VANCOUVER, BC / ACCESSWIRE / October 28, 2019 / Prophecy Development Corp. ("Prophecy" or the "Company") (TSX:PCY, OTCQX:PRPCF, Frankfurt:1P2N) is pleased to announce the diamond drilling results from Prophecy's 100% controlled Paca silver project in the Potosi department of Bolivia. Borehole PND 110 intersected 89 meters grading 378 g/t Ag-Equivalent ("AgEq;" 279 g/t Ag, 1.28% Zn, 1.17% Pb) starting from 9 meters downhole, including 12 meters grading 1,085 g/t Ag starting at just 16 meters downhole.
Phase 1 Drill highlights include:
Reported widths are intercepted core lengths and not true widths, as relationships with intercepted structures and contacts vary. Based on core-angle measurements, true widths are estimated at approximately 77% of reported core lengths.
Silver equivalent ("AgEq") calculation is based on NI43-101 compliant 2017 resource report completed for the Paca deposit by Mercator Geological Services (see Company's press release dated November 22nd, 2017). Silver equivalent is calculated as follows: Ag Eq. (g/t) = Ag (g/t) + (Pb% *(US$0.94/ lb. Pb /14.583 Troy oz./lb./US$16.50 per Troy oz. Ag)*10,000) + (Zn% *(US$1.00/lb. Zn/14.583 Troy oz./lb./US$16.50 per Troy oz. Ag)*10,000). 100 % metal recoveries are assumed based on lack of comprehensive metallurgical results
PUD110 reported the highest silver width-grade intercept at the Paca project to date, which now has over 19,000 drill meters completed between Prophecy and the previous operator since 2002.
These Phase 1 drill results are anticipated to increase the overall tonnage and upgrade the confidence level of the current NI43-101 compliant resource estimate prepared independently by Mercator Geological Services Ltd in 2017 (Effective from October 20th, 2017; available on SEDAR.com):
Paca Inferred Mineral Resource Statement Details
Paca Mineral Resource Statement - Effective October 20, 2017 | ||||||
Ag Eq. Cut-Off | Category | Tonnes* | Ag | Pb | Zn | Ag Eq. |
200 | Inferred | 2,540,000 | 256g/t | 1.03% | 1.10% | 342 |
Contained Metals | 20.9 | 57.7 | 61.6 |
Notes:
The Pulacayo-Paca Mining Production Contract was executed on October 3, 2019 between Prophecy and the Bolivian government, granting Prophecy the 100% exclusive right to develop and mine at the Pulacayo and Paca concessions for up to 30 years. It is comparable to a mining license in Canada or the United States.
Michael Doolin, Prophecy's CEO states: "This drill program further solidifies Paca as a top-tier open pit silver deposit with excellent potential to expand the resource base to the east, north, and at depth. I would like to congratulate our team in Bolivia for their efforts in obtaining the Mining Production Contract and in completing this very successful 1,000 meter Paca drill campaign which was completed, from the start of drilling to full assay reporting, in one month and under budget. Our team is very excited to advance this large, district style Pulacayo-Paca silver project with unwavering support from local community and the Bolivian government"
Shortly, Prophecy plans to announce the commencement of a Phase 2, 5,000 meter drill program to expand near-surface resources at Paca and Pulacayo, which has ~3km strike length and is located 7km south of Paca.
The complete detailed composited drill intersections of mineralization are tabulated as below:
Hole | From (m) | To (m) | Length (m) | Ag (g/t) | Zn % | Pb % | AgEq |
PND107 | |||||||
55.0 | 109.0 | 54.0 | 151 | 1.01 | 1.17 | 238 | |
incl… | 70.0 | 77.0 | 7.0 | 178 | 0.97 | 1.37 | 271 |
and… | 70.0 | 109.0 | 39.0 | 180 | 1.20 | 1.34 | 283 |
and… | 87.0 | 109.0 | 22.0 | 240 | 1.23 | 1.65 | 355 |
PND108 | |||||||
15.0 | 65.0 | 50.0 | 135 | 0.40 | 1.42 | 208 | |
incl… | 33.0 | 57.0 | 24.0 | 200 | 0.60 | 2.12 | 307 |
and… | 33.0 | 43.0 | 10.0 | 257 | 0.41 | 1.49 | 333 |
94.0 | 96.0 | 2.0 | 160 | 0.94 | 0.52 | 220 | |
PND109 | |||||||
15.0 | 43.0 | 28.0 | 242 | 0.27 | 0.69 | 281 | |
incl… | 20.0 | 29.0 | 9.0 | 391 | 0.26 | 1.10 | 445 |
and… | 24.0 | 26.0 | 2.0 | 1223 | 0.42 | 3.20 | 1365 |
and… | 37.0 | 43.0 | 6.0 | 282 | 0.31 | 0.52 | 315 |
75.0 | 173.0 | 98.0 | 15 | 2.47 | 1.28 | 168 | |
incl… | 93.0 | 94.0 | 1.0 | 167 | 3.64 | 1.24 | 367 |
PND110 | |||||||
9.0 | 182.0 | 173.0 | 95 | 1.63 | 1.40 | 273 | |
incl… | 9.0 | 98.0 | 89.0 | 279 | 1.28 | 1.17 | 378 |
and… | 9.0 | 28.0 | 19.0 | 718 | 0.05 | 0.74 | 749 |
and… | 9.0 | 12.0 | 3.0 | 145 | 0.07 | 0.90 | 183 |
and… | 16.0 | 28.0 | 12.0 | 1085 | 0.04 | 0.71 | 1115 |
and… | 44.0 | 180.0 | 138.0 | 87 | 1.59 | 2.01 | 233 |
and… | 44.0 | 46.5 | 2.5 | 111 | 0.61 | 1.09 | 179 |
and… | 44.0 | 98.0 | 54.0 | 199 | 2.03 | 1.52 | 343 |
and… | 52.0 | 54.0 | 2.0 | 115 | 1.61 | 1.33 | 234 |
and… | 60.0 | 82.0 | 22.0 | 328 | 1.98 | 1.43 | 466 |
and… | 61.0 | 65.0 | 4.0 | 1248 | 1.93 | 2.88 | 1441 |
and… | 86.0 | 94.0 | 8.0 | 270 | 2.83 | 2.74 | 495 |
and… | 97.0 | 98.0 | 1.0 | 155 | 3.26 | 3.03 | 409 |
PND111 | |||||||
0.0 | 2.4 | 2.4 | 110 | 0.16 | 0.58 | 139 | |
PND112 | |||||||
12.0 | 28.0 | 16.0 | 154 | 0.08 | 0.39 | 173 | |
incl… | 21.0 | 22.0 | 1.0 | 890 | 0.05 | 0.31 | 904 |
33.0 | 36.0 | 3.0 | 120 | 0.07 | 2.40 | 216 | |
43.0 | 44.6 | 1.6 | 100 | 0.23 | 1.58 | 171 | |
PND113 | |||||||
3.0 | 28.0 | 25.0 | 196 | 0.04 | 0.29 | 209 | |
incl… | 3.0 | 17.0 | 14.0 | 185 | 0.04 | 0.38 | 202 |
and… | 21.0 | 28.0 | 7.0 | 310 | 0.04 | 0.19 | 320 |
Reported widths are intercepted core lengths and not true widths, as relationships with intercepted structures and contacts vary. Based on core-angle measurements, true widths are estimated at approximately 77% of reported core lengths.
Qualified Person
The technical contents of this news release have been prepared under the supervision of Danniel Oosterman, VP Exploration. Mr. Oosterman is not independent of the Company in that he is employed by the Company. Mr. Oosterman is a Qualified Person ("QP") as defined by the guidelines in NI 43-101. Prophecy adopts industry recognized best practices in its implementation of QA/QC methods. A geochemical standard control sample and one blank sample is inserted into the sample stream every 20th sample. Duplicates are taken at every 40th sample. Standards and duplicates including lab duplicates and standards and are analyzed using Thompson-Howarth plots. Samples are shipped to ALS Global Laboratories in Ururo, Bolivia for preparation, and then shipped to ALS Global laboratories for analysis in Lima, Peru. Samples were analyzed using Intermediate Level Four Acid Digestion. Silver overlimits ("ore grade") are analyzed using fire assay with a gravimetric finish. ALS Laboratories sample management system meets all requirements of International Standards ISO/IEC 17025:2017 and ISO 9001:2015. All ALS geochemical hub laboratories are accredited to ISO/IEC 17025:2017 for specific analytical procedures.
All samples are taken from HQ-diameter core which split in half by a diamond-blade masonry saw. One-half of the core is submitted for laboratory analysis and the other half is preserved on the Company's secured core facility for reference. All core is geotechnically analyzed, photographed and then logged by geologists prior to sampling.
About Prophecy
Prophecy is developing Pulacayo silver project in Bolivia and Gibellini vanadium project in Nevada. Further information on Prophecy can be found at www.prophecydev.com.
PROPHECY DEVELOPMENT CORP.
ON BEHALF OF THE BOARD
"Michael Doolin"
Chief Executive Officer
For more information about Prophecy, please contact Investor Relations:
+1.604.569.3661 ext. 101
ir@prophecydev.com
www.prophecydev.com
Neither the Toronto Stock Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Toronto Stock Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Note Regarding Forward-Looking Statements
Certain statements contained in this news release, including statements which may contain words such as "expects", "anticipates", "intends", "plans", "believes", "estimates", or similar expressions, and statements related to matters which are not historical facts, are forward-looking information within the meaning of applicable securities laws. Such forward-looking statements, which reflect management's expectations regarding Prophecy's future growth, results of operations, performance, business prospects and opportunities, are based on certain factors and assumptions and involve known and unknown risks and uncertainties which may cause the actual results, performance, or achievements to be materially different from future results, performance, or achievements expressed or implied by such forward-looking statements.
These factors should be considered carefully, and readers should not place undue reliance on the Prophecy's forward-looking statements. Prophecy believes that the expectations reflected in the forward-looking statements contained in this news release and the documents incorporated by reference herein are reasonable, but no assurance can be given that these expectations will prove to be correct. In addition, although Prophecy has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Prophecy undertakes no obligation to release publicly any future revisions to forward-looking statements to reflect events or circumstances after the date of this news or to reflect the occurrence of unanticipated events, except as expressly required by law.
SOURCE: Prophecy Development Corp.