K92 Mining Announces Maiden Karempe Vein System Drilling Results and High-Grade Epithermal Vein Mineralization

2020-10-22 / @nasdaq

 

  • Results reported for the first six holes drilled by K92 of the largely untested Karempe vein system. Drilling has delineated a well mineralized vein system, intersecting five parallel veins, trending North-South, sub-parallel and ~450m West of the producing Kora deposit.
     
  • Multiple high-grade intersections reported on the KA1 Vein, including hole KRDD0005 recording 2.45 m at 39.82 g/t Au, 6 g/t Ag and 0.19% Cu (40.18 g/t AuEq).
     
  • KRDD0006 recorded multiple intersections including 3.20 m at 17.50 g/t Au, 20 g/t Ag and 0.34% Cu (18.28 g/t AuEq) on the KA1 vein, ~100m down-dip from the high-grade KRDD0005 KA1 vein intersection.
     
  • KA2 vein also encountered significant mineralization, including KRDD0002 recording 1.60 m at 8.61 g/t Au, 3 g/t Ag and 0.06% Cu (8.74 g/t AuEq).
     
  • Mineralization is an intrusive related Au-Cu-Ag epithermal vein system, similar to Kora, open to depth and mapped over 2 km of strike. The interpreted strike length is supported by rock chip sampling, three historical drill holes and K92’s recent drilling.

VANCOUVER, British Columbia, Oct. 22, 2020 (GLOBE NEWSWIRE) -- K92 Mining Inc. (“K92” or the “Company”) (TSX-V: KNT; OTCQX: KNTNF) is pleased to announce results of the first six drill holes completed by K92 on the Karempe Vein System at the Kainantu gold mine in Papua New Guinea. The Karempe Vein System is located near-mine infrastructure, subparallel to and ~450m West from the producing Kora deposit.

To date, five known veins have been recorded at Karempe, with similar vein orientation and intrusive related Au-Cu-Ag mineralization as Kora. The veins are essentially quartz and massive pyrite, and more localized chalcopyrite hosted within competent diorite. The veins remain open to depth and only a fraction of the over 2,000 m strike length, documented by mapping and rock chip sampling, has been drill tested.

A total of six diamond drill holes were reported at Karempe, with intersections recorded in multiple veins. The results are highlighted by the KA1 Vein, with KRDD0005 recording 2.45 m at 39.82 g/t Au, 6 g/t Ag and 0.19% Cu (40.18 g/t AuEq, 2.30 m true width), including 0.75 m at 125.40 g/t Au, 12 g/t Ag, 0.13% Cu (125.75 g/t AuEq, 0.68 m true width). Approximately 100m down-dip from KRDD0005, along the KA1 Vein, hole KRDD0006 recorded 3.20 m at 17.50 g/t Au, 20 g/t Ag and 0.34% Cu (18.28 g/t AuEq, 2.45 m true width), including 1.60 m at 26.58 g/t Au, 38 g/t Ag, 0.66% Cu (28.07 g/t AuEq, 1.19 m true width). Both holes recorded mineralization that is invariably associated with massive sulphide (pyrite-chalcopyrite) and crystalline quartz, encapsulated within broad zones of strong sericite alteration.

Drilling also recorded significant mineralization along the KA2 Vein, highlighted by KRDD0002 recording 1.60 m at 8.61 g/t Au, 3 g/t Ag and 0.06% Cu (8.74 g/t AuEq, 1.31 m true width). The KRDD0002 intersection was reported ~100m to the south along strike from KRDD0005. There are currently two drill rigs at Karempe and through the remainder the year, drilling plans to target both down-dip and strike extensions.

(Gold Equivalent (AuEq) is calculated using copper price of US$3.05/lb, silver price of US$16.05/oz and gold price of US$1,400/oz.)

Chris Muller, K92 Vice President Exploration, stated, “The maiden drill program at Karempe has unveiled an impressive vein system comprising multiple, continuous gold mineralized structures that resemble Kora mineralization. Karempe has approximately 2km of strike length, as demonstrated by surface mapping, and limited drill testing. Together with Kora and Judd, epithermal veins comprising, and proximal to, the Kainantu Gold Mine represent a significant gold/copper mineralized vein field.”

