Signature Resources Announces Successful Completion of Diamond Drill Program at Its High Grade Lingman Lake Gold Property

2018-09-18 / @nasdaq

 

Major Milestone Completing First Drill Program at Lingman Lake Since Late 1980s

In Process of Selecting Core Samples to be sent to SGS for Assays

TORONTO, Sept. 18, 2018 (GLOBE NEWSWIRE) -- Signature Resources Ltd. (TSXV: SGU, OTCQB: SGGTF) ("Signature" or the "Company") is pleased to announce the successful completion of the diamond drill program at Lingman Lake. Twelve holes totaling 1,518 meters have been completed; eleven of the holes intersected significant alteration and sulphide mineralization that are typically related to the known gold-bearing mineralization at Lingman Lake.

“Visually, all of the holes intersected zones of interest. Eleven of them displayed significant alteration and mineralization which should correlate with known gold zones. Sample cutting of the core is underway and should be completed in about two weeks, after which all of the samples will be flown to SGS’ laboratory in Red Lake, Ontario, and then we wait in anticipation for the assay results”, commented Walter Hanych, President and CEO of Signature Resources.

Mr. Hanych continued, “Further I would like to thank Jacob and Samuel Drilling Ltd., its crew and management, for the successful and safe completion of the drill program under challenging conditions. We are happy that all measures to assure crews safety resulted in zero accidents and or incidents reported during the campaign.”

The drill program targeted known gold zones at various depths and strike intervals. With the completion of the drill program the focus is now on core processing. This includes: total core photography, geotechnical RQD and core recovery, geological logging, sample interval determination and core cutting.

Qualified Persons

The scientific and technical content of this press release has been prepared, reviewed and approved by John Siriunas, P.Eng., Associate Independent Consultant with Caracle Creek International Consulting Ltd., and is the program site geologist, and by Walter Hanych, P.Geo., President-CEO of Signature Resources. Both are Qualified Persons as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

About Signature

The Lingman Lake gold property consists of four free-hold patented claims and 762 single-cell staked claims. Total land package amounts to 15,372.3 hectares; 275.5 hectares of the property total include 14 mineral-rights patents. The property hosts an historic estimate of 234,684 oz of gold* (1,063,904 tonnes grading 6.86 g Au/t at a 2.73 g Au/t cut-off) and includes what has historically been referred to as the Lingman Lake Gold Mine, an underground substructure consisting of a 126.5-meter shaft and three levels of development at depths of 46 m (150 Level), 84 m (275 Level) and 122 m (400 Level).

*This historical resource estimate is based on prior data and reports obtained and prepared by previous operators, and information provided by governmental authorities. A Qualified Person has not done sufficient work to verify the classification of the mineral resource estimates in accordance with current CIM categories. The Company is not treating the historical estimate as a current NI 43-101-compliant mineral resource estimate. Establishing a current mineral resource estimate on the Lingman Lake deposit will require further evaluation, which the Company and its consultants intend to complete in due course. Additional information regarding historical resource estimates is available in the technical report entitled, “Technical Report on the Lingman Lake Property” dated December 20, 2013, prepared by Walter Hanych, P.Geo., and Frank Racicot, P.Geo., available on the Company’s SEDAR profile at www.sedar.com

To find out more about Signature Resources Limited, visit our website at www.signatureresources.ca , or contact:

Walter Hanych
Chief Executive Officer
705.445.0184

Cautionary Notes

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

This news release contains forward-looking statements which are not statements of historical fact. Forward-looking statements include estimates and statements that describe the Company’s future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as “believes”, “anticipates”, “expects”, “estimates”, “may”, “could”, “would”, “will”, or “plan”. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management’s expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company’s objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company’s public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

SGU logo 3.png

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok