TORONTO, ON / ACCESSWIRE / March 30, 2023 / Jaguar Mining Inc. ("Jaguar" or the "Company") (TSX:JAG)(OTCQX:JAGGF) today announced financial results for the fourth quarter and full year ended December 31, 2022. All figures are in US Dollars, unless otherwise expressed.
Fourth Quarter Highlights
_________________________________
1 This is a Non-GAAP financial performance measure with no standard definition under IFRS. For more details, refer to the Non-GAAP Performance Measures section of the MD&A.
Full Year Highlights
Cash Position and Working Capital1
Full Year 2023 Guidance
The Company previously provided its 2023 guidance on January 11, 2023. Details of production and cost guidance for the year are summarized in the table below.
2023 Operating Parameters | Low | High |
Production (oz of gold) | 84,000 | 88,000 |
All-In Sustaining Costs ($/oz)1 | $1,275 | $1,375 |
(US$1:BRL5.20)
Vern Baker, President and CEO of Jaguar Mining stated: "We are pleased to report our fourth quarter and full year financial results for 2022. It was a challenging year. We focused on investing in strengthening our mines, developing the Faina project, and exploration. This investment in exploration, development, equipment, and project engineering are providing the base for our future production. Our primary growth source remains the Faina project where we have been investing in an access ramp, in significant upgrading of the resource through surface drilling, and in progressing engineering to allow full definition of the project. For the year, we kept our total sustaining capital relatively consistent while we were able to rehabilitate a ventilation raise and pay for a significant portion of a new truck fleet for the Pilar mine. We also increased our growth and exploration spending by 90% as we invested strongly into future opportunities.
"In 2022, balance sheet strength and free cash flow generation enabled us to invest almost $24 million in growth projects, including advancing the Faina project. We also committed an additional $6 million into our greenfield exploration effort while paying $7 million in dividends. Our cash balance was impacted in the fourth quarter with more development, the rehabilitation of the ventilation raise and the purchase of a new fleet of haul trucks for Pilar. These trucks match a partial fleet we have at Turmalina that have positively impacted performance in our mine haulage."
_________________________________
1 This is a Non-GAAP financial performance measure with no standard definition under IFRS. For more details, refer to the Non-GAAP Performance Measures section of the MD&A.
During the fourth quarter, our team continued to focus on consistent ounce production and increasing development meters at our mines. Diamond drilling reduced during the quarter as our Faina drilling efforts came to an end and we began preparing for new campaigns in 2023 at both mines and at several exploration opportunities."
Fourth Quarter and Full Year 2022 Results
Financial and Operational Highlights | |||||||||||
($ thousands, except where indicated) | Three months ended December 31, | Year ended December 31, | |||||||||
2022 | 2021 | 2022 | 2021 | ||||||||
Financial Data | (Restated)1 | (Restated)1 | |||||||||
Revenue | $ | 36,108 | $ | 42,703 | $ | 142,500 | $ | 151,467 | |||
Operating costs | 21,439 | 18,838 | 84,229 | 70,337 | |||||||
Depreciation | 5,229 | 5,089 | 20,175 | 21,092 | |||||||
Gross profit | 9,440 | 18,776 | 38,096 | 60,038 | |||||||
Net income1 | 11,525 | 3,552 | 21,440 | 24,055 | |||||||
Per share ("EPS")1 | 0.16 | 0.05 | 0.30 | 0.33 | |||||||
EBITDA1 | 19,274 | 8,887 | 49,699 | 53,929 | |||||||
Adjusted EBITDA1,2,3 | 10,995 | 18,523 | 42,397 | 66,454 | |||||||
Adjusted EBITDA per share1,2,3 | 0.15 | 0.26 | 0.59 | 0.92 | |||||||
Cash operating costs (per ounce sold)2 | 1,024 | 802 | 1,052 | 831 | |||||||
All-in sustaining costs (per ounce sold)2 | 1,597 | 1,127 | 1,483 | 1,215 | |||||||
Average realized gold price (per ounce)2 | 1,724 | 1,819 | 1,780 | 1,790 | |||||||
Cash generated from operating activities | 10,352 | 9,581 | 40,765 | 45,036 | |||||||
Free cash flow2 | 1,509 | 8,168 | 17,936 | 24,079 | |||||||
Free cash flow (per ounce sold)2 | 72 | 348 | 224 | 284 | |||||||
Sustaining capital expenditures2 | 10,289 | 6,015 | 26,417 | 25,671 | |||||||