John Lewins, K92 Chief Executive Officer and Director, also added, “With only approximately 20% of the mapped vein field strike length tested and the areas already tested being largely open at depth, the results at Karempe highlight the strong exploration potential at Kainantu. By the end of this year, we plan to have 10 drill rigs on site; 5 underground drill rigs and 5 surface drill rigs, drilling the Karempe, Kora, Kora South and Judd vein systems plus the Blue Lake porphyry concurrently. We expect to increase the number of drill rigs in 2021.”

Karempe Vein System Background

The Karempe vein system was originally recognized by field mapping in the early 1990’s.  Highlands Gold Limited (“HGL”) drilled two holes targeting the Karempe system in 1994; 021BD94 (to 230.5m) which returned 0.9m at 8.5 g/t Au, 57 g/t Ag, 1.32 % Cu and 098BD05 which was terminated at just 49.9m. Barrick drilled one hole, BKDD0025 in October 2009 which returned a number of significant gold/copper intercepts, just prior to the cessation of the mining lease (ML150) drill program. No other drill holes have tested the Karempe vein system and no targeted program was carried out until K92 commenced drilling Karempe in March 2020. Exploration was suspended for ~3 months during the COVID-19 State of Emergency and detailed mapping/sampling and drilling resumed in late June.

See Figure 1 for location map of the Karempe Vein target, existing mine infrastructure and other proximal interpreted veins.

See Figure 2 for cross section of the Karempe Vein System with holes KRDD0005 and KRDD0006.

See Figure 3 for plan view of the area drilled by K92 at the Karempe Vein System.

See Figure 4 for drill core photograph of KRDD0005, 237.30 - 240.83 m. Massive sulphide / quartz vein in sericite altered diorite; downhole interval returned 2.45 m at 39.82 g/t Au, 6 g/t Ag, 0.19% Cu (40.18 g/t AuEq), including 0.75 m at 125.4 g/t Au, 12 g/t Ag, 0.13% Cu (125.75 g/t AuEq).

See Figure 5 for drill core photograph of KRDD0006, 300.06 - 303.70 m. Massive sulphide / quartz vein in altered diorite host; downhole interval returned 3.20 m at 17.5 g/t Au, 20 g/t Ag, 0.34% Cu (18.28 g/t AuEq), including 1.6m at 26.58 g/t Au, 38 g/t Ag, 0.66% Cu (28.07 g/t AuEq).

See Figure 6 for drill core photograph of KRDD0005, 239.7m. Macro photo of massive pyrite-chalcopyrite intergrown with crystalline quartz; part of 0.75 m interval which returned 125.4 g/t Au.

Table 1 - Kainantu Gold Mine – Significant Intercepts from Diamond Drilling at Karempe

