TORONTO, Jan. 22, 2018 (GLOBE NEWSWIRE) -- Red Pine Exploration Inc. (TSX-V:RPX) ("Red Pine" or the "Company") announces results from four holes at its Wawa Gold Project. The drill holes were part of Red Pine’s 20,000 m drilling program that was completed last fall.
|
Drilling highlights:
Quentin Yarie, President and Chief Executive Officer of Red Pine stated, "The intersection in the Jubilee Shear Zone indicates that the high grade zones of the Surluga Deposit remain open. Our team is identifying gaps in the historic drilling in the Jubilee Shear Zone where high-grade mineralization was likely missed because the geometry of the high-grade zones within the Surluga Deposit was poorly understood. We will continue to drill in the area and expect drilling results to further corroborate our model.”
Geometry of the high-grade zones of the Surluga Deposit
The geometry of the high-grade zones in the Surluga Deposit is controlled by a strong linear tectonic fabric. This creates numerous arrays of rod-shaped high-grade zones that extend longitudinally over hundreds of metres. These high-grade zones of the Surluga Deposit have lateral extents between 25 m and 150 m; leaving gaps in the current inferred resource where additional high-grade mineralization is likely to be found that will, if intersected, improve the current inferred resource of the Surluga Deposit.
Table 1. Highlights of the 2017 drilling results in the Minto Mine South Zone | ||||||
Hole | From (m) | To (m) | Length (m)* | Gold (g/t) | Gold Zone | |
SD-17-171 | 199 | 204 | 5 | 6.25 | Minto Mine South Zone | |
Including | ||||||
200.4 | 202.3 | 1.9 | 15.06 |
*Assay results reported over intersection length. In the Minto Mine South Zone, for SD-17-171;, the intersection length is estimated to be >60% true width.
Table 2. Highlights of the 2017 drilling results in the Jubilee Shear Zone | |||||
Hole | From (m) | To (m) | Length (m)* | Gold (g/t) | Gold Zone |
SD-17-173 | 44.3 | 59.3 | 15 | 5.28 | Jubilee Shear Zone |
Including | |||||
44.3 | 45.6 | 1.3 | 22.76 | ||
47.5 | 51.4 | 3.1 | 8.76 | ||
55.4 | 56.4 | 1 | 12.01 | ||
76.8 | 82.5 | 5.7 | 0.99 | Surluga Road Shear |
*Assay results reported over intersection length. In the Minto Mine South Zone, for SD-17-173;, the intersection length is estimated to be >95% true width.
Table 3. Highlights of the 2017 drilling results in the Minto Stockwork | |||||
Hole | From (m) | To (m) | Length (m)* | Gold (g/t) | Gold Zone |
SD-17-125 | 219.4 | 220.7 | 1.3 | 11.4 | Minto Stockwork |
Additional drilling is required to estimate the true width of the Minto stockwork.
Minto Mine South Discovery Area
Red Pine’s infill drilling in the Minto Mine South Zone (“MMSZ”) supports the continuity of the MMSZ. Drilling also continues intersect networks of tension veins with high-grade quartz veins around the MMSZ. Hole SD-17-128 contained lower grade material of 1.18 g/t gold over 3.8 metres. The Company has retained Golder Associates Ltd. to conduct a 43-101 resource on the MMSZ.
JV Partner Updates Position
Red Pine wishes the acknowledge the continued support and commitment of its JV Partner Citabar LP that issued the following statement, “Citabar remains committed to advancing the value of its interest in the Wawa Gold Project and continues to work with Red Pine in the development of the exploration target.”- Citabar LP.
Wawa Gold Project Background
The Wawa Gold property package consists of over 5,500 hectares and hosts several former mines with a combined historic production of 120,000 oz gold1. To date, the largest gold deposit on the property is the Surluga Deposit, which hosts a NI 43-101 Inferred Resource of 1,088,000 oz gold at an average grade of 1.71 g/t (using a 0.5 g/t cut-off) contained within 19.82 million tonnes2.
Since December 2014, Red Pine's exploration work has involved the ongoing sampling of 42,000 m of historic core that was never sampled by previous operators of the project, and aggressive drilling campaigns. To date, the Company has completed over 31,000 m of drilling and made four discoveries along the extension of the Surluga Deposit: the Surluga North Zone; the Hornblende-William Zone; the Minto Mine South Zone and; the Grace-Darwin Zone. These are part of the Wawa Gold Corridor, a gold-mineralization zone that extends for more than 5 km.
Red Pine’s on-going drill program is designed to potentially expand the size of the existing inferred gold resource and connect the other zones of gold mineralization along the newly-discovered Wawa Gold Corridor. Two drills are currently operating non-stop- one is targeting the Surluga North discovery while the second drill is targeting the Minto Mine South Zone discovery.
The Company is well positioned to fund its share of the Wawa Gold exploration program.
As such, the sampling and drill programs are expected to continue in 2018.
On-site Quality Assurance/Quality Control (“QA/QC”) Measures
Drill core samples were transported in security-sealed bags for analyses to Activation Laboratories Ltd. in Ancaster, Ontario. Individual samples are labeled, placed in plastic sample bags and sealed. Groups of samples are then placed into durable rice bags and then shipped. The remaining coarse reject portions of the samples remain in storage if further work or verification is needed.
Red Pine has implemented a quality-control program to comply with best practices in the sampling and analysis of drill core. As part of its QA/QC program, Red Pine inserts external gold standards (low to high grade) and blanks every 20 samples in addition to random standards, blanks, and duplicates.
Qualified Person
Quentin Yarie, P Geo. is the qualified person responsible for preparing, supervising and approving the scientific and technical content of this news release.
About Red Pine Exploration Inc.
Red Pine Exploration Inc. is a gold and base-metals exploration company headquartered in Toronto, Ontario, Canada. The Company's common shares trade on the TSX Venture Exchange under the symbol "RPX".
Red Pine has a 60% interest in the Wawa Gold Project with Citabar LLP. holding the remaining 40% interest. Red Pine is the Operating Manager of the Project and is focused on expanding the existing gold resource on the property.
For more information about the Company visit www.redpineexp.com.
Or contact:
Quentin Yarie, President & CEO, (416) 364-7024, qyarie@redpineexp.com
Or Mia Boiridy, Investor Relations, (416) 364-7024, mboiridy@redpineexp.com
1Mineral Resource Statement, Surluga-Jubilee Gold Deposit, Wawa Gold Project, Ontario, SRK Consulting (Canada) Inc. (effective May 26, 2015). The report is available on www.SEDAR.com under Red Pine’s profile.
2NI 43-101 inferred resource of 1,088,000 ounces of gold at a 1.71 grams per tonne (g/t) using a 0.40 g/t gold cut-off grade for pit-constrained and 2.50 g/t gold cut-off grade for underground-constrained resources, contained in 19.82 million tonnes open along strike and at depth. The Cut-off grades are based on a gold price of US$1,250 per once and a gold recovery of 95 percent (Mineral Resource Statement, Surluga-Jubilee Gold Deposit, Wawa Gold Project, Ontario, SRK Consulting (Canada) Inc (effective May 26, 2015)).
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This News Release contains forward-looking statements. In some cases, you can identify forward-looking statements by terminology such as “may”, “should”, “expects”, “plans”, “anticipates”, “believes”, “estimates”, “predicts”, “potential” or “continue” or the negative of these terms or other comparable terminology. These statements are only predictions and involve known and unknown risks, uncertainties and other factors that may cause our or our industry’s actual results, levels of activity, performance or achievements to be materially different from any future results, levels of activity, performance or achievements expressed or implied by these forward-looking statements.
Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.
The map accompanying this announcement is available at http://www.globenewswire.com/NewsRoom/AttachmentNg/ee422322-a2dd-4587-adc3-a22926959e21