TORONTO, Jan. 18, 2018 (GLOBE NEWSWIRE) -- Inventus Mining Corp. (TSX VENTURE:IVS) (“Inventus” or the “Company”) is pleased to announce that it has engaged STEINERT and WSP to help advance the Pardo project to the next phase of development.
“On the heels of a very positive result from our recently completed 1,000 tonne bulk sample at Pardo, we are moving ahead with engineering studies to build on our technical knowledge and test real-world mining equipment in preparation for the next phase of development, which will involve larger scale trial mining,” said Stefan Spears, Chairman and CEO.
STEINERT is a global leader in sorting and separation solutions for the mining industry. The firm has over 125 years of experience, and excels at providing customers with technologically advanced sorting solutions. STEINERT will be evaluating the performance of their state-of-the-art multi-sensor ore sorting machine on material from the Pardo project. The demonstration machine used for testing is located in Kentucky, but similar units may soon be accessible much closer to the project in Sudbury and Timmins. www.steinertglobal.com
WSP is a global engineering firm based in Montréal, with over 700 mining specialists worldwide. They offer the mining companies comprehensive solutions at every stage of a mining project development or implementation. WSP will be updating the NI 43-101 Technical Report for the Pardo project (the prior report was prepared for Inventus (Ginguro) by WSP in March 2015). www.wsp-pb.com/en/WSP-Canada/
About Inventus Mining Corp.
Inventus is a mineral exploration and development company focused on the world-class mining district of Sudbury, Ontario. Our principal asset is a 100% interest in the advanced exploration stage Pardo Paleoplacer Gold Project located 65 km northeast of Sudbury. Pardo is the first important paleoplacer gold discovery found in North America. Inventus has 106,971,069 common shares outstanding (116,965,236 shares on a fully diluted basis).
Visit http://www.inventusmining.com for more information.
For further information, please contact:
Mr. Stefan Spears
Chairman and CEO
Inventus Mining Corp.
Tel: (647) 258-0395 x280
E-mail: info@inventusmining.com
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, regulation services provider, securities commission or other regulatory authority has approved or disapproved the information contained in this news release.
Forward-Looking Statements
This News Release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company’s future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as “believes”, “anticipates”, “expects”, “estimates”, “may”, “could”, “would”, “if”, “yet”, “potential”, “undetermined”, “objective”, or “plan”. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management’s expectations.
Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company’s objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions.
Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to the failure to identify mineral resources at Pardo, the inability to complete a feasibility study which recommends a production decision, the preliminary and limited nature of metallurgical test results (including the result of the bulk sample as described herein), delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political and legal risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company’s public documents filed on SEDAR.
Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.