Hole_idFrom (m)To (m)Interval
(m)
True width
(m)
Gold g/tSilver g/tCopper %Gold
equivalent
Vein_Id
KRDD0001172.2172.90.710.411.41312.946.31HWS
Including172.2172.50.340.192.23495.2910.95HWS
Including172.5172.90.370.210.66150.792.06HWS
KRDD0001207.4214.16.663.801.98110.613.06KA1
Including207.4207.70.300.171.01424.889.01KA1
Including207.7208.30.520.300.60130.451.46KA1
Including208.3209.00.740.670.1630.110.36KA1
Including209.0209.90.900.820.0620.110.26Ka1
Including209.9211.01.100.632.17231.324.49KA1
Including211.0211.30.300.170.3660.391.03KA1
Including211.3212.31.020.585.45150.546.46KA1
Including212.3212.90.610.550.0920.010.13KA1
Including212.9213.50.540.490.6260.060.79KA1
Including213.5214.10.630.366.2760.066.44KA1
KRDD0001278.0284.06.003.420.3630.200.70KN1
Including278.0279.01.000.570.6180.741.84KN1
Including279.0280.01.000.570.1020.170.39KN1
Including280.0281.31.280.910.0110.010.04KN1
Including281.3282.10.800.570.0610.020.10KN1
Including282.1282.90.820.471.6420.121.84KN1
Including282.9284.01.100.630.0520.140.29KN1
KRDD0001288.9291.02.131.212.0220.092.17Splay
Including288.9290.01.130.640.0410.110.22Splay
Including290.0291.01.000.574.2520.064.37Splay
KRDD0001357.2360.83.602.050.0290.080.26KN2
Including357.2358.20.950.540.0220.040.10KN2
Including358.2359.00.850.480.0120.040.10KN2
Including359.0360.81.801.030.03150.130.42KN2
KRDD0001459.7462.32.571.470.4320.611.39KA2
KRDD000232.237.24.963.800.5210.010.55Splay
Including32.232.60.360.280.65270.031.03Splay
Including32.633.20.600.460.2480.060.43Splay
Including33.234.81.571.200.0120.010.05Splay
Including34.837.22.431.860.2380.030.38Splay
KRDD0002224.9233.08.105.210.3190.030.46Splay
Including224.9226.31.370.880.65270.031.03Splay
Including226.3227.51.230.790.2480.060.43Splay
Including227.5229.01.500.960.0120.010.05Splay
Including229.0231.22.201.410.2380.030.38Splay
Including231.2231.90.700.450.4130.010.47Splay
Including231.9233.01.100.710.4720.010.51Splay
KRDD0002183.0183.60.640.410.1040.080.28HWS
KRDD0002243.3246.83.503.291.7050.091.91KA1
Including243.3244.00.700.401.1930.882.57KA1
Including244.0244.70.740.420.9851.182.85KA1
Including244.7246.01.260.720.2930.040.39KA1
Including246.0246.80.800.465.03110.155.40KA1
KRDD0002267.8268.91.100.780.0410.010.07Splay
KRDD0002282.6287.44.754.460.1120.080.26KN1
including282.6284.31.661.560.0420.020.09KN1
including284.3285.91.641.540.0420.010.09KN1
including285.9286.60.700.660.0120.030.07KN1
including286.6287.40.750.700.4820.431.16KN1
KRDD0002380.1382.82.701.550.0420.130.26KN2
KRDD0002484.0485.61.601.318.6130.068.74KA2
KRDD0002533.6535.62.031.163.9860.314.53KA3
KRDD0003237.9241.13.251.631.8560.062.01HWS
including237.9239.71.850.920.0110.020.06HWS
including239.7240.10.350.1816.86430.3617.96HWS
including239.7240.10.350.1816.86430.3617.96HWS
including240.1241.11.050.520.0810.040.15HWS
KRDD0003254.0255.21.251.212.3010.012.33KA1
KRDD0003315.7320.44.654.030.2620.060.38KN1
Including315.7315.90.200.172.5510.032.61KN1
Including315.9318.12.201.910.2221.031.83KN1
Including318.1319.51.401.210.0422.033.18KN1
Including319.5319.70.200.170.5953.035.29KN1
Including319.7320.40.650.560.0730.080.23KN1
KRDD0003490.1492.01.891.080.0410.010.07KN2
Including490.1490.80.740.420.0220.040.10KN2
Including490.8491.50.650.370.0510.010.06KN2
Including491.5492.00.500.290.0510.010.06KN2
KRDD0003530.1531.11.000.500.7360.311.28Splay
Including530.1530.80.670.330.0130.080.17Splay
Including530.8531.10.330.172.19130.773.53Splay
KRDD0004162.0162.70.700.492.781760.676.04Splay
KRDD0004260.1260.70.570.541.1930.882.57HWS
KRDD0004277.0285.48.437.920.9040.271.37KA1
Including277.0277.40.430.400.4620.100.64KA1
Including277.4278.81.411.321.6330.402.28KA1
Including278.8280.01.191.120.3130.210.67KA1
Including280.0281.31.301.220.2450.370.87KA1
Including281.3282.30.960.900.6130.100.79KA1
Including282.3283.00.740.700.6150.311.15KA1
Including283.0284.01.000.940.6950.231.11KA1
Including284.0284.40.350.331.44160.372.21KA1
Including284.4285.41.050.992.0630.272.51KA1
KRDD0004339.2344.25.031.811.16160.121.54KN1
Including339.2340.41.230.442.13160.112.51KN1
Including340.4342.01.600.580.1540.070.30KN1
Including342.0342.40.400.140.2910.010.32KN1
Including342.4343.91.460.531.66360.202.43KN1
Including343.9344.20.340.121.2470.101.48KN1
KRDD0004416.3416.60.350.153.9740.184.29Splay
KRDD0004420.9426.96.055.482.4020.062.52KN2
Including420.9422.01.151.040.4010.070.51KN2
Including422.0422.80.800.7315.9760.1816.31KN2
Including422.8423.10.300.270.1610.000.18KN2
Including423.1423.80.700.630.3710.010.40KN2
Including423.8425.51.701.540.2120.050.31KN2
Including425.5426.30.800.730.2810.050.37KN2
Including426.3426.90.600.540.6710.030.72KN2
KRDD000522.926.83.902.510.87210.041.20Splay
Including22.924.61.701.090.53220.040.87Splay
Including24.625.81.200.770.49190.040.79Splay
Including25.826.81.000.641.91200.042.23Splay
KRDD0005215.5216.30.850.331.0450.101.26Splay
Including215.5215.80.300.231.0840.101.28Splay
Including215.8216.30.550.100.9670.111.22Splay
KRDD0005200.4204.64.203.441.85150.612.97HWS
Including200.4200.80.400.334.9450.135.21HWS
Including200.8201.20.400.3310.891185.1120.21HWS
Including201.2203.22.001.640.5850.210.96HWS
Including203.2203.60.400.330.1640.070.32HWS
Including203.6203.90.300.250.3220.020.37HWS
Including203.9204.60.700.570.1620.020.21HWS
KRDD0005238.7241.12.452.3039.8260.1940.18KA1
Including238.7238.90.200.190.48111.162.40KA1
Including238.9239.00.150.140.7510.040.83KA1
Including239.0239.80.750.68125.40120.13125.75KA1
Including239.8241.01.251.130.2610.050.35KA1
Including241.0241.10.100.0929.83120.6230.92KA1
KRDD0005241.7242.71.000.980.8440.181.17Splay
KRDD0005285.3290.24.904.830.0310.010.05KN1
Including285.3286.00.700.690.0220.020.08KN1
Including286.0287.71.701.670.0110.010.03KN1
Including287.7288.60.850.840.0310.010.04KN1
Including288.6290.21.651.620.0410.010.06KN1
KRDD0005376.4378.42.050.870.0110.010.02KN2
Including376.4377.10.700.300.0110.010.03KN2
Including377.1378.41.350.570.0110.010.02KN2
KRDD0005451.8455.94.053.810.5160.090.72KA2
Including451.8452.00.200.195.03350.125.66KA2
Including452.0452.40.350.330.46100.331.10KA2
Including452.4452.80.450.420.0220.160.30KA2
Including452.8453.00.200.191.0760.081.27KA2
Including453.0453.60.600.560.1210.010.15KA2
Including453.6454.50.900.850.0210.000.04KA2
Including454.5455.30.750.700.2530.060.39KA2
Including455.3455.90.600.560.64130.151.03KA2
KRDD0005501.8502.00.200.153.43120.314.06KA3
KRDD0006123.5125.21.700.985.1610.015.18Splay
KRDD0006221.2224.12.952.090.86173.005.66Splay
KRDD0006236.6241.54.954.491.50151.263.61HWS
Including236.6237.50.900.821.34333.046.41HWS
Including237.5237.70.200.180.19100.180.59HWS
Including237.7238.40.700.635.77474.6613.50HWS
Including238.4238.80.450.410.5980.231.04HWS
Including238.8240.01.201.091.1630.041.26HWS
Including240.0241.00.950.860.1530.030.23HWS
Including241.0241.20.200.181.0120.021.07HWS
Including241.2241.50.350.320.3620.020.41HWS
KRDD0006300.3303.53.202.4517.50200.3418.28KA1
Including300.3301.91.601.1926.58380.6628.07KA1
Including301.9302.91.050.800.2110.010.24KA1
Including302.9303.50.600.4624.3250.1024.53KA1
KRDD0006311.6312.61.000.872.6930.243.10Splay