Non-sustaining capital expenditures2 | 5,934 | 4,279 | 23,805 | 12,500 | |||||||
Total capital expenditures | 16,223 | 10,294 | 50,222 | 38,171 | |||||||
1 Restatement of the financial statements for the year ended December 31, 2021, further information available on the 2021 Restatement note. | |||||||||||
2 Average realized gold price, sustaining and non-sustaining capital expenditures, cash operating costs and all-in sustaining costs, free cash flow, EBITDA and adjusted EBITDA, and adjusted EBITDA per share are non-GAAP financial performance measures with no standard definition under IFRS. Refer to the Non-GAAP Financial Performance Measures section of the MD&A. | |||||||||||
3 Adjusted EBITDA excludes non-cash items such as impairment, foreign exchange,stock-based compensation and write downs. For more details refer to the Non-GAAP Performance Measures section of the MD&A. | |||||||||||
Three months ended December 31, | Year ended December 31, | ||||||||||
2022 | 2021 | 2022 | 2021 | ||||||||
Operating Data | |||||||||||
Gold produced (ounces) | 21,116 | 22,903 | 80,968 | 83,878 | |||||||
Gold sold (ounces) | 20,940 | 23,479 | 80,050 | 84,638 | |||||||
Primary development (metres) | 983 | 1,174 | 3,659 | 4,438 | |||||||
Exploration development (metres) | 583 | 284 | 2,649 | 284 | |||||||
Secondary development (metres) | 1,538 | 1,189 | 5,264 | 4,835 | |||||||
Definition, infill, and exploration drilling (metres) | 12,757 | 27,818 | 93,311 | 89,181 |
2021 Restatement
During the preparation of the Company's financial statements for the year ended December 31, 2022, an error was identified on the determination of the net book value in the impairment model for one of the cash-generating units (CGUs) for the year ended December 31, 2021, and as such, required a restatement of the financial statements for the year ended December 31, 2021, March 31 2022, June 30, 2022 and September 30, 2022, to reflect an impairment. There was no impact to the consolidated statement of cash flows as a result of this restatement of impairment charges. For further details, consult Note 27 of the audited consolidated financial statements for the year ended December 31, 2022, available on SEDAR. KPMG LLP has not withdrawn its audit opinion letter dated March 21, 2022, that accompanies the Company's financial statements for the year ended December 31, 2021 (as filed on SEDAR on March 21, 2022). Going forward in 2023, the Company will design and implement additional internal controls to review the impact of past impairments and reversals of past impairments on the calculation of depreciation and net book values, as well as policies and procedures to improve the overall effectiveness of internal control over financial reporting of the impairment model. Notwithstanding, the Company is confident that its disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR) were effective for the Company's annual 2022 filings without a material weakness.
Non-GAAP performance
The Company has included the following Non-GAAP performance measures in this document: cash operating costs per ounce of gold sold, all-in sustaining costs per ounce of gold sold, average realized gold price (per ounce of gold sold), sustaining capital expenditures, non-sustaining capital expenditures, adjusted operating cash flow, free cash flow, earnings before interest, taxes, depreciation and amortization (EBITDA), adjusted EBITDA and working capital. These Non-GAAP performance measures do not have any standardized meaning prescribed by IFRS and, therefore, may not be comparable to similar measures presented by other companies.
The Company believes that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate the Company's performance. Accordingly, they are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. More specifically, Management believes that these figures are a useful indicator to investors and management of a mine's performance as they provide: (i) a measure of the mine's cash margin per ounce, by comparison of the cash operating costs per ounce to the price of gold; (ii) the trend in costs as the mine matures; and (iii) an internal benchmark of performance to allow for comparison against other mines. The definitions of these performance measures and reconciliation of the Non-GAAP measures to reported IFRS measures are outlined below.
Reconciliation of Free Cash Flow1
Free cash flow | |||||||||||
($ thousands, except where indicated) | Three months ended December 31, | Year ended December 31, | |||||||||
2022 | 2021 | 2022 | 2021 | ||||||||
Cash generated from operating activities | $ | 10,352 | $ | 9,581 | $ | 40,765 | $ | 45,036 | |||
Adjustments | |||||||||||
Asset Retirement Obligation | 1,446 | 4,602 | 3,588 | 4,714 | |||||||
Sustaining capital expenditures2 | (10,289) | (6,015) | (26,417) | (25,671) | |||||||
Free cash flow | $ | 1,509 | $ | 8,168 | $ | 17,936 | $ | 24,079 | |||
Ounces of gold sold | 20,940 | 23,479 | 80,050 | 84,638 | |||||||
Free cash flow per ounce sold | $ | 72 | $ | 348 | $ | 224 | $ | 284 | |||
1 This is a non-GAAP financial performance measure with no standard definition under IFRS. | |||||||||||
2 Further detail on the sustaining capital expenditures composition can be found on the reconciliation of sustaining capital and non-sustaining capital expenditures in the non-GAAP reconciliation. |
Reconciliation of Cash Operating Costs, All-In Sustaining Costs and All-In Costs per Ounce Sold1
Reconciliation of Cost of Production to Cash Operating Costs, All-in Sustaining Costs and All-in Costs | |||||||||||||||
($ thousands, except where indicated) | Three months ended December 31, | Year ended December 31, | |||||||||||||
2022 | 2021 | 2022 | 2021 | ||||||||||||
Operating costs | $ | 21,439 | $ | 18,838 | $ | 84,229 | $ | 70,337 | |||||||
General & administration expenses | 1,636 | 1,507 | 6,925 | 5,703 | |||||||||||
Corporate stock-based compensation | 77 | 88 | 1,163 | 1,044 | |||||||||||
Sustaining capital expenditures1 | 10,289 | 6,015 | 26,417 | 25,671 | |||||||||||
All-in sustaining cash costs | 33,441 | 26,448 | 118,734 | 102,755 | |||||||||||
Reclamation (operating sites) | - | 7 | 8 | 60 | |||||||||||
All-in sustaining costs | $ | 33,441 | $ | 26,455 | $ | 118,742 | $ | 102,815 | |||||||
Non-sustaining capital expenditures | 5,934 | 4,279 | 23,805 | 12,500 | |||||||||||
Exploration and evaluation costs (greenfield) | 1,543 | 1,829 | 6,037 | 5,129 | |||||||||||
Reclamation (non-operating sites) | - | 94 | 2 | 155 | |||||||||||
Care and maintenance (non-operating sites) | 162 | 237 | 609 | 1,013 | |||||||||||
All-in costs | $ | 41,080 | $ | 32,894 | $ | 149,195 | $ | 121,612 | |||||||
Ounces of gold sold | 20,940 | 23,479 | 80,050 | 84,638 | |||||||||||
Cash operating costs per ounce sold2 | $ | 1,024 | $ | 802 | $ | 1,052 | $ | 831 | |||||||
All-in sustaining costs per ounce sold2 | $ | 1,597 | $ | 1,127 | $ | 1,483 | $ | 1,215 | |||||||
All-in costs per ounce sold2 | $ | 1,962 | $ | 1,401 | $ | 1,864 | $ | 1,437 | |||||||
Average realized gold price | $ | 1,724 | $ | 1,819 | $ | 1,780 | $ | 1,790 | |||||||
Cash operating margin per ounce sold | $ | 700 | $ | 1,017 | $ | 728 | $ | 959 | |||||||
All-in sustaining margin per ounce sold | $ | 127 | $ | 692 | $ | 297 | $ | 575 | |||||||
1 Capital expenditures are included in our calculation of all-in sustaining costs and all-in costs. | |||||||||||||||
2 Cash operating costs, all-in sustaining costs and all-in costs are all non-GAAP financial performance measures with no standard definition under IFRS. Result may not calculate due to rounding. |
Reconciliation of sustaining capital and non-sustaining capital expenditures1
Capital Expenditures1 | |||||||||||
($ thousands) | Three months ended December 31, | Year ended December 31, | |||||||||
2022 | 2021 | 2022 | 2021 | ||||||||
Sustaining capital1 | |||||||||||
Primary development | $ | 5,778 | $ | 4,129 | $ | 16,830 | $ | 15,700 | |||
Brownfield exploration | 220 | 316 | 1,097 | 1,042 | |||||||
Mine-site sustaining | 4,177 | 1,454 | 8,059 | 8,501 | |||||||
Other sustaining capital2 | 114 | 116 | 431 | 428 | |||||||
Total sustaining capital1 | 10,289 | 6,015 | 26,417 | 25,671 | |||||||
Non-sustaining capital (including capital projects)1 | |||||||||||
Mine-site non-sustaining | 4,348 | 1,862 | 19,991 | 5,882 | |||||||
Asset retirement obligation - non-sustaining2 | 1,446 | 2,261 | 3,588 | 4,233 | |||||||
Other non-sustaining capital1 | 140 | 156 | 226 | 2,385 | |||||||
Total non-sustaining capital1 | 5,934 | 4,279 | 23,805 | 12,500 | |||||||
Total capital expenditures | $ | 16,223 | $ | 10,294 | $ | 50,222 | $ | 38,171 | |||
1 Sustaining and non-sustaining capital are non-GAAP financial measures with no standard definition under IFRS. Refer to the non-GAAP Financial Performance Measures section of the MD&A. Capital expenditures are included in the calculation of all-in sustaining costs and all-in costs. | |||||||||||
2 Asset retirement obligation - non-sustaining is related to expenditures with dam closing projects. Payments related to the Company asset retirement obligation are classified as operating activities in accordance with IFRS financial measures. |
Reconciliation of Net Income (Loss) to EBITDA and Adjusted EBITDA1
Reconciliation of Net Income (Loss) to EBITDA | |||||||||||
($ thousands, except where indicated) | Three months ended December 31, | Year ended December 31, | |||||||||
2022 | 2021 (Restated)1 | 2022 | 2021 (Restated)1 | ||||||||
Net Income | $ | 11,525 | $ | 3,552 | $ | 21,440 | $ | 24,055 | |||
Income tax expense | 1,884 | - | 5,426 | 7,939 | |||||||
Finance costs | 617 | 227 | 2,581 | 776 | |||||||
Depreciation and amortization | 5,248 | 5,108 | 20,252 | 21,159 | |||||||
EBITDA2 | $ | 19,274 | $ | 8,887 | $ | 49,699 | $ | 53,929 | |||
Impairment (reversal) charges | (10,661) | 10,135 | (10,661) | 10,135 | |||||||
Changes in other provisions and VAT taxes | 1,283 | (10) | 1,188 | 1,358 | |||||||
Foreign exchange loss (gain) | 1,022 | (577) | 1,008 | (1,698) | |||||||
Stock-based compensation | 77 | 88 | 1,163 | 1,044 | |||||||
Other non-operating expenses (recoveries)3 | - | - | - | 1,686 | |||||||
Adjusted EBITDA2 | $ | 10,995 | $ | 18,523 | $ | 42,397 | $ | 66,454 | |||
Weighted average outstanding shares | 72,452,927 | 72,441,622 | 72,461,530 | 72,396,926 | |||||||
Adjusted EBITDA per share2 | $ | 0.15 | $ | 0.26 | $ | 0.59 | $ | 0.92 | |||
1 Restatement of the financial statements for the year ended December 31, 2021, further information available on the 2021 Restatement note. | |||||||||||
2 This is a non-GAAP financial performance measure with no standard definition under IFRS. | |||||||||||
3 CentroGold royalty interest sales. As a result of the sale, the Company (i) derecognized the $8.5 million CentroGold project royalty interest asset, (ii) received and recorded $7.0 million in Cash, (iii) recorded $0.2 million in legal and consulting costs associated with the transaction. |
Working Capital1
Working capital | |||||
($ thousands) | December 31, 2022 | December 31, 2021 | |||
Cash and cash equivalents | $ | 25,208 | $ | 40,373 | |
Non-cash working capital | |||||
Other current assets: | |||||
Restricted cash | 618 | 501 | |||
Inventory | 16,239 | 14,546 | |||
Recoverable taxes | 8,545 | 5,143 | |||
Other accounts receivable | 343 | 92 | |||
Prepaid expenses and advances | 3,615 | 2,176 | |||
Current liabilities: | |||||
Accounts payable and accrued liabilities | (19,782) | (15,660) | |||
Notes payable | (3,040) | (3,027) | |||
Lease liabilities | (2,414) | (1,431) | |||
Current tax liability | (1,881) | - | |||
Other taxes payable | (1,056) | (935) | |||
Reclamation provisions | (3,156) | (6,847) | |||
Legal and other provisions | (3,751) | (2,941) | |||
Working capital1 | $ | 19,488 | $ | 31,990 | |
1 This is a non-GAAP financial performance measure with no standard definition under IFRS. |
Qualified Person
Scientific and technical information contained in this press release has been reviewed and approved by Jonathan Victor Hill, BSc (Hons) (Economic Geology - UCT), FAUSIMM, Vice President Geology and Exploration, who is also an employee of Jaguar Mining Inc., and is a "qualified person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").
The Iron Quadrangle
The Iron Quadrangle has been an area of mineral exploration dating back to the 16th century. The discovery in 1699-1701 of gold contaminated with iron and platinum-group metals in the southeastern corner of the Iron Quadrangle gave rise to the name of the town Ouro Preto (Black Gold). The Iron Quadrangle contains world-class multi-million-ounce gold deposits such as Morro Velho, Cuiabá, and São Bento. Jaguar holds the third largest gold land position in the Iron Quadrangle with just over 25,000 hectares.
About Jaguar Mining Inc.
Jaguar Mining Inc. is a Canadian-listed junior gold mining, development, and exploration company operating in Brazil with three gold mining complexes and a large land package with significant upside exploration potential from mineral claims. The Company's principal operating assets are located in the Iron Quadrangle, a prolific greenstone belt in the state of Minas Gerais and include the Turmalina Gold Mine Complex and Caeté Mining Complex (Pilar and Roça Grande Mines, and Caeté Plant). The Company also owns the Paciência Gold Mine Complex, which has been on care and maintenance since 2012. The Roça Grande Mine has been on temporary care and maintenance since April 2019. Additional information is available on the Company's website at www.jaguarmining.com.
For further information please contact:
Vernon Baker Chief Executive Officer Jaguar Mining Inc. vernon.baker@jaguarmining.com 416-847-1854 | Hashim Ahmed Chief Financial Officer Jaguar Mining Inc. hashim.ahmed@jaguarmining.com 416-847-1854 |
Forward-Looking Statements
Certain statements in this news release constitute "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking statements and information are provided for the purpose of providing information about management's expectations and plans relating to the future. All of the forward-looking information made in this news release is qualified by the cautionary statements below and those made in our other filings with the securities regulators in Canada. Forward-looking information contained in forward-looking statements can be identified by the use of words such as "are expected," "is forecast," "is targeted," "approximately," "plans," "anticipates," "projects," "anticipates," "continue," "estimate," "believe" or variations of such words and phrases or statements that certain actions, events or results "may," "could," "would," "might," or "will" be taken, occur or be achieved. All statements, other than statements of historical fact, may be considered to be or include forward-looking information. This news release contains forward-looking information regarding, among other things, expected sales, production statistics, ore grades, tonnes milled, recovery rates, cash operating costs, definition/delineation drilling, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of projects and new deposits, success of exploration, development and mining activities, currency fluctuations, capital requirements, project studies, mine life extensions, restarting suspended or disrupted operations, continuous improvement initiatives, and resolution of pending litigation. The Company has made numerous assumptions with respect to forward-looking information contained herein, including, among other things, assumptions about the estimated timeline for the development of its mineral properties; the supply and demand for, and the level and volatility of the price of, gold; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; the receipt of necessary permits; market competition; ongoing relations with employees and impacted communities; political and legal developments in any jurisdiction in which the Company operates being consistent with its current expectations including, without limitation, the impact of any potential power rationing, tailings facility regulation, exploration and mine operating licenses and permits being obtained and renewed and/or there being adverse amendments to mining or other laws in Brazil and any changes to general business and economic conditions. Forward-looking information involves a number of known and unknown risks and uncertainties, including among others: the risk of Jaguar not meeting the forecast plans regarding its operations and financial performance; uncertainties with respect to the price of gold, labour disruptions, mechanical failures, increase in costs, environmental compliance and change in environmental legislation and regulation, weather delays and increased costs or production delays due to natural disasters, power disruptions, procurement and delivery of parts and supplies to the operations; uncertainties inherent to capital markets in general (including the sometimes volatile valuation of securities and an uncertain ability to raise new capital) and other risks inherent to the gold exploration, development and production industry, which, if incorrect, may cause actual results to differ materially from those anticipated by the Company and described herein. In addition, there are risks and hazards associated with the business of gold exploration, development, mining and production, including environmental hazards, tailings dam failures, industrial accidents and workplace safety problems, unusual or unexpected geological formations, pressures, cave-ins, flooding, chemical spills, procurement fraud and gold bullion thefts and losses (and the risk of inadequate insurance, or the inability to obtain insurance, to cover these risks). Accordingly, readers should not place undue reliance on forward-looking information.
For additional information with respect to these and other factors and assumptions underlying the forward-looking information made in this news release, see the Company's most recent Annual Information Form and Management's Discussion and Analysis, as well as other public disclosure documents that can be accessed under the issuer profile of "Jaguar Mining Inc." on SEDAR at www.sedar.com. The forward-looking information set forth herein reflects the Company's reasonable expectations as at the date of this news release and is subject to change after such date. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law. The forward-looking information contained in this news release is expressly qualified by this cautionary statement.
Non-IFRS Measures
This news release provides certain financial measures that do not have a standardized meaning prescribed by IFRS. Readers are cautioned to review the below stated footnotes where the Company expands on its use of non-IFRS measures.
SOURCE: Jaguar Mining Inc.