Vancouver, British Columbia--(Newsfile Corp. - September 24, 2019) - Red Pine Exploration (TSXV: RPX) has announced the completion of 14 diamond drill holes at its Wawa gold project in Northern Ontario. Although assays are pending, gold visible to the naked eye was observed in both holes completed in the deeper extension of, and beyond the footprint of, the NI 43-101 Surluga Resource as well as in 4 drill holes in the Cooper Shear Zone.
For more information, please view the InvestmentPitch Media "video" which provides additional information on the company and this news. If this link is not enabled, please visit www.InvestmentPitch.com and enter "Red Pine" in the search box.
Cannot view this video? Visit:
http://www.investmentpitch.com/video/0_g366wsto/Red-Pine-Exploration-has-announced-the-completion-of-14-diamond-drill-holes-at-its-Wawa-gold-project-in-Northern-Ontario
The drill program where visible gold was encountered in drill core from 2 holes at the Jubilee Shear Zone is still on-going, testing the deeper extensions of the shear zone which hosts the Surluga Deposit. Historic deep drill holes over a strike length of 350 meters in a southern extension of the Surluga deposit indicate that there's continuity in the structure and that gold mineralization exists 500 meters down-dip of the current resource boundary.
Red Pine's recent re-interpretation of surveys and the company's own short-wave infrared measurements in holes drilled by Red Pine also indicate that the structure remains favorable to host high-grade gold at depth.
Red Pine's current drilling at the Jubilee Shear Zone is planned at depths of 450 to 500 metres to confirm the deposit's down-dip extension beyond the current 350-meter resource boundary.
Parallel structures between the Jubilee and Hornblende Shear Zones were intersected with an additional two diamond drill holes to test a wide zone of gold mineralization that was discovered in 2018 where wide zones of quartz veining were intersected in the extension of hole SD-18-178 that assayed 0.4 grams per tonne gold over 73.8 meters, including 13 grams per tonne gold over 1.08 meters.
The Cooper Shear Zone target is located one kilometer east of the 43-101 Surluga resource and 2.8 kilometers northeast of the 43-101 Minto Mine South resource. This drill program, with assays pending, now shows the zone extending down dip over a strike length of 325 meters. The newly identified mineralized gold structures being drilled at the Cooper Deformation Corridor are similar geologically to the Minto Mine South Structure that hosts the Minto Mine South Deposit.
Extensive information of the company's history, technical reports including the recently updated NI 43-101 resource update and the past year's successful exploration and drilling results, is available on the company's website at www.redpineexp.com. Additional videos covering previous news are also available on www.investmentpitch.com.
For more information, please visit the company's website www.redpineexp.com, or contact Quentin Yarie, President & CEO at 416-364-7024, or email qyarie@redpineexp.com. Investor relations is handled by Mia Boiridy, who can be contacted at 416-364-7024, or by email at mboiridy@redpineexp.com.
About InvestmentPitch Media
Investmentpitch Media leverages the power of video, which together with its extensive distribution, positions a company's story ahead of the 1,000's of companies seeking awareness and funding from the financial community. The company specializes in producing short videos based on significant news releases, research reports and other content of interest to investors.
CONTACT:
InvestmentPitch Media
Barry Morgan, CFO
bmorgan@investmentpitch.com
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/48077