TORONTO, Feb. 21, 2019 (GLOBE NEWSWIRE) -- Marathon Gold Corporation (“Marathon” or the “Company”) (TSX: MOZ) is excited to announce that it has closed the sale of a 2% net smelter returns royalty (the “NSR”) to Franco-Nevada Corporation (“Franco-Nevada”) (TSX, NYSE: FNV) linked to production at the Valentine Lake Gold Camp in central Newfoundland, for gross proceeds of CAD $18,000,000. The NSR applies to the entire Valentine Lake property and covers the sales of precious and base metals and minerals. Marathon has an option to buy back 0.5% of the NSR for US $7 million until December 31, 2022.
“Franco-Nevada's purchase of the NSR is a major endorsement of the Valentine Lake project by one of the best-known and regarded public royalty companies," said Phillip Walford, President and CEO of Marathon. “The proceeds from this strategic financing transaction will allow Marathon to fast-track the completion of the Prefeasibility Study in 2019."
Use of Proceeds:
About Marathon
Marathon is a Toronto based gold exploration company rapidly advancing its 100% owned Valentine Lake Gold Camp located in Newfoundland and Labrador, one of the top mining jurisdictions in the world. The Valentine Lake Gold Camp currently hosts four near-surface, mainly pit-shell constrained, deposits with measured and indicated resources totaling 2,691,400 oz. of gold at 1.85 g/t and inferred resources totaling 1,531,600 oz. of gold at 1.77 g/t. The majority of the resources occur in the Marathon and Leprechaun deposits, which also have resources below the current open pit shell. Both deposits are open to depth and on strike. Gold mineralization has been traced down over 350 meters vertically at Leprechaun and almost a kilometer at Marathon. The four deposits identified to date occur over a 20-kilometer system of gold bearing veins, with much of the 24,000-hectare property having had only minimal exploration activity to date.
The Valentine Lake Gold Camp is accessible by year-round road and is in close proximity to the provincial electrical grid. Marathon maintains a 50-person all-season camp at the property. Recent metallurgical tests have demonstrated 93% to 98% recoveries via conventional milling and 50% to 70% recoveries via low-cost heap leaching at both the Leprechaun and Marathon Deposits.
To find out more information on the Valentine Lake Gold Camp please visit www.marathon-gold.com
For more information, please contact:
Phillip Walford | Christopher Haldane |
President and Chief Executive Officer | Investor Relations Manager |
Tel: 1-416-987-0711 | Tel: 1-416-987-0714 |
E-mail: pwalford@marathon-gold.com | E-mail: chaldane@marathon-gold.com |
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION
Except for statements of historical fact relating to Marathon Gold Corporation, certain information contained herein constitutes "forward-looking statements". Forward-looking statements include statements that are predictive in nature, depend upon or refer to future events or conditions, or include words such as "expects", "anticipates", "plans", "believes", "considers", "intends", "targets", or negative versions thereof and other similar expressions, or future or conditional verbs such as "may", "will", "should", "would" and "could". We provide forward-looking statements for the purpose of conveying information about our current expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate for other purposes. By its nature, this information is subject to inherent risks and uncertainties that may be general or specific and which give rise to the possibility that expectations, forecasts, predictions, projections or conclusions will not prove to be accurate, that assumptions may not be correct, and that objectives, strategic goals and priorities will not be achieved. These risks and uncertainties include but are not limited to those identified and reported in Marathon Gold Corporation's public filings, which may be accessed at www.sedar.com. Other than as specifically required by law, we undertake no obligation to update any forward-looking statement to reflect events or circumstances after the date on which such statement is made, or to reflect the occurrence of unanticipated events, whether as a result of new information, future events, results or otherwise.