Table 2 - Kainantu Gold Mine – Collar Locations for Karempe Diamond Drilling

Hole_IDEasting (AGD66)Northing (AGD66)Easting (Local)Northing (Local)mRLBearing (AMG)Bearing (Local)InclinationDepth (m)
KRDD0001374394931766829221.0159102.3416502267-55500.3
KRDD0002374408931766029225.2559086.78165876121-55550.9
KRDD0003374394931766829221.0159102.3416503176-69560.4
KRDD0004374408931766029225.2559086.78165876121-63525.4
KRDD0005374394931766929221.7159103.05165356101-55539.7
KRDD0006374408931766029225.2559086.7816585196-68335.7

(1) Gold Equivalent in Table 1 uses copper price of US$3.05/lb; silver price of US$16.05/oz and gold price of US$1,400/oz.

Table 3 – Global Kora Mineral Resource (Effective Date April 2, 2020)

 TonnesGoldSilverCopperAuEq
 mtg/tmozg/tmoz%ktg/tmoz
Measured0.6613.340.2811.60.250.513.414.140.3
Indicated2.478.440.6716.31.290.6315.69.460.8
Total M&I3.139.470.9515.31.540.611910.451.1
Inferred12.677.322.9819.98.111.1139.49.013.7
  • Mineral Resource Estimate is included in a technical report titled, “Independent Technical Report, Mineral Resource Estimate Update and Preliminary Economic Assessment for Expansion of the Kainantu Mine to Treat 1 Mtpa from the Kora Gold Deposit, Kainantu Project, Papua New Guinea” with an effective date of April 2, 2020.
  • The Independent and Qualified Person responsible for the Mineral Resource Estimate is Simon Tear, P.Geo. of H & S Consultants Pty. Ltd., Sydney, Australia.
  • Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
  • Resources were compiled at 1,2,3,4,5,6,7,8,9 and 10 g/t gold cut-off grades.
  • Density (t/m3) is on a per zone basis, K1 and Kora Link: 2.84 t/m3; K2: 2.93 t/m3; Waste: 2.8 t/m3
  • Reported tonnage and grade figures are rounded from raw estimates to reflect the order of accuracy of the estimate.
  • Minor variations may occur during the addition of rounded numbers.
  • Calculations used metric units (metres, tonnes and g/t)
  • Gold equivalents are calculated as AuEq = Au g/t + ((0.923 x Cu%)*1.38)+ ((0.77 x Ag g/t*0.0115). Gold price US$1,400/oz; Silver US$16.05/oz; Copper US$3.05/lb. Metal payabilities and recoveries are incorporated into the AuEq formula. Recoveries of 92.3% for copper and 77% for silver.

Qualified Person

K92 mine geology manager and mine exploration manager, Andrew Kohler, PGeo, a qualified person under the meaning of Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has reviewed and is responsible for the technical content of this news release. 

About K92

K92 Mining Inc. is engaged in the production of gold, copper and silver from the Kora deposit at the Kainantu Gold Mine in the Eastern Highlands province of Papua New Guinea, as well as exploration and development of mineral deposits in the immediate vicinity of the mine.  The Company declared commercial production from Kainantu in February 2018 and is in a strong financial position.

The Company commenced an expansion of the mine based on an updated Preliminary Economic Assessment on the property which was published in January 2019 and updated in July 2020. K92 is operated by a team of mining company professionals with extensive international mine-building and operational experience.

On Behalf of the Company,

John Lewins, Chief Executive Officer and Director

For further information, please contact David Medilek, P.Eng., CFA at +1-604-687-7130.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain “forward-looking statements” under applicable Canadian securities legislation. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. All statements that address future plans, activities, events, or developments that the Company believes, expects or anticipates will or may occur are forward-looking information, including statements regarding the realization of the preliminary economic analysis for the Kainantu Project, expectations of future cash flows, the planned plant expansion, production results, cost of sales, sales of production, potential expansion of resources and the generation of further drilling results which may or may not occur. Forward-looking statements and information contained herein are based on certain factors and assumptions regarding, among other things, the market price of the Company’s securities, metal prices, exchange rates, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes, failure of plant, equipment or processes to operate as anticipated, accidents, labour disputes, claims and limitations on insurance coverage and other risks of the mining industry, changes in national and local government regulation of mining operations in PNG, mitigation of the Covid-19 pandemic, continuation of the lifted state of emergency, and regulations and other matters. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.

Figure 1 – Kainantu Vein Field plan view, showing location of the Karempe vein system relative to Kora and Judd vein systems plus Karempe drill traces and rock chip sampling is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/efee88a6-a4b9-44dd-9e9f-073da09e7d5a 

Figure 2 – Karempe vein system cross section is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/0a5bebc1-bfe0-4b77-b3f3-6a6c5a505c3b 

Figure 3 – Karempe Vein System plan map of area drilled by K92 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/64ac6249-3559-42b7-8fef-6457871a7484 

Figure 4 – KRDD0005 Core Photograph, 237.30 - 240.83m. Massive sulphide / quartz vein in sericite altered diorite; downhole interval returned 2.45m at 39.82 g/t Au, 6 g/t Ag, 0.19% Cu (40.18 g/t AuEq), including 0.75m at 125.4 g/t Au, 12 g/t Ag, 0.13% Cu (125.75 g/t AuEq) is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/14eeb028-96e4-4390-9a81-057a5018fdb5 

Figure 5 – KRDD0006 Core Photograph, 300.06 - 303.70m. Massive sulphide / quartz vein in altered diorite host; downhole interval returned 3.20 m at 17.5 g/t Au, 20 g/t Ag, 0.34% Cu (18.28 g/t AuEq), including 1.6m at 26.58 g/t Au, 38 g/t Ag, 0.66% Cu (28.07 g/t AuEq) is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/292d733c-bb30-4e33-b406-97228af18d3b 

Figure 6 – KRDD0005 Core Photograph, 239.7m. Macro photo of massive pyrite-chalcopyrite intergrown with crystalline quartz; part of 0.75 m interval which returned 125.4 g/t Au is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/c260f82b-b5ca-413d-af86-aeb548618a4c 

Primary Logo

Figure 1

Kainantu Vein Field plan view, showing location of the Karempe vein system relative to Kora and Judd vein systems plus Karempe drill traces and rock chip sampling.
Figure 2

Karempe vein system cross section.
Figure 3

Karempe Vein System plan map of area drilled by K92
Figure 4

KRDD0005 Core Photograph, 237.30 - 240.83m. Massive sulphide / quartz vein in sericite altered diorite; downhole interval returned 2.45m at 39.82 g/t Au, 6 g/t Ag, 0.19% Cu (40.18 g/t AuEq), including 0.75m at 125.4 g/t Au, 12 g/t Ag, 0.13% Cu (125.75 g/t AuEq).
Figure 5

KRDD0006 Core Photograph, 300.06 - 303.70m. Massive sulphide / quartz vein in altered diorite host; downhole interval returned 3.20 m at 17.5 g/t Au, 20 g/t Ag, 0.34% Cu (18.28 g/t AuEq), including 1.6m at 26.58 g/t Au, 38 g/t Ag, 0.66% Cu (28.07 g/t AuEq).
Figure 6

KRDD0005 Core Photograph, 239.7m. Macro photo of massive pyrite-chalcopyrite intergrown with crystalline quartz; part of 0.75 m interval which returned 125.4 g/t Au.

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok