were guided to be $6.00-$7.00 per oz of silver in 2018 and consolidated cash costs expressed on a co-product basis were guided to be $10.00-$11.00 per oz silver and $750-$800 per oz gold. For the nine months ended September 30, 2018, cash costs, net of gold by-product credits, were $7.68 per oz and cash costs expressed on a co-product basis were $11.00 per oz silver and $877 per gold oz. The lower than planned production resulted in higher than guided costs per ounce. In Q4, 2018, cash costs are expected to be lower than the cash costs for the nine months ended September 30, 2018.
All-in sustaining costs (AISC), net of gold by-product credits, in accordance with the World Gold Council standard, were guided to be $15.00-$16.00 per oz of silver produced in 2018 reflecting new investments in sustaining exploration and development programs. For the nine months ended September 30, 2018 AISC, net of gold by-product credits, is $15.87 as the Company spent less on sustaining capital expenditures than guided. The lower capital expenditures were offset by higher operating costs on a per ounce basis. In Q4, 2018, AISC are expected to be lower than the AISC for the nine months ended September 30, 2018.
Management assumed a $17 per oz silver price, $1,275 per oz gold price, and 19:1 Mexican peso per US dollar exchange rate for its 2018 cost guidance.
For the nine months ended September 30, 2018, silver production totalled 4,135,563 oz and gold production totalled 39,850 oz, resulting in silver equivalent production of 7.1 million oz. Based on the Company’s performance, year to date, management estimates a 5% shortfall to the 2018 consolidated production guidance, due to the delayed commercial production at El Compas, lower gold grades at Bolañitos and lower mine output at Guanaceví. This anticipated production shortfall and lower gold credit will likely also impact the Company’s ability to meet its 2018 cost guidance.
The Condensed Consolidated Interim Financial Statements and Management’s Discussion & Analysis can be viewed on the Company’s website at www.edrsilver.com, on SEDAR at www.sedar.com and EDGAR at www.sec.gov. All amounts are reported in US$.
Conference Call
A conference call to discuss the results will be held today, Wednesday, October 31, 2018 at 10:00am PT (1:00pm ET). To participate in the conference call, please dial the numbers below. No pass-code is necessary.
Toll-free in Canada and the US: 1-800-319-4610
Local Vancouver: 604-638-5340
Outside of Canada and the US: + 604-638-5340
A replay of the conference call will be available by dialing 1-800-319-6413 in Canada and the US (toll-free) or +604-638-9010 outside of Canada and the US. The required pass-code is 2625#. The audio replay and a written transcript will be available on the Company's website at www.edrsilver.com under the Investor Relations, Events section.
About Endeavour Silver – Endeavour Silver Corp. is a mid-tier precious metals mining company that owns three high-grade, underground, silver-gold mines in Mexico. Endeavour is currently commissioning its fourth mine at El Compas, advancing a possible fifth mine at the Terronera mine project and exploring its portfolio of exploration and development projects in Mexico and Chile to facilitate its goal to become a premier senior silver producer. Our philosophy of corporate social integrity creates value for all stakeholders.
SOURCE Endeavour Silver Corp.
Contact Information - For more information, please contact:
Galina Meleger, Director Investor Relations
Toll free: (877) 685-9775
Tel: (604) 640-4804
Fax: (604) 685-9744
Email: gmeleger@edrsilver.com
Website: www.edrsilver.com
Follow Endeavour Silver on Facebook, Twitter, Instagram and LinkedIn
Cautionary Note Regarding Forward-Looking Statements
This news release contains “forward-looking statements” within the meaning of the United States private securities litigation reform act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. Such forward‑looking statements and information herein include but are not limited to statements regarding Endeavour’s anticipated performance in 2018 including changes in mining and operations and the timing and results of various activities. The Company does not intend to, and does not assume any obligation to, update such forward-looking statements or information, other than as required by applicable law.
Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Endeavour and its operations to be materially different from those expressed or implied by such statements. Such factors include, among others, changes in national and local governments, legislation, taxation, controls, regulations and political or economic developments in Canada and Mexico; financial risks due to precious metals prices, operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of mineral exploration, development and mining; the speculative nature of mineral exploration and development, risks in obtaining necessary licenses and permits, and challenges to the Company’s title to properties; as well as those factors described in the section “risk factors” contained in the Company’s most recent form 40F/Annual Information Form filed with the S.E.C. and Canadian securities regulatory authorities.
Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to: the continued operation of the Company’s mining operations, no material adverse change in the market price of commodities, mining operations will operate and the mining products will be completed in accordance with management’s expectations and achieve their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or information, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.
ENDEAVOUR SILVER CORP.
COMPARATIVE HIGHLIGHTS
Three Months Ended September 30 | Nine Months Ended September 30 | |||||||||
2018 | 2017 | % Change | 2018 | 2017 | % Change | |||||
Production | ||||||||||
1,428,828 | 1,262,064 | 13% | Silver ounces produced | 4,135,563 | 3,482,826 | 19% | ||||
12,968 | 13,648 | (5%) | Gold ounces produced | 39,850 | 38,430 | 4% | ||||
1,404,677 | 1,231,975 | 14% | Payable silver ounces produced | 4,058,377 | 3,402,884 | 19% | ||||
12,665 | 13,337 | (5%) | Payable gold ounces produced | 39,005 | 37,552 | 4% | ||||
2,401,428 | 2,285,664 | 5% | Silver equivalent ounces produced(1) | 7,124,313 | 6,365,076 | 12% | ||||
8.86 | 8.11 | 9% | Cash costs per silver ounce(2)(3) | 7.68 | 8.10 | (5%) | ||||
18.16 | 11.74 | 55% | Total production costs per ounce(2)(4) | 15.52 | 11.80 | 32% | ||||
16.14 | 17.53 | (8%) | All-in sustaining costs per ounce(2)(5) | 15.87 | 18.71 | (15%) | ||||
317,821 | 322,784 | (2%) | Processed tonnes | 957,795 | 929,949 | 3% | ||||
86.33 | 84.81 | 2% | Direct production costs per tonne(2)(6) | 84.00 | 81.60 | 3% | ||||
10.98 | 11.94 | (8%) | Silver co-product cash costs(7) | 11.00 | 12.01 | (8%) | ||||
906 | 902 | 0% | Gold co-product cash costs(7) | 877 | 886 | (1%) | ||||
Financial | ||||||||||
37.6 | 39.8 | (6%) | Revenue ($ millions) | 116.7 | 108.9 | 7% | ||||
1,532,097 | 1,275,922 | 20% | Silver ounces sold | 4,196,857 | 3,500,337 | 20% | ||||
13,025 | 13,759 | (5%) | Gold ounces sold | 39,499 | 37,343 | 6% | ||||
14.42 | 17.20 | (16%) | Realized silver price per ounce | 15.88 | 17.40 | (9%) | ||||
1,189 | 1,299 | (8%) | Realized gold price per ounce | 1,266 | 1,284 | (1%) | ||||
(5.5) | 1.0 | (647%) | Net earnings (loss) ($ millions) | (8.8) | 7.0 | (225%) | ||||
(4.8) | 7.3 | (165%) | Mine operating earnings ($ millions) | 3.1 | 20.6 | (85%) | ||||
9.6 | 11.9 | (20%) | Mine operating cash flow(8) ($ millions) | 38.3 | 32.7 | 17% | ||||
6.9 | 5.7 | 21% | Operating cash flow before working capital changes (9) | 22.1 | 18.9 | 17% | ||||
5.6 | 6.1 | (8%) | Earnings before ITDA (10)($ millions) | 19.7 | 18.7 | 6% | ||||
57.4 | 70.3 | (18%) | Working capital ($ millions) | 57.4 | 70.3 | (18%) | ||||
Shareholders | ||||||||||
(0.04) | 0.01 | (500%) | Earnings (loss) per share – basic | (0.07) | 0.06 | (217%) | ||||
0.05 | 0.04 | 20% | Operating cash flow before working capital changes per share (9) | 0.17 | 0.15 | 16% | ||||
128,805,441 | 127,456,410 | 1% | Weighted average shares outstanding | 127,959,526 | 127,291,688 | 1% | ||||
1) Silver equivalents are calculated using a 75:1 ratio. | ||||||||||
2) Cost metrics, EBITDA, mine operating cash flow, operating cash flow before working capital changes are non-IFRS measures. Please refer to the definitions in the Company’s Management Discussion & Analysis. | ||||||||||
ENDEAVOUR SILVER CORP.
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF CASH FLOWS
(unaudited – prepared by management)
(expressed in thousands of U.S. dollars)
Three months ended | Nine months ended | |||||||||||||
September 30, | September 30, | September 30, | September 30, | |||||||||||
2018 | 2017 | 2018 | 2017 | |||||||||||
Operating activities | ||||||||||||||
Net earnings (loss) for the year | $ | (5,452 | ) | $ | 996 | $ | (8,778 | ) | $ | 7,015 | ||||
Items not affecting cash: | ||||||||||||||
Share-based compensation | 701 | 673 | 1,894 | 2,241 | ||||||||||
Depreciation and depletion | 13,200 | 4,540 | 30,976 | 12,055 | ||||||||||
Deferred income tax expense (recovery) | (2,941 | ) | (535 | ) | (7,142 | ) | (2,554 | ) | ||||||
Unrealized foreign exchange loss (gain) | 84 | (150 | ) | 432 | (582 | ) | ||||||||
Finance costs | 38 | 166 | 113 | 610 | ||||||||||
Write off of mineral properties | - | - | - | 233 | ||||||||||
Write down of inventory to net realizable value | 1,262 | - | 4,544 | - | ||||||||||
Unrealized loss (gain) on other investments | 14 | - | 60 | (72 | ) | |||||||||
Net changes in non-cash working capital | (2,540 | ) | (1,092 | ) | (5,415 | ) | (8,957 | ) | ||||||
Cash from operating activities | 4,366 | 4,598 | 16,684 | 9,989 | ||||||||||
Investing activities | ||||||||||||||
Property, plant and equipment expenditures | (10,020 | ) | (10,836 | ) | (32,757 | ) | (31,575 | ) | ||||||
Proceeds from disposition of other investments | - | - | - | 72 | ||||||||||
Redemption of (investment in) non-current deposits | - | - | 1 | (6 | ) | |||||||||
Cash used in investing activities | (10,020 | ) | (10,836 | ) | (32,756 | ) | (31,509 | ) | ||||||
Financing activities | ||||||||||||||
Repayment of credit facility | - | (2,500 | ) | - | (7,500 | ) | ||||||||
Restricted cash | - | - | 1,000 | - | ||||||||||
Interest paid | - | (101 | ) | - | (405 | ) | ||||||||
Public equity offerings | 3,529 | - | 5,600 | - | ||||||||||
Exercise of options | - | - | 256 | 74 | ||||||||||
Share issuance costs | (507 | ) | - | (591 | ) | - | ||||||||
Cash from (used in) financing activities | 3,022 | (2,601 | ) | 6,265 | (7,831 | ) | ||||||||
Effect of exchange rate change on cash and cash equivalents | 179 | 150 | 134 | 582 | ||||||||||
Increase (decrease) in cash and cash equivalents | (2,632 | ) | (8,839 | ) | (9,807 | ) | (29,351 | ) | ||||||
Cash and cash equivalents, beginning of the period | 31,057 | 52,237 | 38,277 | 72,317 | ||||||||||
Cash and cash equivalents, end of the period | $ | 28,604 | $ | 43,548 | $ | 28,604 | $ | 43,548 | ||||||
This statement should be read in conjunction with the condensed consolidated interim financial statements for the period ended September 30, 2018 and the related notes contained therein. | ||||||||||||||
ENDEAVOUR SILVER CORP.
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF COMPREHENSIVE INCOME
(unaudited – prepared by management)
(expressed in thousands of US dollars, except for shares and per share amounts)
Three months ended | Nine months ended | |||||||||||||||
September 30, | September 30, | September 30, | September 30, | |||||||||||||
2018 | 2017 | 2018 | 2017 | |||||||||||||
Revenue | $ | 37,581 | $ | 39,782 | $ | 116,676 | $ | 108,859 | ||||||||
Cost of sales: | ||||||||||||||||
Direct production costs | 27,574 | 27,400 | 77,100 | 74,931 | ||||||||||||
Royalties | 421 | 457 | 1,296 | 1,237 | ||||||||||||
Share-based payments | - | 63 | (93 | ) | 155 | |||||||||||
Depreciation and depletion | 13,104 | 4,394 | 30,718 | 11,778 | ||||||||||||
Write down of inventory to net realizable value | 1,262 | 166 | 4,544 | 166 | ||||||||||||
42,361 | 32,480 | 113,565 | 88,267 | |||||||||||||
Mine operating earnings | (4,780 | ) | 7,302 | 3,111 | 20,592 | |||||||||||
Expenses: | ||||||||||||||||
Exploration | 3,965 | 3,432 | 10,418 | 10,533 | ||||||||||||
General and administrative | 1,316 | 1,605 | 6,845 | 5,991 | ||||||||||||
5,281 | 5,037 | 17,263 | 16,524 | |||||||||||||
Operating earnings (loss) | (10,061 | ) | 2,265 | (14,152 | ) | 4,068 | ||||||||||
Finance costs | 62 | 166 | 160 | 610 | ||||||||||||
Other income (expense): | ||||||||||||||||
Foreign exchange | 1,906 | (561 | ) | 1,009 | 2,454 | |||||||||||
Investment and other | 99 | (170 | ) | 311 | 119 | |||||||||||
2,005 | (731 | ) | 1,320 | 2,573 | ||||||||||||
Earnings (loss) before income taxes | (8,118 | ) | 1,368 | (12,992 | ) | 6,031 | ||||||||||
Income tax expense (recovery): | ||||||||||||||||
Current income tax expense | 291 | 882 | 2,944 | 1,726 | ||||||||||||
Deferred income tax expense (recovery) | (2,957 | ) | (510 | ) | (7,158 | ) | (2,710 | ) | ||||||||
(2,666 | ) | 372 | (4,214 | ) | (984 | ) | ||||||||||
Net earnings (loss) for the period | (5,452 | ) | 996 | (8,778 | ) | 7,015 | ||||||||||
Other comprehensive income (loss), net of tax | ||||||||||||||||
Realized (gain) loss on other investments | - | - | - | (72 | ) | |||||||||||
Unrealized gain (loss) on other investments | - | (35 | ) | - | 145 | |||||||||||
Total other comprehensive income (loss) for the period | - | (35 | ) | - | 73 | |||||||||||
Comprehensive income (loss) for the period | $ | (5,452 | ) | $ | 961 | $ | (8,778 | ) | $ | 7,088 | ||||||
Basic earnings (loss) per share based on net earnings | $ | (0.04 | ) | $ | 0.01 | $ | (0.07 | ) | $ | 0.06 | ||||||
Diluted earnings (loss) per share based on net earnings | $ | (0.04 | ) | $ | 0.01 | $ | (0.07 | ) | $ | 0.05 | ||||||
Basic weighted average number of shares outstanding | 128,805,441 | 127,456,410 | 127,959,526 | 127,291,688 | ||||||||||||
Diluted weighted average number of shares outstanding | 128,805,441 | 127,851,198 | 127,959,526 | 127,823,260 | ||||||||||||
This statement should be read in conjunction with the condensed consolidated interim financial statements for the period ended September 30, 2018 and the related notes contained therein. | ||||||||||||||||
ENDEAVOUR SILVER CORP.
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF FINANCIAL POSITION
(unaudited – prepared by management)
(expressed in thousands of US dollars)
September 30, | December 31, | |||||||
2018 | 2017 | |||||||
ASSETS | ||||||||
Current assets | ||||||||
Cash and cash equivalents | $ | 28,604 | $ | 38,277 | ||||
Restricted cash | - | 1,000 | ||||||
Other investments | 108 | 168 | ||||||
Accounts receivable | 36,174 | 34,012 | ||||||
Inventories | 12,230 | 13,131 | ||||||
Prepaid expenses | 1,870 | 1,911 | ||||||
Total current assets | 78,986 | 88,499 | ||||||
Non-current deposits | 609 | 610 | ||||||
Deferred income tax asset | 7,269 | 655 | ||||||
Mineral properties, plant and equipment | 89,505 | 88,816 | ||||||
Total assets | $ | 176,369 | $ | 178,580 | ||||
LIABILITIES AND SHAREHOLDERS' EQUITY | ||||||||
Current liabilities | ||||||||
Accounts payable and accrued liabilities | $ | 18,927 | $ | 19,068 | ||||
Income taxes payable | 2,639 | 3,185 | ||||||
Total current liabilities | 21,566 | 22,253 | ||||||
Deferred lease inducement | 224 | 236 | ||||||
Provision for reclamation and rehabilitation | 8,095 | 7,982 | ||||||
Deferred income tax liability | 1,156 | 1,592 | ||||||
Total liabilities | 31,041 | 32,063 | ||||||
Shareholders' equity | ||||||||
Common shares, unlimited shares authorized, no par value, issued | ||||||||
and outstanding 129,640,409 shares (Dec 31, 2017 - 127,488,410 shares) | 456,528 | 450,740 | ||||||
Contributed surplus | 9,144 | 8,747 | ||||||
Accumulated comprehensive income (loss) | - | 127 | ||||||
Retained earnings (deficit) | (320,344 | ) | (313,097 | ) | ||||
Total shareholders' equity | 145,328 | 146,517 | ||||||
Total liabilities and shareholders' equity | $ | 176,369 | $ | 178,580 | ||||
This statement should be read in conjunction with the condensed consolidated interim financial statements for the period ended September 30, 2018 and the related notes contained therein. |