TORONTO, March 16, 2020 (GLOBE NEWSWIRE) -- McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) today reported fourth quarter and full year results for the period ended December 31, 2019.
Operations Update
San José Mine, Argentina (49% Interest)
Our attributable production from San José in 2019 was 51,684 gold ounces and 3,354,487 silver ounces, for a total of 91,654 GEOs. Compared to 2018, gold and silver production increased 9% and 11%, respectively, primarily due to approximately 10% higher average metal grades of processed ore. For 2019, total cash costs(2) and all-in sustaining costs (AISC)(2) were $867 and $1,140 per GEO, respectively. During 2019, we received $8.9 million in dividends from our interest in San José, compared to $10.4 million in dividends received during 2018.
Production guidance for 2020 on a 49% basis is 45,700 gold ounces and 3,200,000 silver ounces, for a total of 82,000 GEOs. For 2020, cash costs and AISC are projected to be between $950-$1,000 and $1,200-$1,250 per GEO, respectively.
In addition to exploration drilling at the mine itself, exploration of the San José land package is planned to include a Titan deep penetrating geophysical survey, drilling at the Telken target close to Newmont’s Cerro Negro mine, and an assessment of other regional opportunities in the southern part of the property.
The mineral resource and reserve estimates for the San José mine have been updated (Tables 1.1 and 1.2) to reflect mine depletion and additions from exploration.
Black Fox Mine, Canada (100% Interest)
Production from Black Fox in 2019 was 35,721 GEOs. Compared to 2018, gold production decreased by 27%, due to operational challenges in the year and depleting reserves. For 2019, total cash costs and AISC were $825 and $1,225 per GEO, respectively.
Our exploration activities during 2019 included 489,000 feet (149,000 m) of surface-staged diamond drilling, and 57,000 feet (17,500 m) of underground-based exploration drilling. We invested $25.5 million in 2019 on exploration across the Black Fox Complex, compared to $22.0 million in 2018.
Development of underground access to the Froome ore body, located approximately 3,000 ft (900 m) away from the Black Fox open pit, commenced in December 2019. Mining from Froome is scheduled to begin in Q4 2021, and continue to 2023.
A feasibility study examining the development of the Grey Fox deposit by open pit mining methods is being started, and is expected to be complete in Q4 2020. Additionally, to further expand future production potential, we are considering dewatering the Stock Mine to enable us to drill the Stock West discovery and the depth extension of the mine from underground.
Production guidance for 2020 is 35,000-40,000 GEOs at cash costs and AISC of between $1,000-$1,150 and $1,150-$1,250 per GEO, respectively. Higher cash costs reflect the impact of development and related costs being expensed over the short mine life.
The mineral resource and reserve estimates for the Black Fox mine have been updated (Tables 2.1 to 2.4) to reflect mine depletion, additions from exploration, and the deletion of certain resource blocks that are deemed inaccessible due to prior mining activity. The mineral resource for the Stock East and Grey Fox projects were updated and increased.
Gold Bar Mine, USA (100% Interest)
Gold Bar produced 30,712 GEOs in 2019. The ramp-up to commercial production saw delays that adversely impacted our gold production in the first half of 2019. Gold Bar production increased during Q3, while production in Q4 was impacted by lower throughput at the crushing plant and lower grades as mining transitioned to the Gold Pick West open pit. In 2019, cash costs and AISC were $1,101 and $1,282 per GEO, respectively.
With respect to our operational experience at Gold Bar, the majority of material mined during 2019 was from the Cabin Creek pits, which has reconciled positively to our block model for both gold grade (+18%) and contained gold ounces (+8%), but negatively for ore tons (-8%). The recent transition to mining from the Gold Pick West pit has returned lower ore tons, gold grade and contained ounces from the upper benches as compared to the block model. This appears to be due to greater structural control of the mineralization than was previously expected, but which is now exposed in the newly developed pit. In light of the significant differences recently observed between the modeled (expected) and mined (actual) ore tonnage and gold grade from the Gold Pick West pit, the reserve estimate for the Gold Pick deposit as at December 31, 2018 and the future mine plan is being evaluated.
Remodeling of the Gold Pick deposit is underway by independent engineers and preliminary iterations suggest that a significant reduction in ore tonnage, partially offset by an increase in ore grade, and a resulting significant reduction in contained gold ounces from the 2018 reserve estimate is likely.
The impact on our operations for 2020 is that we expect to place fewer gold ounces than originally planned on the heap leach pad, reducing our planned production for the year.
We will publish the revised mineral reserve estimate as soon as it is completed, and a new mine plan, if necessary, will be implemented thereafter. At this time, we do not have sufficient information to provide accurate 2020 production or cost guidance for Gold Bar.
In 2019, we spent $7.2 million on exploration activities at the Gold Bar Complex, compared to $5.2 million spent in 2018. The mineral resource estimate for the Gold Bar South satellite deposit has been updated (Table 3.1).
We are working to complete the permitting and engineering work required to bring Gold Bar South into the mine plan. Additional drilling is planned over the north and south extensions of the deposit, which remain open.
El Gallo Project, Mexico (100% Interest)
Production from El Gallo in 2019 was 16,333 GEOs from residual leaching of the heap leach pad. Beginning with Q4 2019, we have ceased relying on, and disclosing, cash costs and AISC per GEO as key metrics for El Gallo because those measures include the expensing of accumulated heap leach pad inventory costs, which are not informative when accessing the current economics of residual leaching. We estimate that residual leaching will continue for as long as incremental revenue exceeds incremental costs. During 2019, residual leaching costs were $11.6 million, or $688 per GEO sold.
For 2020, we expect to recover 12,000 GEOs from residual leaching of the heap leach pad.
Table 1 below provides production and cost results for Q4 and the full year 2019, with comparative results from 2018.
Q4 | Full Year | 2019 Revised Guidance | |||
2018 | 2019 | 2018 | 2019 | ||
Consolidated Production | |||||
Gold (oz) | 29,369 | 36,119 | 135,203 | 134,315 | 131,000-138,000 |
Silver (oz) | 819,439 | 864,957 | 3,032,694 | 3,365,846 | 3,225,000 |
GEOs(1) | 40,296 | 46,295 | 175,640 | 174,420 | 169,000-176,000 |
Gold Bar Mine, Nevada(3) | |||||
GEOs(1) | - | 9,713 | - | 30,712 | 30,000-33,000 |
Cash Costs ($/GEO)(1) | - | 1,281 | - | 1,101 | 1,000-1,050 |
AISC ($/GEO)(1) | - | 1,452 | - | 1,282 | 1,200-1,300 |
Black Fox Mine, Canada | |||||
GEOs(1) | 11,177 | 9,921 | 48,928 | 35,721 | 36,000-40,000 |
Cash Costs ($/GEO)(1) | 864 | 729 | 845 | 825 | 905 |
AISC ($/GEO)(1) | 1,074 | 934 | 1,137 | 1,225 | 1,250-1,300 |
El Gallo Mine, Mexico | |||||
GEOs(1) | 5,632 | 2,490 | 39,105 | 16,333 | 16,000 |
Cash Costs ($/GEO)(1) | 849 | (5) | 733 | (5) | 875 |
AISC ($/GEO)(1) | 877 | (5) | 771 | (5) | 915 |
San José Mine, Argentina (49%) | |||||
Gold production (oz)(4) | 12,602 | 14,032 | 47,331 | 51,684 | 49,000 |
Silver production (oz)(4) | 816,347 | 861,841 | 3,020,696 | 3,354,487 | 3,225,000 |
GEOs(1)(4) | 23,487 | 24,171 | 87,607 | 91,654 | 87,000 |
Cash Costs ($/GEO)(1) | 817 | 826 | 851 | 867 | 860 |
AISC ($/GEO)(1) | 1,013 | 1,034 | 1,061 | 1,140 | 1,120 |
Table 2 below provides financial highlights for Q4 and full year 2019, with comparative results from 2018.
Q4 2018 | Q4 2019 | Full Year 2018 | Full Year 2019 | |||||
Treasury | ||||||||
Liquid Assets ($ millions)(2) | 37.8 | 49.7 | ||||||
Cash ($ millions) | 15.8 | 46.5 | ||||||
Working Capital ($ millions) | 23.4 | 43.2 | ||||||
Debt (Term loan) ($ millions) | 50.0 | 50.0 | ||||||
Gross Profit (Loss) | ||||||||
Black Fox Mine ($ millions) | (0.3 | ) | 4.1 | 6.0 | 5.7 | |||
San José Mine (49%) ($ millions) | 1.8 | 6.9 | 4.5 | 16.6 | ||||
El Gallo Project ($ millions) | 3.0 | (0.5 | ) | 26.1 | 4.0 | |||
Gold Bar Mine ($ millions) | - | (2.3 | ) | - | (0.7 | ) | ||
Cash Gross Profit (Loss) | ||||||||
Black Fox Mine ($ millions) | 4.2 | 6.8 | 18.9 | 18.9 | ||||
San José Mine (49%) ($ millions) | 8.9 | 16.7 | 30.0 | 50.9 | ||||
El Gallo Project ($ millions) | 3.3 | (0.4 | ) | 28.2 | 4.6 | |||
Gold Bar Mine ($ millions) | - | 2.1 | - | 10.2 | ||||
Consolidated Operating Results | ||||||||
Net (Loss) ($ millions) | (21.0 | ) | (25.1 | ) | (44.9 | ) | (59.7 | ) |
Net (Loss) per Share ($) | (0.06 | ) | (0.07 | ) | (0.13 | ) | (0.17 | ) |
Cash Flow | ||||||||
Cash Provided By (Used In) Operating Activities ($ millions) | 1.3 | (17.6 | ) | 0.5 | (39.5 | ) |
Notes:
For the SEC Form 10-Q Financial Statements and MD&A refer to: http://www.sec.gov/cgi-bin/browse-edgar?action=getcompany&CIK=0000314203
Conference Call and Webcast
We invite you to join our conference call, where management will discuss our 2019 financial results and project developments and follow with a question and answer session. Questions can be asked directly by participants during the webcast. The webcast will be archived on McEwen Mining’s website following the call.
Tuesday, March 17th, 2020 at 2:00 p.m. EDT | Toll Free (US & Canada): | 1 (866) 211-4128 |
Outside US & Canada: | 1 (647) 689-6724 | |
Conference ID Number: | 3479013 | |
Webcast Link: | https://event.on24.com/wcc/r/2208781/05022E7D0226B7520D1EC5530FCA4A1C |
Resource and Reserve Updates
Mineral resources have been updated for the Gold Bar South (Nevada), Stock and Grey Fox Projects (Ontario), and resources and reserves have been updated for the Black Fox Mine (Ontario), and San José Mine (Argentina). For a summary of all McEwen Mining’s resources and reserves refer to the tables on our website.
The following statements apply to information contained in the resource and reserve tables below:
San José Mine Resource and Reserve Update
Hochschild Mining Plc (“Hochschild”), our joint venture partner, prepared the mineral resource and mineral reserve estimates for the San José mine as at December 31, 2019.
These figures, reported on a 100% basis, were prepared by Hochschild and audited by P&E Mining Consultants Inc. whose audit letter dated February 10, 2020, concluded that the estimates for the San José mine prepared by Hochschild at December 31, 2019 provide a reliable estimation of reserves and resources. The reserves as presented are in-situ and include mining dilution and mining losses, however they do not include allowances for mill or smelter recoveries.
Table 1.1: San José Mine - Mineral Reserve Estimate, December 31, 2019 – 100% basis
Classification | Quantity (‘000 t) | Gold Grade (g/t) | Silver Grade (g/t) | Contained Gold (‘000 oz) | Contained Silver (M oz) |
Proven | 783 | 7.75 | 489 | 195 | 12.3 |
Probable | 247 | 5.78 | 363 | 46 | 2.9 |
Total Proven & Probable | 1,030 | 7.28 | 459 | 241 | 15.2 |
Table 1.2: San José Mine - Mineral Resource Estimate, December 31, 2019 – 100% basis
Classification | Quantity (‘000 t) | Gold Grade (g/t) | Silver Grade (g/t) | Contained Gold (‘000 oz) | Contained Silver (M oz) |
Measured | 1,564 | 8.59 | 537 | 432 | 27.0 |
Indicated | 987 | 6.04 | 364 | 192 | 11.6 |
Total Measured & Indicated | 2,551 | 7.61 | 470 | 624 | 38.6 |
Total Inferred | 1,776 | 5.62 | 356 | 321 | 20.3 |
Table 1.1 and 1.2 Notes:
Black Fox Complex Resource and Reserve Updates
The mineral resource estimate for the Black Fox Mine and Grey Fox area was carried out by McEwen Mining; the mineral reserve for the Black Fox Mine was developed by the site engineering team; the updating of the mineral resource for the Stock East Property was undertaken by consultants MICON International Ltd. All resource and reserve statements are as at December 31, 2019. Resource estimates for other deposits in the complex, including Froome and Tamarack, are unchanged.
Table 2.1: Black Fox Mine - Mineral Resource Estimate, December 31, 2019
Classification | Quantity (‘000 tonnes) | Grade Gold (g/t) | Contained Gold (‘000 oz) |
Measured | 241 | 7.83 | 61 |
Indicated | 809 | 7.48 | 195 |
Total Measured & Indicated | 1,051 | 7.56 | 255 |
Inferred | 51 | 7.32 | 12 |
Table 2.2: Black Fox Mine - Mineral Reserve Estimate, December 31, 2019
Classification | Quantity (‘000 tonnes) | Grade Gold (g/t) | Contained Gold (‘000 oz) |
Proven | 41 | 5.40 | 7 |
Probable | 304 | 5.78 | 56 |
Total Probable | 345 | 5.73 | 63 |
Table 2.1 and 2.2 Notes:
Table 2.3: Stock Property - Mineral Resource Estimate, January 26, 2020
Classification | Quantity (‘000 t) | Grade Gold (g/t) | Contained Gold (‘000 oz) | ||
Indicated Mineral Resource | |||||
Open Pit | East Zone | 2,049 | 1.26 | 83 | |
Underground | East Zone | 368 | 3.19 | 38 | |
Total Indicated | 2,417 | 1.55 | 121 |
Table 2.3 Notes:
Table 2.4: Grey Fox Property - Mineral Resource Estimate, December 31, 2019
Classification | Quantity (‘000 t) | Grade Gold (g/t) | Contained Gold (‘000 oz) | ||
Indicated Mineral Resource | |||||
Underground | Contact Zone | 770 | 6.48 | 160 | |
147 Zone | 1,253 | 8.05 | 324 | ||
147 NE Zone | 366 | 7.14 | 84 | ||
South Zone | 290 | 5.49 | 51 | ||
Total Indicated | 2,678 | 7.20 | 620 | ||
Inferred Mineral Resource | |||||
Underground | Contact Zone | 384 | 6.01 | 74 | |
147 Zone | 139 | 6.43 | 29 | ||
147 NE Zone | 92 | 7.69 | 23 | ||
South Zone | 44 | 5.46 | 8 | ||
Total Inferred | 659 | 6.30 | 133 |
Table 2.4 Notes:
Gold Bar South Resource Update
SRK Consulting (U.S.), Inc. developed the updated resource estimate in accordance with the requirements of NI 43-101. The resource estimate is comprised only of gold resources that fall inside the boundaries of a conceptual pit and the permitted mine area. Cut-off grades and inputs for the conceptual pit are provided in the footnotes of the resource statement.
Table 3.1: Gold Bar South - Mineral Resource Estimate (US Standard Units unless otherwise indicated), January 1, 2020
Classification | Quantity (‘000 ton) | Grade Gold (oz/ton) | Grade Gold (Metric g/t) | Contained Gold (‘000 oz) |
Measured | 812 | 0.036 | 1.23 | 29 |
Indicated | 1,252 | 0.028 | 0.97 | 35 |
Total Measured + Indicated | 2,064 | 0.031 | 1.07 | 64 |
Inferred | 430 | 0.021 | 0.72 | 9 |
Table 3.1 Notes:
Reliability of Information Regarding San José
Minera Santa Cruz S.A., the owner of the San José Mine, is responsible for and has supplied to the Company all reported results from the San José Mine. McEwen Mining’s joint venture partner, a subsidiary of Hochschild Mining plc, and its affiliates other than MSC do not accept responsibility for the use of project data or the adequacy or accuracy of this release.
Technical Information
The technical contents of this news release has been reviewed and approved by Chris Stewart, P.Eng., President & COO of McEwen Mining and a Qualified Person as defined by Canadian Securities Administrators National Instrument 43-101 "Standards of Disclosure for Mineral Projects."
The technical information in this news release related to resource and reserve estimates has been reviewed and approved by Luke Willis, P.Geo., McEwen Mining’s Director of Resource Modelling and Qualified Person as defined by Canadian Securities Administrators National Instrument 43-101 "Standards of Disclosure for Mineral Projects."
CAUTIONARY NOTE TO US INVESTORS REGARDING RESOURCE ESTIMATION
McEwen Mining Inc. is required to prepare reports under the Securities Exchange Act of 1934 and the Canadian Securities Administrators’ National Instrument 43‑101 “Standards of Disclosure for Mineral Projects” (“NI 43‑101”), under the Canadian securities laws because we are listed on the Toronto Stock Exchange (“TSX”) and subject to Canadian securities laws. Standards under NI 43-101 are materially different than the standards generally permitted in reports filed with the United States (“U.S.”) Securities and Exchange Commission (“SEC”).
Under NI 43‑101, we report measured, indicated and inferred resources, which are measurements that are generally not permitted in filings made with the SEC. The estimation of measured resources and indicated resources involve greater uncertainty as to their existence and economic feasibility than the estimation of proven and probable reserves under Industry Guide 7. U.S. investors are cautioned not to assume that any part of measured or indicated resources will ever be converted into economically mineable reserves. The estimation of inferred resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources. Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration. Therefore, U.S. investors are also cautioned not to assume that all or any part of inferred resources exist, or that they can be legally or economically mined.
Canadian regulations permit the disclosure of resources in terms of “contained ounces” provided that the tonnes and grade for each resource are also disclosed; however, the SEC only permits issuers to report “mineralized material” in tonnage and average grade without reference to contained ounces. Under U.S. regulations, the tonnage and average grade described herein would be characterized as mineralized material. We provide such disclosure about our properties to allow a means of comparing our projects to those of other companies in the mining industry, many of which are Canadian and report pursuant to NI 43‑101, and to comply with applicable disclosure requirements.
CAUTIONARY NOTE REGARDING NON-GAAP MEASURES
In this release, we have provided information prepared or calculated according to United States Generally Accepted Accounting Principles (“U.S. GAAP”), as well as provided some non-U.S. GAAP ("non-GAAP") performance measures. Because the non-GAAP performance measures do not have any standardized meaning prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other companies.
Cash Costs and All-in Sustaining Costs
Cash costs consist of mining, processing, on-site general and administrative costs, community and permitting costs related to current operations, royalty costs, refining and treatment charges (for both doré and concentrate products), sales costs, export taxes and operational stripping costs, and exclude depreciation and amortization. All-in sustaining costs consist of cash costs (as described above), plus accretion of retirement obligations and amortization of the asset retirement costs related to operating sites, sustaining exploration and development costs, sustaining capital expenditures, and sustaining lease payments. Both cash costs and all-in sustaining costs are divided by the gold equivalent ounces sold to determine cash costs and all-in sustaining costs on a per ounce basis. We use and report these measures to provide additional information regarding operational efficiencies on an individual mine basis, and believe that these measures provide investors and analysts with useful information about our underlying costs of operations. A reconciliation to production costs applicable to sales, the nearest U.S. GAAP measure is provided in McEwen Mining's Annual Report on Form 10-K for the year ended December 31, 2019.
Cash Gross Profit
Cash gross profit is a non-GAAP financial measure and does not have any standardized meaning. We use cash gross profit to evaluate our operating performance and ability to generate cash flow; we disclose cash gross profit as we believe this measure provides valuable assistance to investors and analysts in evaluating our ability to finance our ongoing business and capital activities. The most directly comparable measure prepared in accordance with GAAP is gross profit. Cash gross profit is calculated by adding depletion and depreciation to gross profit. A reconciliation to gross profit, the nearest U.S. GAAP measure is provided in McEwen Mining's Annual Report on Form 10-K for the year ended December 31, 2019.
Liquid assets
The term liquid assets used in this report is a non‑GAAP financial measure. We report this measure to better understand our liquidity in each reporting period. Liquid assets is calculated as the sum of the Balance Sheet line items of cash and cash equivalents, restricted cash and investments, plus ounces of doré held in precious metals inventories valued at the London PM Fix spot price at the corresponding period. A reconciliation to the nearest U.S. GAAP measure is provided in McEwen Mining's Annual Report on Form 10-K for the year ended December 31, 2019.
CAUTION CONCERNING FORWARD-LOOKING STATEMENTS
This news release contains certain forward-looking statements and information, including "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed, as at the date of this news release, McEwen Mining Inc.'s (the "Company") estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements and information are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, risks and contingencies, and there can be no assurance that such statements and information will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements and information. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements and information include, but are not limited to, factors associated with fluctuations in the market price of precious metals, mining industry risks, political, economic, social and security risks associated with foreign operations, the ability of the corporation to receive or receive in a timely manner permits or other approvals required in connection with operations, risks associated with the construction of mining operations and commencement of production and the projected costs thereof, risks related to litigation, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves, and other risks. Readers should not place undue reliance on forward-looking statements or information included herein, which speak only as of the date hereof. The Company undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See McEwen Mining's Annual Report on Form 10-K for the fiscal year ended December 31, 2019 and other filings with the Securities and Exchange Commission, under the caption "Risk Factors", for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information regarding the Company. All forward-looking statements and information made in this news release are qualified by this cautionary statement.
The NYSE and TSX have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by management of McEwen Mining Inc.
ABOUT MCEWEN MINING
McEwen Mining is a diversified gold and silver producer and explorer with operating mines in Nevada, Canada, Mexico and Argentina. It also owns a large copper deposit in Argentina. McEwen’s goal is to create a profitable gold and silver producer focused in the Americas.
McEwen has approximately 400 million shares outstanding. Rob McEwen, Chairman and Chief Owner, owns 20% of the shares.
CONTACT INFORMATION: | ||
Investor Relations: (866)-441-0690 Toll Free (647)-258-0395 Mihaela Iancu ext. 320 info@mcewenmining.com | Website: www.mcewenmining.com Facebook: facebook.com/mcewenmining Facebook: facebook.com/mcewenrob Twitter: twitter.com/mcewenmining Twitter: twitter.com/robmcewenmux Instagram: instagram.com/mcewenmining | 150 King Street West Suite 2800, P.O. Box 24 Toronto, ON, Canada M5H 1J9 |