Vancouver, British Columbia, Aug. 31, 2026 (GLOBE NEWSWIRE) -- NevGold Corp. (“NevGold” or the “Company”) (TSXV:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) is pleased to announce that it has filed a Technical Report on SEDAR+ supporting its maiden Mineral Resource Estimate (“MRE”) for the Limousine Butte gold-antimony project (the “Project”, “Limo Butte”) in Nevada.
The technical report titled “NI 43-101 Technical Report: Mineral Resource Estimate, Limousine Butte Gold-Antimony Property” dated August 24, 2026, with an effective date of July 15, 2026 (the “Technical Report”), was prepared by Gregory Z. Mosher, P. Geo., M.Sc. Applied, and Daniel W. Kappes, P.E. in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”) and supports the MRE disclosure made by the Company in its news release dated July 15, 2026. A full copy of the Technical Report can be found at SEDAR+ (www.sedarplus.ca) under the Company’s issuer profile.
There are no material differences between the MRE in the Technical Report and the information previously disclosed in the Company’s news release dated July 15, 2026.
NevGold CEO, Brandon Bonifacio, comments: “Our maiden, large-scale, oxide gold-antimony Mineral Resource Estimate was an important first step in delivering on our uniquely positioned opportunity at Limo Butte. We have delivered on one of the largest, most strategic, gold-antimony resources in the United States, and our recently announced first drill results from 2026 have already expanded mineralization from the initial MRE. We have the potential to advance Limo Butte to a near-term antimony production scenario from the already mined material on surface from the historical gold leach pads, while we systematically advance the other deposits with further drilling to add scale and increase grade. We have also made strong progress advancing the next phase of Engineering Studies, which is another key upcoming milestone for the Project. We will continue to build off this initial MRE, as it will be a very active next period as our drill program continues with over 35 holes with assays pending.”
Limousine Butte Maiden Mineral Resource Estimate
The tables below are extracted from the MRE disclosed in the Technical Report.
Table 1. Limo Butte – Consolidated Mineral Resource Estimate (see notes below)
| Zone | Tonnes (Mt) | Gold Grade (g/t) | Ounces Gold | Silver Grade (g/t) | Silver Ounces | Sb (%) | Sb (t) |
| Measured | |||||||
| Leach Pads | 1.0 | 0.31 | 9,500 | 2.80 | 87,000 | 0.26% | 2,600 |
| Indicated | |||||||
| Leach Pads | 1.2 | 0.29 | 11,600 | 2.43 | 96,700 | 0.30% | 3,700 |
| Pre-Strip Dump | 0.09 | 0.30 | 900 | 0.13 | 400 | 0.65% | 600 |
| Resurrection | 12.9 | 0.38 | 159,400 | 0.91 | 378,100 | 0.19% | 24,900 |
| Cadillac Valley | - | - | - | - | - | - | - |
| Northern Zones8 | - | - | - | - | - | - | - |
| Total M&I | 15.2 | 0.37 | 181,400 | 1.15 | 562,200 | 0.21% | 31,800 |
| Inferred | |||||||
| Leach Pads | - | - | - | - | - | - | - |
| Pre-Strip Dump | 0.05 | 0.28 | 400 | 0.03 | 40 | 0.99% | 500 |
| Resurrection | 28.5 | 0.29 | 261,600 | 0.87 | 799,100 | 0.12% | 34,600 |
| Cadillac Valley | 57.2 | 0.37 | 686,500 | 0.49 | 895,700 | 0.07% | 40,600 |
| Northern Zones8 | 31.7 | 0.25 | 255,000 | - | - | - | - |
| Total Inferred | 117.5 | 0.32 | 1,203,500 | 0.61 | 1,694,840 | 0.09% | 75,700 |
Table 2. Limo Butte: Antimony Sub-Domains within the Consolidated Mineral Resource Estimate (see notes below)
| Zone | Tonnes (Mt) | Gold Grade (g/t) | Ounces Gold | Silver Grade (g/t) | Silver Ounces | Sb (%) | Sb (t) |
| Measured | |||||||
| Leach Pads | 1.0 | 0.31 | 9,500 | 2.80 | 87,000 | 0.26% | 2,600 |
| Indicated | |||||||
| Leach Pads | 1.2 | 0.29 | 11,600 | 2.44 | 96,700 | 0.30% | 3,700 |
| Pre-Strip Dump | 0.09 | 0.30 | 900 | 0.13 | 400 | 0.65% | 600 |
| Resurrection | 9.1 | 0.37 | 107,500 | 0.97 | 283,500 | 0.25% | 22,700 |
| Cadillac Valley | - | - | - | - | - | - | - |
| Northern Zones8 | - | - | - | - | - | - | - |
| Total M&I | 11.3 | 0.36 | 129,500 | 1.28 | 467,600 | 0.26% | 29,600 |
| Inferred | |||||||
| Leach Pads | - | - | - | - | - | - | - |
| Pre-Strip Dump | 0.04 | 0.28 | 400 | 0.03 | 40 | 1.02% | 500 |
| Resurrection | 14.1 | 0.19 | 87,300 | 0.61 | 275,700 | 0.20% | 27,600 |
| Cadillac Valley | 12.7 | 0.26 | 108,400 | 0.53 | 218,100 | 0.16% | 20,000 |
| Northern Zones8 | - | - | - | - | - | - | - |
| Total Inferred | 26.9 | 0.23 | 196,100 | 0.57 | 493,900 | 0.18% | 48,100 |
Table 3. Limo Butte – Cut-Off Sensitivity Table (see notes below)
| Classification | Tonnes (Mt) | Gold Grade (g/t) | Ounces Gold | Silver Grade (g/t) | Silver Ounces | Sb (%) | Sb (t) |
| 0.60 g/t AuEq. cut-off | |||||||
| Measured & Indicated | 8.9 | 0.51 | 144,200 | 1.41 | 400,000 | 0.28% | 25,100 |
| Inferred | 51.8 | 0.41 | 690,700 | 1.08 | 700,220 | 0.14% | 28,600 |
| 0.45 g/t AuEq. cut-off | |||||||
| Measured & Indicated | 11.3 | 0.44 | 160,600 | 1.28 | 463,100 | 0.25% | 28,400 |
| Inferred | 70.3 | 0.38 | 868,000 | 0.83 | 1,036,340 | 0.12% | 46,000 |
| 0.30 g/t AuEq. cut-off | |||||||
| Measured & Indicated | 15.2 | 0.37 | 181,400 | 1.15 | 562,200 | 0.21% | 31,800 |
| Inferred | 117.5 | 0.32 | 1,203,500 | 0.61 | 1,694,840 | 0.09% | 75,700 |
| 0.15 g/t AuEq. cut-off | |||||||
| Measured & Indicated | 23.1 | 0.28 | 204,900 | 0.98 | 729,300 | 0.16% | 36,100 |
| Inferred | 221.9 | 0.23 | 1,628,900 | 0.49 | 2,997,940 | 0.06% | 114,000 |
Notes to Tables above:
Notes to Table 2:
Readers are encouraged to review the Technical Report for detailed information pertaining to the MRE and underlying assumptions, disclaimers and other important information.
Technical information contained in this news release has been reviewed and approved by Greg French, CPG, the Company’s Vice President, Exploration, who is NevGold’s Qualified Person under NI 43-101 and responsible for technical matters of this release.
ON BEHALF OF THE BOARD
“Signed”
Brandon Bonifacio, President & CEO
For further information, please contact Brandon Bonifacio at bbonifacio@nev-gold.com, call 604-337-4997, or visit our website at www.nev-gold.com.
About the Company
NevGold is dedicated to discovering, de-risking, and rapidly advancing gold and critical metals projects across premier jurisdictions in Nevada and Idaho to drive shareholder value and strengthen US mineral security. The Company holds a 100% interest in the Limousine Butte (gold-antimony) and Cedar Wash (gold) projects in Nevada, and the Nutmeg Mountain (gold) and Zeus (copper) projects in Idaho. For more information, please visit www.nev-gold.com.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Note Regarding Forward Looking Statements
This news release contains forward-looking statements that are based on the Company’s current expectations and estimates. Forward-looking statements are frequently characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate”, “suggest”, “indicate” and other similar words or statements that certain events or conditions “may” or “will” occur. Forward-looking statements include, but are not limited to, statements regarding continued exploration on the Project, upgrading inferred mineral resources to indicated mineral resources, and entering the next phase of Engineering Studies. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such risks include, but are not limited to, dangers inherent in exploration, development and mining activities; the uncertainty of mineral resource estimates; actual exploration or development plans and costs differing materially from the Company’s estimates; obtaining additional financing from time-to-time to continue operations; compliance with government regulation; stock market volatility that may adversely affect the price of the Company’s securities; the ability to obtain and maintain any necessary permits, consents or authorizations required for mining activities; general economic, market and business conditions, and the ability to obtain all necessary regulatory approvals. There is some risk that the forward-looking statements will not prove to be accurate, that the management’s assumptions may not be correct or that actual results may differ materially from such forward-looking statements. Accordingly, readers should not place undue reliance on the forward-looking statements. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.