Nighthawk Gold Corp. (“Nighthawk” or the “Company”) (TSX: NHK; OTCQX: MIMZF) is pleased to report an updated Mineral Resource Estimate1 (the “2023 MRE”) on the Colomac Gold Project (the “Project”), located 200 kilometres (“km”) north of Yellowknife, Northwest Territories, Canada (please see Table 1 for the 2023 MRE Summary). The 2023 MRE demonstrates a significant expansion of the open-pit (“OP”) mineralization compared to the estimates reported in 20222 (“2022 Estimate”) and the potential for a future large-scale, OP project within the Company’s District-Scale exploration land package.
This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20230209005475/en/
Figure 1 - District-Scale Gold Property Map – Northwest Territories, Canada (Graphic: Business Wire)
Table 1: 2023 MRE Summary1** (Effective date of February 9, 2023). Please review “Notes to Accompany the 2023 MRE” at the end of the news release for additional information.
|
Indicated Mineral Resource |
Inferred Mineral Resource |
||||
Potential mining method |
Tonnes (000s) |
Grade (g/t Au) |
Contained gold ounces |
Tonnes (000s) |
Grade (g/t Au) |
Contained gold ounces |
Open Pit (OP) |
59,846 |
1.45 |
2,804,000 |
10,773 |
2.32 |
802,000 |
Underground (UG) |
10,486 |
1.73 |
584,000 |
13,526 |
2.05 |
889,000 |
Global (OP + UG) |
70,432 |
1.50 |
3,388,000 |
24,299 |
2.17 |
1,691,000 |
**Numbers may not add up due to rounding.
Highlights:
Table 2: Comparison between 2023 MRE1** and 2022 Estimate2** – OP and UG Mineralization. Please review “Notes to Accompany the 2023 MRE” at the end of the news release for additional information.
Category |
Tonnes (000 tonnes) |
Grade (g/t Au) |
Contained Gold Ounces |
||||||
2023
|
2022
|
Change |
2023
|
2022
|
Change |
2023
|
2022
|
Change |
|
OP |
|
|
|
|
|
|
|
|
|
Indicated |
59,845 |
46,402 |
29% |
1.45 |
1.38 |
5% |
2,804,000 |
2,062,400 |
36% |
Inferred |
10,773 |
7,831 |
38% |
2.32 |
2.39 |
-3% |
802,000 |
601,000 |
34% |
UG |
|
|
|
|
|
|
|
|
|
Indicated |
10,486 |
11,761 |
-11% |
1.73 |
1.65 |
5% |
584,000 |
624,700 |
-7% |
Inferred |
13,526 |
11,858 |
14% |
2.05 |
1.91 |
7% |
888,000 |
729,500 |
22% |
Global (OP+UG) |
|
|
|
|
|
|
|
|
|
Indicated |
70,432 |
58,163 |
21% |
1.50 |
1.44 |
4% |
3,388,000 |
2,687,100 |
26% |
Inferred |
24,299 |
19,689 |
23% |
2.17 |
2.10 |
3% |
1,691,000 |
1,330,500 |
27% |
**Numbers may not add up due to rounding.
Nighthawk President and CEO Keyvan Salehi, P.Eng. commented: “Our 2023 MRE demonstrates a significant boost in estimated ounces in the Indicated and Inferred categories compared to last year. More importantly, the OP mineralization has reached 2.8 million estimated ounces in the Indicated category and 0.8 million ounces in the Inferred category. The improvement in the estimated OP Indicated grades is noteworthy considering that we utilized a lower cut-off grade for all the deposits compared to the 2022 Estimate.”
“Over the past 2 years, we have increased the estimated OP ounces in the Indicated category by 415% and the Inferred category by 2,470%, while maintaining estimated OP gold grades that are well above the average for OP deposits of projects in advanced development. In addition, a substantial amount of the 2023 MRE tonnes and ounces are in the Indicated category, which we believe provides a higher level of confidence in our estimates.”
“The next major step of our turnaround plan is to deliver a PEA for the Project in mid-2023. Given the size of the OP Mineral Resource estimate ounces, with elevated estimated OP grades, we believe that if the Project is developed, it could have the potential to be a top-tier gold project with respect to size, scale, and economics, located in a mining-friendly jurisdiction.”
“Looking ahead, we are excited about our 2023 exploration plans. We believe there is a massive potential for discovering more gold mineralization across our 930 km2 district-scale property. All our deposits remain open in all directions and show great promise for further expansion in mineral resource ounces.”
2023 MRE1
The 2023 MRE1 benefits from an additional 40 km of drilling information collected in 2022, which targeted areas of higher-grade, near-surface mineralization. The 2023 MRE is comprised of eight (8) deposits (See Table 3 for the 2023 MRE Breakdown by Deposit):
Please refer to Figure 1 for a regional map of the District-Scale Gold Property. Please refer to Figures 2 and 3 for the 2023 MRE section views of the Colomac Main and Cass Deposit, respectively.
The 2023 MRE was generated using various cut-off grades: Between 0.45-0.57 g/t Au for OP mineralization and 1.02-1.66 g/t Au for UG depending on the deposit (please refer to Table 4 for cut-off grades for each deposit). Specific extraction methods are used only to establish reasonable cut-off grades for various portions of the deposits. No PEA, Pre-Feasibility Study or Feasibility Study has been completed to support economic viability and technical feasibility of exploiting any portion of the mineral resources, by any specified mining method. The reasonable prospect for an eventual economical extraction is met by having used reasonable cut-off grades both for OP and UG extraction scenarios and constraining volumes (shapes and optimized pit-shell). Please refer to “Notes to Accompany the 2023 MRE” at the end of the news release for more information on the parameters and assumptions.
Table 3: 2023 MRE1** – Breakdown by Deposit
|
|
Indicated Mineral Resource |
Inferred Mineral Resource |
||||
|
Mining
|
Tonnes
|
Grade
|
Contained
|
Tonnes
|
Grade
|
Contained
|
Colomac Centre |
|||||||
Colomac Main |
OP |
54504 |
1.45 |
2,548,000 |
2,625 |
1.97 |
166,000 |
UG |
8,750 |
1.77 |
498,000 |
10,017 |
1.97 |
634,000 |
|
24/27 |
OP |
1,451 |
1.75 |
82,000 |
15 |
1.51 |
700 |
UG |
514 |
1.55 |
26,000 |
305 |
1.97 |
19,000 |
|
Goldcrest |
OP |
2,849 |
1.36 |
125,000 |
104 |
1.52 |
5,000 |
UG |
659 |
1.49 |
32,000 |
225 |
1.29 |
9,000 |
|
Grizzly Bear |
OP |
1,142 |
1.34 |
49,000 |
11 |
0.69 |
250 |
UG |
563 |
1.54 |
28,000 |
156 |
1.43 |
7,000 |
|
Satellite Deposits |
|||||||
Cass |
OP |
- |
- |
- |
3,983 |
2.36 |
302,000 |
UG |
- |
- |
- |
702 |
2.05 |
46,000 |
|
Kim |
OP |
- |
- |
- |
2,568 |
1.72 |
142,000 |
UG |
- |
- |
- |
662 |
1.88 |
40,000 |
|
Treasure Island |
OP |
- |
- |
- |
962 |
3.86 |
119,000 |
UG |
- |
- |
- |
857 |
3.01 |
83,000 |
|
Damoti |
OP |
- |
- |
- |
505 |
4.13 |
67,000 |
UG |
- |
- |
- |
601 |
2.60 |
50,000 |
|
Global |
OP + UG |
70,432 |
1.50 |
3,388,000 |
24,299 |
2.17 |
1,691,000 |
**Numbers may not add up due to rounding.
Colomac Main Deposit
Mineral Resource estimates at the Colomac Main expanded along strike to the south in Zone 3.5 and in the north at Zone 1.0 compared to the 2022 Estimate2. A significant portion of the UG mineralization at Zone 2.0 was converted to OP. The Colomac Main Deposit remains open in all directions and ongoing structural modeling will support mineralization controls and potential targeting for UG high-grade mineralization. With the successful continuation of mineralization to the south hosted in gabbro and quartz gabbro (compared to quartz diorite), the area to explore has expanded and allowed for potential new discovery. The average depth of the estimated pit-shells is approximately 200 m below surface, with the deepest portion at approximately 450 m below surface in Zone 2.0.
24/27 Deposit
The mineralization at the 24/27 Deposit expanded along strike and at depth compared to the 2022 Estimate2. There was also a meaningful conversion of the OP mineralization from the Inferred to Indicated category, improving the overall confidence level of the 24/27 Deposit Mineral Resource estimation. Successful 2022 drilling along the margins of the 24/27 Deposit suggest the potential expansion of the mineralization along strike and at depth with further drilling. The VTEM survey conducted in late 2022 identified a high conductive zone along the 12 km geological contact that host the 24/27 Deposit. Follow up targeting is being completed during the winter.
Cass Deposit
A very successful 2022 drill program expanded the Cass Deposit mineralization at depth and along strike, adding an auxiliary pit to the west. The estimated OP Inferred Mineral Resource ounces increased 67% compared to the 2022 Estimate2. The new auxiliary pit is located along strike from the Albatross zone (700 m to the west of the Cass Deposit); mineralization was intercepted at Albatross when last drilled in 20213. Strong conductive zones have been identified along the western felsic boundary to the sediments.
Adjustments to the Assumptions and Parameters
The 2023 MRE1 includes a few assumptions and parameters that were adjusted compared to the 2022 Estimate2; please see Table 4 for a Summary of the adjusted assumptions and parameters. The Company and its independent consultants believe that there is potential for a future, large-scale, OP operation at its properties. With additional drill data and a slight increase in the gold price assumption, parameters for the 2023 MRE were adjusted, particularly the OP cut-off grades for each deposit (refer to Notes to Accompany the 2023 MRE for further details).
Table 4: Comparison between 2023 MRE1 and 2022 Estimate2 – Assumptions and Parameters
Category |
Key Assumptions and Parameters |
||
2023 MRE1 |
2022 Estimate2 |
Details |
|
Gold price |
US$1,660/oz |
US$1,600/oz |
Slightly higher gold price assumption compared to the 2022 Estimate (US$1,600/oz) and 2021 Estimate (US$1,650/oz) |
Cut-off grades (g/t Au) |
Colomac Main: OP 0.45; UG 1.02 24/27 & Grizzly Bear: OP 0.46; UG 1.03 Goldcrest: OP 0.45; UG 1.02 Cass & Kim: OP 0.52; UG 1.31 Damoti : OP 0.57; UG 1.66 Treasure Island: OP 0.51; UG 1.50 |
Colomac Main: OP 0.50; UG 1.02 24/27 & Grizzly Bear: OP 0.51; UG 1.02 Goldcrest: OP 0.50; UG 1.02 Cass & Kim: OP 0.58; UG 1.45 Damoti: OP 0.63; UG 1.83 Treasure Island: OP 0.56; UG 1.66 |
Nighthawk opted for a lower cut-off grade to provide a larger amount of mineralized blocks and allow for more flexibility for future potential mine planning |
Maiden PEA and 2023 Exploration Program
The Company has commenced work on a conceptual mine plan, infrastructure, processing and economics for the Colomac Gold Project. The maiden PEA for the Colomac Gold Project is scheduled to be completed in mid-2023. Nighthawk believes that, given the size and scale of the 2023 MRE, the Project (if developed) could have the potential to be a robust, large-scale, gold operation. The Company is also finalizing its 2023 Exploration Program and will provide details soon.
Technical Information
Nighthawk has implemented a quality-control program to comply with best practices in the sampling and analysis of drill core. Drill core samples were transported in security-sealed bags for analyses at ALS Global Assay Laboratory in Vancouver, BC (“ALS Global”). ALS Global is an ISO/IEC 17025 accredited laboratory. Pulp and metallics assaying for gold were conducted on the entire pulverized sample.
As part of its QA/QC program, Nighthawk inserts external gold standards (low to high-grade) and blanks every 20 samples in addition to the standards, blanks, and pulp duplicates inserted by ALS Global.
Technical Report and Qualified Persons
A Technical Report prepared in accordance with NI 43-101 (as defined below) in support of the 2023 MRE1 will be filed on SEDAR (www.sedar.com) before March 25, 2023. Readers are encouraged to read the Technical Report in its entirety, including all qualifications, assumptions and exclusions that relate to the 2023 MRE1. The Technical Report is intended to be read as a whole, and sections should not be read or relied upon out of context.
Technical information related to the 2023 MRE1 contained in this news release has been reviewed and approved by Marina Iund, M.Sc., P.Geo., Carl Pelletier, P.Geo., and Simon Boudreau, P.Eng. of InnovExplo, who are Independent and Qualified Persons as defined by NI 43-101, with the ability and authority to verify the authenticity and validity of this data.
John McBride, MSc., P.Geo., Vice President of Exploration for Nighthawk, who is the “Qualified Person” as defined by NI 43-101 for this project, has reviewed and approved of the technical disclosure contained in this news release.
About Nighthawk Gold Corp.
Nighthawk is a Canadian-based gold exploration company with 100% ownership of more than 930 km2 of district-scale land position within the Indin Lake Greenstone Gold Belt, located approximately 200 km north of Yellowknife, Northwest Territories, Canada. The Colomac Gold Project currently has a Mineral Resource Estimate1 of approximately 70.3 million tonnes grading 1.50 g/t Au for 3.39 million ounces in the Indicated category and approximately 24.3 million tonnes grading 2.10 g/t Au for 1.64 million ounces in the Inferred category. Nighthawk’s experienced management team, with a track record of successfully advancing projects and operating mines, is working towards demonstrating the economic viability of its assets and rapidly advancing its projects towards a development decision.
Notes to Accompany the 2023 MRE1
Forward-Looking Information
This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, information with respect to the Company’s Mineral Resource Estimates, the potential extractability of the OP/pit-constrained and UG mineralization, the potential expansion of Mineral Resource Estimates, the potential for higher-grade assay results, the potential of the Project to be a ‘top-tier’ gold project in a safe mining jurisdiction, the potential of the Project to be developed, the delivery of the PEA by mid-2023, the large-scale and robust nature of the Project PEA, the continued exploration and drilling initiatives and having the necessary funding required to complete these initiatives, the prospectivity of exploration targets, the potential economic viability of the assets, and the advancement of projects towards a development decision. Generally, forward-looking information can be identified by the use of forward-looking terminology such as “add” or “additional”, “advancing”, “anticipates” or “does not anticipate”, “appears”, “believes”, “can be”, “conceptual”, “confidence”, “continue”, “convert” or “conversion”, “deliver”, “demonstrating”, “estimates”, “encouraging”, “expand” or “expanding” or “expansion”, “expect” or “expectations”, “forecasts”, “forward”, “goal”, “improves”, “increase”, “intends”, “justification”, “plans”, “potential” or “potentially”, “promise”, “prospective”, “prioritize”, “reflects”, “scheduled”, “suggesting”, “support”, “updating”, “upside”, “will be” or “will consider”, “work towards”, or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might”, or “will be taken”, “occur”, or “be achieved”.
Forward-looking information is based on the opinions and estimates of management at the date the information is made, and is based on a number of assumptions and is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Nighthawk to be materially different from those expressed or implied by such forward-looking information, including risks associated with required regulatory approvals, the exploration, development and mining such as economic factors as they effect exploration, future commodity prices, changes in foreign exchange and interest rates, actual results of current exploration activities, government regulation, political or economic developments, the ongoing wars and their effect on supply chains, environmental risks, COVID-19 and other pandemic risks, permitting timelines, capital expenditures, operating or technical difficulties in connection with development activities, employee relations, the speculative nature of gold exploration and development, including the risks of diminishing quantities of grades of reserves, contests over title to properties, and changes in project parameters as plans continue to be refined as well as those risk factors discussed in Nighthawk's annual information form for the year ended December 31, 2021, available on www.sedar.com. Although Nighthawk has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. Nighthawk does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
Cautionary Statement regarding Mineral Resource Estimates
Until mineral deposits are actually mined and processed, Mineral Resources must be considered as estimates only. Mineral Resource estimates that are not Mineral Reserves and have not demonstrated economic viability. The estimation of Mineral Resources is inherently uncertain, involves subjective judgement about many relevant factors and may be materially affected by, among other things, environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant risks, uncertainties, contingencies and other factors described in the Company’s public disclosure available on SEDAR at www.sedar.com. The quantity and grade of reported “Inferred” Mineral Resource estimates are uncertain in nature and there has been insufficient exploration to define “Inferred” Mineral Resource estimates as an “Indicated” or “Measured” Mineral Resource and it is uncertain if further exploration will result in upgrading “Inferred” Mineral Resource estimates to an “Indicated” or “Measured” Mineral Resource category. The accuracy of any Mineral Resource estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and geological interpretation, which may prove to be unreliable and depend, to a certain extent, upon the analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. Mineral Resource estimates may have to be re-estimated based on, among other things: (i) fluctuations in mineral prices; (ii) results of drilling, and development; (iii) results of future test mining and other testing; (iv) metallurgical testing and other studies; (v) results of geological and structural modeling including block model design; (vi) proposed mining operations, including dilution; (vii) the evaluation of future mine plans subsequent to the date of any estimates; and (viii) the possible failure to receive required permits, licenses and other approvals. It cannot be assumed that all or any part of a “Inferred” or “Indicated” Mineral Resource estimate will ever be upgraded to a higher category. The Mineral Resource estimates disclosed in this news release were reported using Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards for Mineral Resources and Mineral Reserves (the “CIM Standards”) in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators (“NI 43-101”).
Cautionary Statement to U.S. Readers
This news release uses the terms “Mineral Resource”, “Indicated Mineral Resource” and “Inferred Mineral Resource” as defined in the CIM Standards in accordance with NI 43-101. While these terms are recognized and required by the Canadian Securities Administrators in accordance with Canadian securities laws, they may not be recognized by the United States Securities and Exchange Commission.
The Mineral Resource estimates and related information in this news release may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder.
____________________
1There is no certainty that the 2023 MRE will be converted to Proven and Probable Mineral Reserve categories or will be realized in the future. Mineral Resource estimates that are not Mineral Reserves do not have demonstrated economic viability. The 2023 MRE may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant risks, uncertainties and other factors, as more particularly described in the Cautionary Statements at the end of this news release.
2For further details refer to the 2022 Estimate effective as of March 8, 2022 reported in the Company’s NI 43-101 technical report entitled “NI 43-101 Technical Report and Update of the Mineral Resource Estimate for the Indin Lake Gold Property, Northwest Territories, Canada” and dated March 31, 2022 (the “2022 Technical Report”), which is available on SEDAR www.sedar.com and on the Company’s website at www.nighthawkgold.com. The 2022 Estimate is not current and should not be relied upon, it has been superseded by the 2023 MRE.
3See Nighthawk news release dated December 1, 2021 for more details on the Albatross drill results, which can be accessed in the Company’s profile on www.sedar.com or on the Company’s website www.nighthawkgold.com.
View source version on businesswire.com: https://www.businesswire.com/news/home/20230209005475/en/