Orsu Metals Announces Stage 1 of the 2019 Exploration Program that Aims to Expand the Mineralization Envelope at Sergeevskoe Gold Project, Russia

2019-05-29 / @accesswire

 

VANCOUVER, BC / ACCESSWIRE / May 29, 2019 / Orsu Metals Corporation (TSX-V: OSU) ("Orsu" or the "Company") will commence the 2019 exploration season in June 2019 at its Sergeevskoe Property, Zabaikalskiy Krai, Russian Federation. The priority for 2019 will be to keep the exploration momentum going to result in an expansion of the mineralized envelope with some infill drilling to determine the depth and grade of the mineralization.

Highlights:

  • Stage 1 of the 2019 exploration program will consist of a total of 3,500 m of diamond drilling to test western, northwestern, northern and downdip extensions of mineralization wireframes at Zone 23, Peak Klyuchi, Kozie and Klyuchi West domains
  • Stage 1 will also test previously undrilled occurrences
  • Additionally, a total of 3,000 m of bulldozer trenching is planned, with approximately 1500 m allocated for new targets

Dr. Alexander Yakubchuk, Director of Exploration of Orsu commented: "There is a strong potential to grow the mineralization envelope at the Sergeevskoe Gold Project beyond that identified in the maiden Inferred Mineral Resource estimate. The primary attention will be paid to the mineralization where it remains open both along the westward strike and downdip. Potential additional veins to the north of the resource envelope also warrants drill testing. Some holes will be drilled into previously identified higher grade portions aiming to better shape them and to test a possibility of raising an average grade of the mineralized system via limited infill drilling."

Dr. Sergey Kurzin, Executive Chairman of the Company, noted: "Our objective this year will be to greatly increase, ambitiously double, the size of the mineralized envelope while increasing the overall gold grade. We will start the 2019 exploration season with a limited Stage 1 program (to be completed in September 2019) to demonstrate (1) the enlarged footprint of the deposit and (2) extension of the mineralization at a deeper level under the existing resource. Information obtained in Stage 1 will feed into detailed planning of drilling at Stage 2 later this year. Stage 2 will aim to deliver the upgraded resource by Q1 2020. We are funded for Stage 1 and remain confident of our ability to raise money for Stage 2."

Orsu reviewed the results of the maiden Inferred Mineral Resource estimate (see press release 17 April 2019) and determined that exploration efforts should be focussed on growing the mineralized envelope in 2019, culminating in revised resource estimate, and to defer the commission of a preliminary economic assessment at this time.

The Company is funded to conduct a 3500 m drilling and 3000 m trenching programme at Sergeevskoe. The mineralization is open both along the westward strike and downdip. In particular, there is a strong possibility to identify new mineralization at the western continuation of Klyuchi West, Intermediate and Zone 23 domains, at whose extension, some 300m (SKZTR17-11) to 500m (Sergeeva) to the west, Orsu drilled in 2017 and 2018 two scout holes and drove two trenches with some gold mineralization identified in them as well as in historical drillholes (Figure 1).

Figure 1. Plan view of the maiden Mineral Resource block model at Sergeevskoe and exploration targets at its western and northwestern extension. Grey-blue colours depict mineralized intercepts in the historical holes. (To view the full sized image, please click here)

The Company is planning to test the downdip continuation of already identified gold mineralization at Klyuchi West and Zone 23 domains, which indicated an increase in grade potential in excess of 2 and 3 g/t Au. In the Kozie domain, new gold mineralization can be expected to the north of the mineralization wireframes, which are currently constrained to the extent of holes drilled by Orsu and remaining unconstrained by any geologically significant boundary.

In addition, there are numerous occurrences of gold mineralization and geochemical/geophysical anomalies not yet tested by Orsu beyond the area of detailed works within the Company's 7.6 square km license area of the Sergeevskoe project (see press release dated September 21, 2016).

Results of the Stage 1 2019 exploration program should significantly expand the mineralization envelope at Sergeevskoe. Stage 2, additional drilling and the completion of an updated mineral resource estimate will require the Company to raise additional funds, which the Company is confident it can achieve.

Qualified Person

Alexander Yakubchuk, the Company's Director of Exploration, Ph.D., MIMMM, a Qualified Person as defined by NI 43-101, has reviewed and approved the exploration information disclosures contained in this press release.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement:

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly, undue reliance should not be put on such statements due to the inherent uncertainty therein.

ENDS

For further information, please contact:

Alexander Yakubchuk, Director of Exploration, Orsu Metals Corporation
Doris Meyer, Corporate Secretary, Orsu Metals Corporation
Tel: +1-604-536-2711 ext 6

SOURCE: Orsu Metals Corporation



View source version on accesswire.com:
https://www.accesswire.com/546772/Orsu-Metals-Announces-Stage-1-of-the-2019-Exploration-Program-that-Aims-to-Expand-the-Mineralization-Envelope-at-Sergeevskoe-Gold-Project-Russia

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok