Minaurum Resumes Phase II Drilling at Alamos Silver Project

2021-06-08 / @newsfile

 

Vancouver, British Columbia--(Newsfile Corp. - June 8, 2021) - Minaurum Gold, Inc (TSXV: MGG) (OTCQX: MMRGF) ("Minaurum") is pleased to report that it has begun mobilizing drill rigs to its high-grade Alamos Silver project in southern Sonora, Mexico. Phase II drilling began in July 2020 and 40 holes were drilled before pausing in December 2020 due to the COVID-19 pandemic in the region. With Covid cases dropping, Minaurum has begun mobilizing rigs to the project and anticipates drilling at least a further 15,000 metres.

Drilling will focus on defining emerging silver shoots in previously explored veins as well as discovering new shoots in underexplored veins. Drill targets will be 100- to 150-metre step-outs of, up- and down-dip, and along-strike of mineralized vein zones, with allowances made for plunging shoots. Minaurum is also continuing reconnaissance work to the south and west in the Alamos project to develop new target veins for later drilling.

"We have taken advantage of our COVID-19 recess to refine and refocus our exploration of the more than 26 veins we have identified in this historic camp," said Dr. Peter Megaw, Director of Minaurum Gold. "As we resume drilling, we will be testing a mixture of new veins and follow-up drilling of the mineralized shoots emerging in veins we've already begun exploring."

Table 1 summarizes some of the high-grade intercepts from initial Phase II drilling to be offset first (see Minaurum news releases dated September 24 and October 13, 2020; and February 9, 2021).

Table 1. Summary of initial Phase II drilling intercepts

Vein/target areaComment
Europa - Guadalupe3.50 m of 404 g/t Ag, 0.54% Cu, 1.30% Pb, 1.81% Zn, including 1.15 m of 999 g/t Ag, 1.29% Cu, 2.98% Pb, 2.98% Zn in hole AL20-042

6.35 m of 356 g/t Ag, 0.39% Cu, 0.42% Pb, 0.57% Zn, including 0.70 m of 2090 g/t Ag, 1.98% Cu, 2.51% Pb, 2.43% Zn in hole AL20-047

3.85 m @ 342 g/t Ag, 0.76% Cu, 1.03% Zn; including 0.80 m @ 1,185 g/t Ag, 2.19% Cu, 1.2% Zn in hole AL20-054

3.25 m @ 196 g/t Ag, 0.26% Cu, 0.35% Pb, 1.10% Zn including 0.55 m @ 784 g/t Ag, 1.05% Cu, and 2.49% Zn in hole AL20-050

Promontorio5.1 m of 769 g/t Ag, 0.76% Cu; including 3.1 m of 1,197 g/t Ag, 1.38% Cu in hole AL20-046

2.9 m of 636 g/t Ag, 1.36% Cu, 3.85% Pb, 7.18% Zn
in hole AL20-044

1.75 m of 144 g/t Ag, 4.15% Pb, 9.10% Zn in hole AL20-043

3.70 m @ 528 g/t Ag
, 0.8 g/t Au, 0.83% Cu, 2.43% Pb, 1.47% Zn, including 1.05 m @ 1,203 g/t Ag, 2.45 g/t Au, 1.42% Cu, 5.08% Pb, 2.80% Zn in Hole AL20-064

4.00 m @ 161 g/t Ag
, 0.5 g/t Au, 0.24% Cu, 2.15% Pb, 5.92% Zn, including 1.00 m @ 327 g/t Ag, 0.9 g/t Au, 0.23% Cu, 2.53% Pb, 6.62% Zn in Hole AL20-069

San Jose4.45 m @ 314 g/t Ag, 0.27% Cu, 0.19% Pb, 0.2% Zn in hole AL20-066

2.15 m @ 460 g/t Ag, 0.15% Cu, 0.47% Pb, 0.85% Zn
in hole AL20-075

Travesia4.40 m @ 210 g/t Ag, 0.59% Cu, 1.28% Pb, 1.30% Zn

 

Europa-Guadalupe vein zone
Drilling will test the projection of the Europa vein to the north of hole AL20-045, which intersected a fault-bounded felsite where the vein should have been, about 100 m north of the AL17-007 intercept (8.25 m @ 1,760 g/t Ag). Drilling will also test the vein to the south and below the AL20-047 intercept.

San José vein zone
In the northern San José vein zone, holes will be drilled under and to the north of hole AL20-075. Drilling will also test a prominent quartz vein outcrop about 400 m to the south of -075.

Minas Nuevas vein zone (Purísima, Zambona, and Zambona North veins)
Drilling here will focus on expanding the mineralized zones discovered in 1980s-era drilling, which cut high-grade mineralization below the historic workings (old reports show that the Purísima mine was worked to the 350-foot level and the Zambona mine worked a NW-plunging shoot to the 700-foot level). A blind vein, "Zambona North," was cut by drilling in the footwall of the Zambona vein and will also be targeted.

Púlpito and Cotera zones
Minaurum's hole AL19-035 intersected several zones of quartz-carbonate veining corresponding to the Púlpito and Cotera zones, but appears to have cut them from the footwall side. Follow-up drilling will be targeted from the hanging wall side, providing a better chance of defining the geometry of these moderately dipping vein zones.

Alessandra vein zone
Step-out drilling will follow up on mineralized intersections cut at the end of the Phase I drilling program (holes AL19-038, -039, and -040). Holes will be drilled from the hanging-wall side of the north-northeast striking, east-dipping vein zone. Step-outs are planned to cut the mineralized zone 100 to 150 m along strike and down-dip of the previous intersections.

Ana vein/fault zone
Minaurum has drilled only one hole on the Ana fault/vein zone target: Hole AL18-011, which cut 1.75 m averaging 40 g/t Ag, 3.57% Pb, and 16.54% Zn before entering a wide breccia interpreted as the Ana fault zone. Drilling will test the Ana zone 100-150 m along strike and 100-200 m down-dip of the AL18-011 intercept.

Promontorio vein zones
Favorable drilling results to date at Promontorio indicate that underground mapping and sampling is warranted before further drilling is done here.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/3455/86768_5e6693423484391f_003.jpg

Figure 1. Past and proposed drilling, Alamos project. Minaurum plans to drill the proposed holes shown in this figure; subsequent drilling in each vein zone is contingent on results of drilled holes.

To view an enhanced version of this Figure 1, please visit:
https://orders.newsfilecorp.com/files/3455/86768_5e6693423484391f_003full.jpg


Minaurum Gold Inc. (TSXV: MGG) (OTCQX: MMRGF) (FSE: 78M) is a Mexico-focused explorer concentrating on the high-grade Alamos silver project in southern Sonora. With a property portfolio encompassing multiple additional district-scale projects, Minaurum is managed by one of the strongest technical and finance teams in Mexico. Minaurum's goal is to continue its founders' legacy of creating shareholder value by making district-scale mineral discoveries and executing accretive mining transactions. For more information, please visit our website at www.minaurum.com and follow us on YouTube, Twitter @minaurumgold and LinkedIn.

ON BEHALF OF THE BOARD

"Darrell A. Rader"

Darrell A. Rader
President and CEO

For more information, please contact:
Sunny Pannu - Investor Relations and Corporate Development Manager
(778) 330 0994 or via email at pannu@minaurum.com

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this news release.

___________________________________________________________________________

2710 - 200 Granville Street 
Vancouver, BC V6C 1S4

Telephone 778 330-0994   
www.minaurum.com
info@minaurum.com

Stephen R. Maynard, Vice President of Exploration of Minaurum and a Qualified Person as defined by National Instrument 43-101, reviewed and verified the assay data, and has approved the disclosure in this News Release. Historical data reported in this news release has not been verified.

Cautionary Note Regarding Forward-Looking Information: This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. "Forward-looking information" includes, but is not limited to, statements with respect to activities, events or developments that the Company expects or anticipates will or may occur in the future. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof.

In making the forward-looking information in this release, Minaurum has applied certain factors and assumptions that are based on Minaurum's current beliefs as well as assumptions made by and information currently available to Minaurum. Although Minaurum considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking information in this release are subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking information.

Readers are cautioned not to place undue reliance on forward-looking information. Minaurum does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking information whether as a result of new information, future events or otherwise, except as required by law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/86768

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok