Marathon Gold Announces Recommencement of Valentine Gold Project Exploration

2020-06-09 / @nasdaq

 

TORONTO, June 09, 2020 (GLOBE NEWSWIRE) -- Marathon Gold Corporation (“Marathon” or the “Company”; TSX: MOZ) is pleased to announce the recommencement of exploration activities at its Valentine Gold Project exploration camp in central Newfoundland. This follows the successful move to the COVID-19 “Alert Level 3” announced by the Newfoundland and Labrador Department of Health and Community Services on June 8, 2020.

Marathon intends to recommence site activities in a staged approach, beginning with one drill rig and support functions and moving to three drill rigs over the coming weeks. Enhanced safety protocols for site access as well as camp and field-based activities have been established, and camp facilities will be expanded to allow for dedicated accommodation for each employee supported by additional housekeeping staff. As of June 8, Newfoundland and Labrador had experienced a total of 261 cases of COVD-19 infection. Two active cases are currently reported in the province, with no new cases having been reported over the previous 11 day period.

As of March 14, 2020, when the Valentine camp was closed, Marathon had completed approximately 9,500 metres of exploration drilling from a planned 2020 program of 44,000 metres budgeted at C$8.9 million (Marathon news release dated February 3, 2020). This included approximately 5,000 metres in 24 drill holes out of a planned 32,000 metres within the 6 kilometre long Sprite Corridor located between the Leprechaun and Marathon Deposits (Figure 1). This corridor includes the promising new “Berry Zone” where winter drilling confirmed the presence of characteristic “Main Zone”-type Quartz-Tourmaline-Pyrite-Gold (“QTP-Au”) vein mineralization over multiple sections.

The immediate priority of the renewed drill program will be a return to the Berry Zone, followed by step out holes northeastwards along the trace of the adjacent Valentine Lake Shear Zone towards the Frozen Ear Pond (“FEP”) Road (Figure 2). Once completed, step-out drilling will be extended northeastwards for the first time from the FEP Road to the southwest margin of the Marathon Deposit, a 1.5 kilometre interval of high exploration potential that has never been drilled. Once completed, this program will give: (1) an indication of the opportunity for future open pittable mineral resources in close proximity to the proposed Valentine Gold Project mill; (2) the lateral extent of Main Zone-type gold mineralization at Berry; and (3) the southwestwards extent of mineralization at the Marathon Deposit.

The 2020 exploration program also included 12,000 metres of exploration drilling in two areas located south of the Valentine Lake Shear Zone in footwall meta-sedimentary rocks that have not previously been drilled (Figure 1). Widely spaced drill holes in these areas will test the potential for economic occurrences of gold mineralization extending into footwall rocks, potentially associated with structures secondary to the main Valentine Lake Shear Zone. As of March 14, 2020, approximately 4,500 metres in 33 drill holes had been completed in Footwall Area 1. These two footwall areas also represent the expected sites for the Leprechaun Open Pit waste rock storage area, the main tailings storage facility, and the mill. As such, drilling here will serve the separate purpose of site condemnation. An additional approximately 3,000 metres of condemnation drilling has already been completed in the proposed area of the Marathon Open Pit waste rock storage area.

In addition to the exploration and site condemnation drilling, Marathon will conduct geotechnical and hydrogeological drill programs focussed on the Leprechaun and Marathon pit areas and site-wide major-facility locations such as the mill and the proposed tailings storage facility. These programs are in support of ongoing Feasibility-level engineering studies. Additional site activities will include continued environmental baseline studies, prospecting, and trenching.

Figure 1: Priority Areas for 2020 Exploration Drilling, Valentine Gold Project
https://www.globenewswire.com/NewsRoom/AttachmentNg/ac23a3e5-7fcb-42ee-8c20-4199938d6a9e

Figure 2: Upcoming drill holes in the Berry Zone to FEP Road area, Valentine Gold Project
https://www.globenewswire.com/NewsRoom/AttachmentNg/ff9c0cbb-cfc4-44c0-808f-144de9ae3ef4

Qualified Person

Disclosure of a scientific or technical nature in this news release was prepared under the supervision of Nicholas Capps, P.Geo. (NL), Project Manager for exploration at the Valentine Gold Project and a qualified person under National Instrument (“NI”) 43-101.

Acknowledgments

Marathon acknowledges the financial support of the Junior Exploration Assistance Program, Department of Natural Resources, Government of Newfoundland and Labrador.

About Marathon

Marathon (TSX:MOZ) is a Toronto based gold company advancing its 100%-owned Valentine Gold Project located in central Newfoundland, one of the top mining jurisdictions in the world. The Project comprises a series of four mineralized deposits along a 20-kilometre system. An April 2020 Pre-Feasibility Study outlined an open pit mining and conventional milling operation over a twelve-year mine life with a 36% after-tax rate of return. The Project has estimated Proven Mineral Reserves of 1.3 Moz (26.3 Mt at 1.52 g/t) and Probable Mineral Reserves of 0.6 Moz (14.8 Mt at 1.23 g/t). Total Measured Mineral Resources (inclusive of the Mineral Reserves) comprise 1.9 Moz (31.7 Mt at 1.86 g/t) with Indicated Mineral Resources (inclusive of the Mineral Reserves) of 1.19 Moz (23.2 Mt at 1.60 g/t). Additional Inferred Mineral Resources are 0.96 Moz (16.77 Mt at 1.78 g/t Au). Please see the Technical Report dated April 21, 2020 for further details and assumptions relating to the Valentine Gold Project.

For more information, please contact:

Matt Manson
President & CEO
Tel: 416 987-0711
mmanson@marathon-gold.com
Hannes Portmann
CFO & Business Development
Tel: 416 855-8200
hportmann@marathon-gold.com
Amanda Mallough
Senior Associate, Investor Relations
Tel: 416 855-8202
amallough@marathon-gold.com

To find out more information on Marathon Gold Corporation and the Valentine Gold Project, please visit www.marathon-gold.com.

Cautionary Statement Regarding Forward-Looking Information

Certain information contained in this news release, constitutes forward-looking information within the meaning of Canadian securities laws (“forward-looking statements”). All statements in this news release, other than statements of historical fact, which address events, results, outcomes or developments that Marathon expects to occur are forward-looking statements. Forward-looking statements include statements that are predictive in nature, depend upon or refer to future events or conditions, or include words such as “expects”, “anticipates”, “plans”, “believes”, “estimates”, “considers”, “intends”, “targets”, or negative versions thereof and other similar expressions, or future or conditional verbs such as “may”, “will”, “should”, “would” and “could”. We provide forward-looking statements for the purpose of conveying information about our current expectations and plans relating to the future, and readers are cautioned that such statements may not be appropriate for other purposes. More particularly and without restriction, this news release contains forward-looking statements and information about Marathon’s intention to complete the Offering and the timing thereof, economic analyses for the Valentine Gold Project, capital and operating costs, processing and recovery estimates and strategies, future exploration and mine plans, objectives and expectations and corporate planning of Marathon, future feasibility studies and environmental impact statements and the timetable for completion and content thereof and statements as to management's expectations with respect to, among other things, the matters and activities contemplated in this news release. 

Forward-looking statements involve known and unknown risks, uncertainties and assumptions and accordingly, actual results and future events could differ materially from those expressed or implied in such statements. You are hence cautioned not to place undue reliance on forward-looking statements. A mineral resource that is classified as “inferred” or “indicated” has a great amount of uncertainty as to its existence and economic and legal feasibility. It cannot be assumed that any or part of an “indicated mineral resource” or “inferred mineral resource” will ever be upgraded to a higher category of mineral resource. Investors are cautioned not to assume that all or any part of mineral deposits in these categories will ever be converted into proven and probable mineral reserves.

By its nature, this information is subject to inherent risks and uncertainties that may be general or specific and which give rise to the possibility that expectations, forecasts, predictions, projections or conclusions will not prove to be accurate, that assumptions may not be correct and that objectives, strategic goals and priorities will not be achieved. Factors that could cause future results or events to differ materially from current expectations expressed or implied by the forward-looking statements include receipt of all necessary regulatory approvals, completion of all conditions to closing of the Offering, availability of financing to fund Marathon’s exploration and development activities, the ability of the current exploration program to identify and expand mineral resources, operational risks in exploration and development for gold, Marathon’s ability to realize the pre-feasibility study, delays or changes in plans with respect to exploration or development projects or capital expenditures, uncertainty as to calculation of mineral resources, changes in commodity and power prices, changes in interest and currency exchange rates, the ability to attract and retain qualified personnel, inaccurate geological and metallurgical assumptions (including with respect to the size, grade and recoverability of mineral resources), changes in development or mining plans due to changes in logistical, technical or other factors, title defects, government approvals and permits, cost escalation, changes in general economic conditions or conditions in the financial markets, environmental regulation, operating hazards and risks, delays, taxation rules, competition, public health crises such as the COVID-19 pandemic and other uninsurable risks, liquidity risk, share price volatility, dilution and future sales of common shares, aboriginal claims and consultation, cybersecurity threats, climate change, delays and other risks described in Marathon’s documents filed with Canadian securities regulatory authorities.

You can find further information with respect to these and other risks in Marathon’s Amended and Restated Annual Information Form for the year ended December 31, 2019 and other filings made with Canadian securities regulatory authorities available at www.sedar.com. Other than as specifically required by law, Marathon undertakes no obligation to update any forward-looking statement to reflect events or circumstances after the date on which such statement is made, or to reflect the occurrence of unanticipated events, whether as a result of new information, future events or results otherwise.

Primary Logo

Figure 1

Priority Areas for 2020 Exploration Drilling, Valentine Gold Project
Figure 2

Upcoming drill holes in the Berry Zone to FEP Road area, Valentine Gold Project

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok