TORONTO, ON / ACCESSWIRE / October 4, 2017 / Murchison Minerals Ltd. (CSE: MUR) ("Murchison" or the "Company") is pleased to provide the results of the updated Mineral Resource estimate (the "September 22, 2017 Mineral Resource Estimate" or the "Estimate") for the Brabant-McKenzie Deposit (the "Deposit") located in north-central Saskatchewan.
The September 22, 2017 Mineral Resource Estimate was performed by Finley Bakker Consulting, of Campbell River, BC. The Estimate includes the addition of 10 new diamond drill holes totaling 5,600 m which were completed between February and March 2017 by Murchison and a comprehensive re-interpretation of the geology of the Deposit.
The September 22, 2017 Mineral Resource Estimate was calculated using Minesight/Hexagon 3D modeling software to define the mineralized parameters of the Deposit. Of the new diamond drill holes, all 10 were used to create the geological model and verify continuity of the Deposit. Eight of the holes added both tonnes and grade to the Estimate. The results will now be used to further systematically refine future drilling programs to test the lateral, down dip and infill extent of the Deposit.
Highlights Include:
The September 22, 2017 Mineral Resource Estimate for the Deposit is provided in Table 1.
Murchison's CEO and President Kent Pearson stated, "The last year of work on the Brabant-McKenzie Deposit has been an exceedingly successful program. The increase in the Brabant-McKenzie resource is the first step in our efforts to fully define and demonstrate the potential extents of the Deposit as we work to increase its size. The overall tonnage of the Deposit was increased primarily from 10 new diamond drill holes located outside the 2008 modelled resource. Our geological modelling continues to outline and extend the mineral continuity of the Deposit, now at approximately 610 metres down dip from surface, and shows that the mineralizing system is present at a depth of approximately 950 metres down dip from surface.
We continue to improve our understanding of the Deposit and based on our geological re-interpretation and the current drill program, results now suggest an exploration tonnage target of between 9 and 11 million tonnes.
Our team is committed to advancing the Brabant-McKenzie Deposit based on sound exploration methods and prudent allocation of financial resources as we work to deliver value for our shareholders."
Technical Report
The September 22, 2017 Mineral Resource Estimate has been prepared by independent qualified person ("QP") Finley Bakker, P.Geo., and has an effective date of September 22, 2017. The completed Technical Report, presented in standard form prescribed by Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects will be published on Murchison's website and SEDAR www.sedar.com within 45 days of this news release. The September 22, 2017 Mineral Resource Estimate was classified into Indicated or Inferred categories in accordance with the CIM Definition Standards on Mineral Resources and Reserves (CIM Definition Standards) adopted by CIM Council on May 10, 2014.
Table 1. Mineral Resource Summary for Brabant-McKenzie Deposit
Category |
Tonnes |
Zn% |
Cu% |
Pb% |
Ag (g/t) |
Zn Eq% |
Indicated |
1,500,000 |
7.46 |
0.70 |
0.39 |
31.2 |
10.09 |
Inferred |
4,500,000 |
5.99 |
0.62 |
0.28 |
19.4 |
7.99 |
2017 Drill Program Provides Tonnage Additions
The focus of the 2017 diamond drill program was to test the mineralization both laterally and down dip of the previously modeled resource (Figure 1). The bulk of the increase in the Estimate came from the 2017 diamond drill program. The remainder resulted from the review of the geological model. The deposit is now defined from surface to approximately 610 m.
(To view Figure 1, please click here)
Figure 1. 2017 Diamond Drill Holes Relative to the 2008 Resource Domains.
Areas in grey and red show the extent of previous geological model - 2017 diamond drill holes plotted in yellow, intercepts in red.
Significant infill opportunities are in place to potentially add tonnage and grade from the currently defined bottom of the Deposit to mineralization intersected in diamond drill holes BM-17-06 and 09.
Based on the result of the 2017 drill results, the Estimate and the geological model, Murchison estimates the exploration target for the Deposit now ranges from 9 to 11 million tonnes with a grade ranging from 7.5% to 9.5% Zn equivalent.
Details of the September 22, 2017 Mineral Resource Estimate
The resource for the Brabant-McKenzie Deposit was estimated on the basis of:
The exploration target range for the Brabant-McKenzie Deposit was estimated on the basis of:
2018 Drilling Program
The September 22, 2017 Mineral Resource Estimate and new geological model will be used to assist in the design of a 2018 drill program.
The objective of the 2018 diamond drill program will be:
About the Brabant-McKenzie Project
The Brabant-McKenzie project is located 175 km Northeast of La Ronge, Saskatchewan and approximately 3 km from the community of Brabant Lake. The area is accessed year round via Highway 102 and is serviced by grid power. The project consists of 1 mining lease which hosts the Deposit and an additional 13 contiguous mineral claims totaling 5,731 ha which cover approximately 16 km of strike length over favourable geological horizons.
About Murchison Minerals Ltd.
Murchison Minerals Ltd. is a Canadian based exploration company with a diversified portfolio of properties, including the 100% owned Brabant-McKenzie zinc-copper project in North-Central Saskatchewan and the HPM Nickel/Copper/Cobalt project in Quebec. Murchison also holds gold claims in the Pickle Lake area of northwestern Ontario.
Additional information about Murchison Minerals and its exploration projects can be found on the Company's website at www.murchisonminerals.com.
Qualified Person
The foregoing scientific and technical disclosure in this news release has been prepared and approved by Finley Bakker, P. Geo. and Kent Pearson P. Geo., qualified persons as defined by National Instrument 43-101. Mr. Bakker is an independent consultant to Murchison Minerals Ltd. and the Brabant-McKenzie Project. Mr. Pearson is President and Chief Executive Officer of Murchison Minerals Ltd.
For further information, please contact:
Kent Pearson, President and Chief Executive Officer
or
Erik Martin, Chief Financial Officer
info@murchisonminerals.com
(416) 350-3776
Certain information set forth in this news release may contain forward-looking information that involves substantial known and unknown risks and uncertainties. This forward-looking information is subject to numerous risks and uncertainties, certain of which are beyond the control of the Company, including, but not limited to, the impact of general economic conditions, industry conditions, and dependence upon regulatory approvals. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking information. The parties undertake no obligation to update forward-looking information except as otherwise may be required by applicable securities law.
NEITHER THE CSE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE CSE) ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS PRESS RELEASE.
SOURCE: Murchison Minerals Ltd.