Karmin's JV Partner Votorantim releases Aripuan?? PEA as part of share listing filing on TSX & NYSE

2017-09-28 / @nasdaq

 


  • Preliminary Economic Assessment ("PEA") of Karmin's 30% owned Aripuan?? Zinc Lead Silver Project ("Aripuan??") filed on SEDAR by VM Holding S.A. ("VM").
  • VM, operator of the Project and controlled by Votorantim S.A., filed a prospectus on SEDAR anticipating the listing of VM shares on the New York and Toronto stock exchanges.
  • The PEA outlines;
    • the initiation of mining at Aripuan?? in 2020 with a mine life of 24 years.
    • production of 1.8 million tonnes per year (5,000 tonnes per day) will process 37 million tonnes from the measured and indicated resources of 21.8 million tonnes and the inferred resources of 24.6 million tonnes.
    • pre-production capital costs totaling US$354 million.
    • using life of mine metal prices of US$1.06/lb. Zn, US$0.88/lb. Pb, US$2.74/lb. Cu, US$18.95/oz. Ag, and US$1,278/oz. Au, Aripuan??'s economics are:
      • pre-tax IRR of 19%,
      • US$461 million pre-tax NPV at 7% discounting,
      • after-tax IRR of 17% using a 34% tax rate which does not include any tax advantages normally available in Aripuan??'s locale, and
      • US$321 million after-tax NPV at 7% discounting.
    • Project Sensitivity; a 10% increase in the metal prices or head grades increases the NPV by approximately 75%.
  • The VM prospectus indicates;
    • targeted completion of a feasibility study for Aripuan?? in the second quarter of 2018, and
    • approximately US$209 million of the net proceeds from the sale of VM common shares will be used to advance development of Aripuan?? of which US$59 million will be used in 2018 and US$150 million in 2019.
  • Karmin has a 30% carried interest in Aripuan?? and is not required to contribute to the project costs until one year after the completion of a feasibility study and notification from VM that the development of Aripuan?? will proceed.

TORONTO, Sept.28, 2017(GLOBE NEWSWIRE) -- Karmin Exploration Inc. ("Karmin") (TSXV:KAR) (Lima Stock Exchange:KAR) is pleased to announce the filing by VM on September 21, 2017 of a NI 43-101 PEA on Aripuan??, 30% owned by Karmin. The PEA was prepared by RPA Inc. ("RPA") and is available on SEDAR under VM's profile.

VM indirectly owns 70% of the Project and is a company controlled by Votorantim S.A.VM has filed a prospectus, which is available on SEDAR, which anticipates the listing of VM shares on the New York and Toronto stock exchanges.

David Brace, Karmin's CEO commented; "We are delighted to see the process of listing of Votorantim Metais in the NYSE and TSX. We believe that as Votorantim Metais becomes a publicly traded company, investors will be better able to assess the value of our 30% interest in Aripuan??, as Aripuan?? is an important element in Votorantim Metais' future growth strategy, as presented in the filing documents."

Aripuan??

The Aripuan?? project is owned by Minera????o Dardanelos Ltda., a joint venture between VMZ (which holds a 63.3% interest), Milpo (which holds a 7.7% interest) and Minera????o Rio Aripuan?? Ltda., a subsidiary of Karmin Exploration Inc. (which holds the remaining 30%). Aripuan?? is an underground polymetallic project containing zinc, lead and copper, with an anticipated mine life of 24 years and a projected start date in 2020. The estimated aggregate capital expenditure required for this project is US$354.3 million. It is currently estimated that the Aripuan?? project, if and when it is fully developed and begins operation, could produce an annual average of approximately 51.0 thousand tonnes of zinc in concentrate, 20.0 thousand tonnes of lead in concentrate, 4.0 thousand tonnes of copper in concentrate, 1.0 million ounces of silver and 25.0 thousand ounces of gold over a 24-year life of mine.

Aripuan?? is an underground polymetallic project located in the State of Mato Grosso, Brazil, exhibiting characteristics of a Volcanogenic Massive Sulfide, or VMS, deposit similar to those found at Cerro Lindo. During 2016 and 2017, the Worley Parsons Company was engaged to develop a conceptual engineering study on development of an operation with 5,000 tpd ore mining and processing capacity. The environmental impact study for this project has been submitted to the SEMA/MT and is expected to be in its approval phase by the second quarter of 2018.

Outlook

Mineral exploration activities continue to identify mineralized deposits in the Aripuan?? project. The results from these activities indicate there is the potential to increase the mineral resources in the Aripuan?? project, supporting continued investment in mineral exploration activities in the project. In particular, the large resource base in the project indicates the potential for a long mine life of up to 24 years. Exploration has identified incremental resource expansion at Arex, Link, Ambrex and Baba??u. In order to execute this expansion, a 15,000 meter drill program is planned in 2017 focused on resource growth. Geological mapping and preliminary exploration activities have helped identify additional, potentially mineralized bodies at Massaranduba, Boroca, Mocoto and Arpa. It may also be possible to selectively mine areas containing high-grade ore during the early years of the life of mine to improve capital returns. It is intended that trade-off studies will be carried out related to the mineral process in order to better identify the potential of the Aripuan?? project.

About Karmin

The common shares of Karmin are listed on the TSX Venture Exchange and the Lima Stock Exchange and trade in both markets under the symbol "KAR". The principal business of Karmin is to acquire, explore and develop resource properties.

Aripuan??

Aripuan?? covers an 820 square kilometre mineralized massive-sulphide district that includes five areas of mineralization (Ambrex, Arex, Babacu, Massaranduba and Mocoto) over a 25-kilometre strike length. Votorantim owns the remaining 70% of Aripuan?? but is responsible for 100% of the project costs until 12 months after the completion of a feasibility study.

The summary of the resource estimate at Aripuan?? is outlined in Table 1. This summary is detailed in the PEA prepared by RPA Inc. which conforms to NI 43-101 Standards of Disclosure for Mineral Projects and is dated July 31, 2017.To the best of the Karmin's knowledge, information, and belief, there is no new material scientific or technical information that would make the results of the PEA inaccurate or misleading.The PEA is preliminary in nature and includes Inferred Mineral Resources that are too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves.There is no certainty that PEA results will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

TABLE 1SUMMARY OF MINERAL RESOURCES - ARIPUAN??

December 23, 2016
GradeContained Metal
Tonnage Zn Pb Cu Au Ag Zn Pb Cu Au Ag
Mt% % % g/t g/t M lb M lb M lb K Oz M Oz
Stratabound
Measured8.65.88 2.16 0.19 0.23 52.65 1,109.0 407.1 36.0 64.2 14.5
Indicated9.85.38 2.03 0.09 0.25 47.83 1,160.8 437.2 18.7 79.5 15.0
Measured and Indicated 18.35.61 2.09 0.14 0.24 50.08 2,269.9 844.3 54.7 143.7 29.5
Inferred13.27.20 2.80 0.10 0.38 62.50 2,099.7 815.4 29.4 162.7 26.6
Stringer
Measured2.30.28 0.12 1.54 1.18 17.61 14.4 6.3 78.5 87.8 1.3
Indicated1.20.11 0.05 0.97 1.28 11.21 2.7 1.4 24.5 47.5 0.4
Measured and Indicated3.50.22 0.10 1.35 1.21 15.49 17.2 7.7 103.1 135.3 1.7
Inferred11.40.08 0.05 0.78 1.55 9.31 19.3 13.5 197.0 569.7 3.4
Total
Measured10.94.68 1.72 0.48 0.43 45.18 1,123.5 413.5 114.6 152.0 15.8
Indicated10.94.83 1.82 0.18 0.36 43.97 1,163.6 438.6 43.2 127.0 15.5
Measured and Indicated21.84.76 1.77 0.33 0.40 44.58 2,287.0 852.0 157.8 279.0 31.3
Inferred24.63.90 1.53 0.42 0.93 37.88 2,119.0 829.0 226.4 732.4 30.0

Notes:

  1. CIM definitions were followed for Mineral Resources.
  2. Mineral Resources are reported using a US$46/t Net Smelter Return (NSR) block cut-off value for stratabound material and a US$42/t Net Smelter Return (NSR) block cut-off value for stringer material.
  3. The NSR is calculated based on US$1.26 per lb Zn, US$1.01 per lb Pb, US$3.08 per lb Cu, US$1,471 per ounce Au, and US$21.80 per ounce Ag.
  4. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
  5. Numbers may not add due to rounding.

Other Assets

Karmin also owns 100% of the Aripuan?? Gold Project, which encompasses the gold and silver mineralization associated with near-surface oxidized portions of numerous massive sulphide deposits in the 820 square kilometre Aripuan?? Zinc Project in north-western Brazil.

Karmin owns 100% of the 25 square-kilometre Cushuro Gold Project located in the world-class Alto Chicama gold-mining district of northern Peru.

Qualified Person

The technical information disclosed in this press release has been reviewed by Mr. Jason J. Cox P.Eng., an employee of RPA and independent of Karmin. Mr. Jason J. Cox P.Eng. has read and approved the contents of this press release as it pertains to the disclosed technical information.

For further information please contact:

David Brace

Chief Executive Officer

Email: davidbrace@karmin.com

Tel: (416) 367-0369
or John Iannozzi

Chief Financial Officer

Email: johni@karmin.com

Tel: (519) 337-5302

Disclaimer Relating to Forward-Looking Information

This news release contains forward-looking statements that are based on the belief of management and reflect Karmin's current expectations. Forward-looking statements include, but are not limited to, possible events and statements. The words "potential," "possible," "expects," "plans," "scheduled," "estimates," "anticipates" or "believes," or variations of such words and phrases or statements that certain actions, events or results "may," "could," "would," "might," or "will" be taken or occur, and similar expressions identify forward-looking statements.The forward-looking statements and information in this press release include, but are not limited to the mineral resource estimates and the business plans of Karmin. Such statements and information reflect the current view of Karmin with respect to risks and uncertainties that may cause actual results to differ materially from those contemplated in those forward-looking statements and information.

Such statements are not historical facts. Readers are cautioned not to place undue reliance on forward-looking statements, as there can be no assurance that the plans, intentions or expectations upon which they are based will occur. By their nature, forward-looking statements involve numerous assumptions, known and unknown risks and uncertainties, both general and specific, that contribute to the possibility that the predictions, forecasts, projections in the forward-looking statements will not occur, and that actual performance and results in future periods may differ materially from any estimates or projections of future performance or results expressed or implied by such forward-looking statements.

The Aripuan?? Zinc-Lead-Silver Project and the land it relates to is an exploration property only. Accordingly, there are a number of important factors that could cause Karmin's actual results to differ materially from those indicated or implied by forward-looking statements and information. Such factors relating to the Aripuan?? Zinc-Lead-Silver Project include, among others, the timing and content of work programs, results of the development of mineral properties, the interpretation of drilling results and other geological data, the uncertainties of resource and reserve estimates, receipt and security of mineral property titles, receipt of licenses to conduct mining activities, project cost overruns or unanticipated costs and expenses, fluctuations in metal prices and general market and industry conditions, changes in national and local government legislation, taxation, controls, policies and regulations, the security of personnel and assets, and political or economic developments in Canada and Brazil, operating or technical difficulties in connection with mining or development activities, employee relations, the speculative nature of mineral exploration and development and the risks and hazards associated with the business of mineral exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding.

The forward-looking statements contained in this news release are made as of the date of this news release. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. Except as required by law, Karmin disclaims any intention and assumes no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise. Additionally, Karmin undertakes no obligation to comment on the expectations of, or statements made by, third parties in respect of the matters discussed above.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok