FEASIBILITY STUDY UPDATE: Geotechnical analysis and mine planning work advances

2021-10-12 / @nasdaq

 

VANCOUVER, British Columbia, Oct. 12, 2021 (GLOBE NEWSWIRE) -- Macarthur Minerals Limited (ASX: MIO) (TSX-V: MMS) (OTCQB: MMSDF) (the Company or Macarthur) is pleased to provide an update on the steady progress being made on the Feasibility Study for its high-grade magnetite Lake Giles Iron Project. The mine planning work for the Feasibility Study is advancing, with the geotechnical drill programme of work almost complete. The drill core from the programme is required to determine the basis for mine pit slopes and finalisation of mine planning work.

The Company recently provided updates to the market regarding the progress of the Feasibility Study on 1 October 2021 (see announcement regarding the progress of metallurgical and non-process infrastructure design here) and 7 October 2021 (see announcement regarding the progress of development of the rail and port concept plan of operations here). The following summary sets out details of current progress on mine planning work as the Feasibility Study advances closer to completion.

Mine planning update
 
  • Geotechnical slope design: Geotechnical drill core is expected to be delivered to Bureau Veritas for completion of lab analysis by late October.  Lab analysis of this core will clear the way for completion of the necessary rock mass and structural model work by PSM Consult Pty Ltd to provide the basis for the mine pit slope parameters which will, in turn, facilitate the completion of the important mine planning work which is being undertaken by Orelogy Consulting Pty Ltd. 
  • Mine planning: The geotechnical analysis will be finalised after completion of the drill programme and facilitate the completion of detailed mine planning work by Orelogy, including pit optimisation, mine design and life of mine (LOM) mine scheduling.  This study component includes:
 
  • Development of preferred equipment selection in conjunction with mining contractors;
  • Completion of a blasting study defined by the geotechnical rock parameters;
  • Optimisation of pit shells using updated parameters (mining costs, geotechnical slope design, process and non-process operating costs);
  • Reviewing the staging sequence and developing detailed designs for final and interim pit stages;
  • Developing a LOM schedule based on a total material movement basis;
  • Developing designs for all mining related infrastructure (i.e., ROM pad, waste dumps, roads, stockpiles etc);
  • Evaluating submissions from mining and haulage contractors;
  • Completing development of a detailed cost model that will feed into the detailed financial model being developed by Macarthur for the whole Lake Giles Iron Project;
  • Developing a grade control philosophy and associated cost estimate;
  • Financial outputs: FTI Consulting Pty Ltd is aggregating data from the study outputs to progress the completion of the detailed economic model that will accompany the delivery of the final study reports.
  • Qualified Person Site Visit: The final Feasibility Study for the Lake Giles Iron Project will require sign-off by Qualified Persons for the purposes of compliance with National Instrument 43-101 (which governs standards of disclosure for mineral projects).  A Qualified Person site visit is expected to be conducted at Lake Giles during early November.

 

The current geotechnical drilling programme of works is nearing completion with a target end date of 22 October 2021. The drill programme has exceeded the original target end date of the end of September with the contributing factors including wet weather, challenging ground conditions, and the addition of a further drill hole which has been requested by consultants outside of the original test work plan. Following completion of drilling, core samples will be submitted to the lab for assessment prior to the data being used to finalise the mine planning work being undertaken by Orelogy.   Although the extended drilling period may moderately affect the timeline for mine planning in the study schedule, the overall resultant impact is not currently anticipated to be material, and the additional drilling work that has been requested is anticipated to enhance the quality of the Study outputs.

Andrew Bruton, CEO of Macarthur Minerals commented:

“The mine planning component of the Feasibility Study is very important to determining accurate operating cost estimates for the high-grade magnetite mine that Macarthur intends to develop at Lake Giles. It is one of the most fundamental bodies of work that is required to complete the final Feasibility Study and the detailed economic model for the project so that the key financial outputs can be presented to the market and potential funders.  

Macarthur looks forward to continuing to release further details of the material progress that has been made on the Feasibility Study on a progressive basis over the coming weeks.”

On behalf of the Board of Directors, Mr Cameron McCall, Chairman

For more information please contact:

Joe Phillips 
Managing Director 
+61 7 3221 1796 
communications@macarthurminerals.com 
  
Investor Relations – AustraliaInvestor Relations - Canada
AdvisirInvestor Cubed
Alex Bunney, Manager Client ServicesNeil Simon, CEO
alex.bunney@advisir.com.au+1 647 258 3310
 info@investor3.ca

Company profile
Macarthur is an iron ore development, gold and lithium exploration company that is focused on bringing to production its Western Australia iron ore projects. The Lake Giles Iron Project mineral resources include the Ularring hematite resource (approved for development) comprising Indicated resources of 54.5 million tonnes at 47.2% Fe and Inferred resources of 26 million tonnes at 45.4% Fe; and the Lake Giles magnetite resource of 53.9 million tonnes (Measured), 218.7 million tonnes (Indicated) and 997 million tonnes (Inferred). The JORC reporting tables and Competent Person statement for the magnetite and hematite mineral resources have previously been disclosed in ASX market announcements dated 12 August 2020 and 5 December 2019. Macarthur has prominent (~721 square kilometre tenement area) gold, lithium and copper exploration interests in Pilbara region of Western Australia. In addition, Macarthur has lithium brine Claims in the emerging Railroad Valley region in Nevada, USA.

This news release is not for distribution to United States services or for dissemination in the United States

Caution Regarding Forward Looking Statements
Certain of the statements made and information contained in this press release may constitute forward-looking information and forward-looking statements (collectively, “forward-looking statements”) within the meaning of applicable securities laws.  All statements herein, other than statements of historical fact, that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future, including but not limited to statements regarding expected completion of the Feasibility Study; conversion of Mineral Resources to Mineral Reserves or the eventual mining of the Project, are forward-looking statements.  The forward-looking statements in this press release reflect the current expectations, assumptions or beliefs of the Company based upon information currently available to the Company. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and no assurance can be given that these expectations will prove to be correct as actual results or developments may differ materially from those projected in the forward-looking statements.  Factors that could cause actual results to differ materially from those in forward-looking statements include but are not limited to:  unforeseen technology changes that results in a reduction in iron or magnetite demand or substitution by other metals or materials; the discovery of new large low cost deposits of iron magnetite; the general level of global economic activity; failure to complete the FS; inability to demonstrate economic viability of Mineral Resources; and failure to obtain mining approvals.  Readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof. Such statements relate to future events and expectations and, as such, involve known and unknown risks and uncertainties. The forward-looking statements contained in this press release are made as of the date of this press release and except as may otherwise be required pursuant to applicable laws, the Company does not assume any obligation to update or revise these forward-looking statements, whether as a result of new information, future events or otherwise.


Primary Logo

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok