VANCOUVER, British Columbia, May 15, 2018 (GLOBE NEWSWIRE) -- Nevada Copper Corp. (TSX:NCU) ("Nevada Copper" or the “Company”) is pleased to announce results from the first two holes of its 2018 open pit diamond drill program, at the Company's 100%-owned, fully-permitted Pumpkin Hollow Project in Nevada. The previously announced program aims to expand the North Pit deposit and convert previously untested areas, historically classified as waste, to ore.
|
Both holes have encountered multiple zones of wide mineralization at shallow depth. Hole NC18-01, located in the previously undrilled Northern Extension Zone of the North Pit, intersected multiple zones of copper mineralization, including 42.7 meters true thickness averaging 2.05% copper. This mineralization is wider and of higher grade than adjacent holes and extends mineralization into areas previously classified as waste.
Results Highlights
The Importance of the Northern Extension Zone: The Northern Extension Zone covers a large area adjacent to existing North Pit mineralization. The Northern Extension Zone was not previously drilled due to the now completed land transfer process. As a result, this large area within the existing North Pit shell was classified as waste in previous technical studies. Subsequent geological analysis has shown the Northern Extension Zone to be a highly-prospective area. The 2018 drill program aims to add mineralization to the open pit deposit, which has the potential to further enhance open pit economics by reducing stripping costs and extending the ore body.
Matt Gili, President and Chief Executive Officer, commented, “We are pleased to see this successful start to the 2018 open pit drill program. These first holes both expand mineralization to the north and in the core of the North Pit, and are part of an ongoing drill program with the objective of extending mineralization and converting waste to ore in the open pit.”
North Pit Drilling – Detailed Results
Drill hole NC18-01, located in the Northern Extension Zone, intersected multiple zones of mineralization along the hole. Mineralization is expanded to the north with the largest and shallowest zone intersecting 42.7 meters true thickness averaging 2.05% copper. Not only is this mineralization higher grade and thicker than adjacent holes it also extends into material previously classified as waste (see figure 1). Additional off set holes are planned as part of the ongoing drill program.
Drill hole NC18-02 is located in the core area of the North Pit. The drill hole targeted areas below existing mineralization, and within the pit limits, that were previously classified as inferred and waste due to drill spacing. The hole successfully intersected new zones of mineralization. The upper intersections confirmed existing mineralization, with intersections such as 84.4m at 0.57% Cu, and the lower intersections defined three new zones of mineralization below the existing deposit.
The 2018 drill program complements the open pit optimization work currently being undertaken by Golder Associates. The open pit optimization study will leverage existing feasibility-level work on the open pit and incorporate the drilling program completed by the Company in 2015, with the aim of defining a reduced-capex, staged-development approach to the open pit project.
Photos accompanying this announcement are available at
http://resource.globenewswire.com/Resource/Download/af69ca38-91ab-42e3-8864-431d30b37b9b
http://resource.globenewswire.com/Resource/Download/654de313-4af3-4d53-8f93-9e7f236bd243
The table below summarizes the current assay results. The 2018 drill program is ongoing and assays for the subsequent drill holes will be posted as results are received.
Hole # | From | To | Length | True Length | Cu | Gold | Silver | CuEq* |
(m) | (m) | (m) | (m) | % | (g/t) | (g/t) | % | |
NC18-01 | 94.5 | 137.2 | 42.7 | 42.0 | 2.05 | 0.061 | 5.8 | 2.12 |
150.6 | 169.1 | 18.5 | 18.2 | 0.30 | 0.016 | 0.9 | 0.31 | |
201.0 | 209.0 | 8.0 | 7.9 | 0.70 | 0.021 | 2.6 | 0.73 | |
220.6 | 232.6 | 12.0 | 11.8 | 0.43 | 0.012 | 1.3 | 0.44 | |
271.3 | 285.6 | 14.3 | 14.0 | 0.86 | 0.039 | 2.2 | 0.89 | |
356.9 | 367.3 | 10.4 | 10.2 | 0.34 | 0.025 | 1.3 | 0.36 | |
NC18-02 | 106.7 | 135.9 | 27.2 | 27.2 | 0.37 | 0.030 | 1.1 | 0.39 |
141.7 | 226.1 | 84.4 | 84.4 | 0.57 | 0.047 | 1.7 | 0.61 | |
236.5 | 252.7 | 16.2 | 16.2 | 0.23 | 0.022 | 0.5 | 0.24 | |
364.5 | 410.2 | 45.7 | 45.7 | 0.19 | 0.028 | 1.0 | 0.21 | |
478.8 | 488.3 | 9.5 | 9.5 | 0.23 | 0.031 | 1.1 | 0.25 | |
504.1 | 514.3 | 10.2 | 10.2 | 0.17 | 0.024 | 0.8 | 0.19 |
* Cu Equivalent using Cu $3.10, Au $1300 and Ag $17; recoveries 89.3%, 67.3% and 57.3% respectively.
About Nevada Copper
Nevada Copper (TSX:NCU) owns Pumpkin Hollow - the only major, shovel-ready and fully-permitted copper project in North America. Located in Nevada, USA, Pumpkin Hollow has substantial reserves and resources including copper, gold, silver, as well as a large iron resource.
Its two fully-permitted projects include: the high-grade Pumpkin Hollow underground mine which is expected to move into construction shortly with a view to near-term commencement of copper production; and the Pumpkin Hollow open pit, a large-scale copper deposit which is currently undergoing an optimization program to target a reduced-capex, staged-development approach.
Additional Information
For further information please visit the Nevada Copper corporate website (www.nevadacopper.com) and visit our Pumpkin Hollow virtual tour.
Qualified Persons
The technical information in this release has been reviewed and approved by Gregory French, P.G., Vice-President, Exploration & Project Development and Robert McKnight, P. Eng., Executive Vice-President and CFO of Nevada Copper, all of whom are Non-independent Qualified Persons within the meaning of NI 43-101.
NEVADA COPPER CORP.
Matt Gili, President and CEO
For further information call:
Rich Matthews,
VP Marketing and Investor Relations
Phone 604-355-7179
Toll free: 1-877-648-8266
Email: rmatthews@nevadacopper.com