VANCOUVER, British Columbia, Oct. 15, 2019 (GLOBE NEWSWIRE) -- Silvercorp Metals Inc. ("Silvercorp” or the “Company”) (TSX / NYSE American: SVM) is pleased to report results of its exploration programs from April 1, 2018 to June 30, 2019 at the LMW mine, Ying Mining District, Henan Province, China. Exploration drilling is ongoing at the LMW mine and all other mines at the Ying Mining District.
During this period, Silvercorp continued its extensive exploration programs and completed 21,272 metres (“m”) of underground diamond drilling and 3,274m of exploration tunneling at the LMW mine. Results of underground drilling continuously extended the major mineralized vein structures along strike and downdip, and exploration tunneling exposed high-grade mineralization zones within major production vein structures.
Highlights of selected drill hole intersections:
The underground drilling program is being conducted with three underground rigs from the current production levels to delineate the downdip and along-strike extensions of known mineralized vein structures in the production area and test for new veins in the previously less-explored areas.
The drilling program from April 1, 2018 to June 30, 2019 at the LMW mine is briefly summarized in the following table:
Major Target Veins | Metres Drilled | Holes Completed | Samples Collected | Holes Intersected Vein Structures | Holes Intersected Mineralization* |
LM7, LM8, LM8_4, LM12, LM16, LM17, W17W, LM25 | 21,272 | 69 | 1,057 | 67 | 26 |
*Mineralized intersection in drill holes is defined by silver equivalent value (AgEq) greater than or equal to 130 g/t.
Highlights of selected mineralization zones exposed in exploration drift tunnels:
The exploration tunneling, comprising drifting, crosscutting and raising, was driven along and across major mineralized vein structures to upgrade drill defined mineral resources and test for new parallel and splay structures. Exploration tunneling in the 2018-2019 exploration program at LMW has been mainly conducted between elevation levels 550m and 969m.
The tunneling program from April 1, 2018 to June 30, 2019 at the LMW mine is briefly summarized in the following table:
Major Target Veins | Total Tunneling (m) | Channel Samples Collected | Drift Tunneling Included (m) | Total Mineralization* Exposed by Drift Tunneling | ||||
Length (m) | Average True Width (m) | Ag (g/t) | Pb (%) | Zn (%) | ||||
LM8_4, LM8W, LM8_4_1, LM12_1, LM12E, LM14, LM16, LM17W, LM19W2, LM25, LM30, LM32, T24 | 3,274 | 1,495 | 2,549 | 708 | 0.62 | 384 | 3.98 | 0.33 |
*Mineralization is defined by silver equivalent value (AgEq) greater than or equal to 130 g/t.
Tables 1 and 2 below list the assay results of selected mineralized intersections in drill holes and mineralized zones exposed in drift tunnels in the exploration programs from April 1, 2018 to June 30, 2019.
Table 1: Selected drilling results from the drilling program at the LMW mine
Hole ID | From (m) | To (m) | Elevation (m) | Interval (m) | True Width (m) | Ag (g/t) | Pb (%) | Zn (%) | Vein | ||||||
ZKX02XY01 | 269.39 | 270.05 | 506.86 | 0.66 | 0.53 | 200 | 4.09 | 2.07 | LM25 | ||||||
ZKX02XY02 | 386.90 | 392.93 | 384.16 | 6.03 | 4.04 | 103 | 9.26 | 1.79 | LM25 | ||||||
ZKX3807 | 115.62 | 116.41 | 632.67 | 0.79 | 0.65 | 171 | 2.78 | 0.08 | LM17W1 | ||||||
334.16 | 334.40 | 450.03 | 0.24 | 0.16 | 221 | 0.98 | 0.11 | LM16 | |||||||
ZKX10911 | 468.27 | 468.75 | 533.60 | 0.48 | 0.41 | 170 | 1.35 | 0.44 | LM14 | ||||||
ZKX11113 | 228.38 | 228.72 | 950.26 | 0.34 | 0.29 | 26 | 0.08 | 0.11 | LM8 | ||||||
ZKX6301 | 150.52 | 152.34 | 724.69 | 1.82 | 0.81 | 171 | 1.42 | 0.24 | LM17W | ||||||
ZKX11111 | 135.86 | 137.20 | 634.31 | 1.34 | 0.97 | 1,211 | 11.58 | 0.92 | LM17W1 | ||||||
ZKX0914 | 68.22 | 68.82 | 748.02 | 0.60 | 0.50 | 171 | 5.62 | 1.11 | LM17W1 | ||||||
164.67 | 165.61 | 672.29 | 0.94 | 0.58 | 697 | 1.63 | 0.11 | LM17W | |||||||
8.91 | 9.81 | 1,088.27 | 0.90 | 0.44 | 345 | 2.08 | 0.08 | LM12E | |||||||
ZKX0513 | 185.43 | 187.09 | 661.41 | 1.66 | 1.36 | 859 | 4.53 | 0.31 | LM17W | ||||||
ZKX0212 | 9.24 | 9.53 | 1,087.34 | 0.29 | 0.13 | 133 | 0.79 | 0.17 | LM12E1 | ||||||
49.93 | 51.49 | 1,072.10 | 1.56 | 1.12 | 121 | 0.24 | 0.06 | LM20 | |||||||
171.12 | 171.49 | 1,026.70 | 0.37 | 0.20 | 280 | 5.38 | 0.71 | LM12 | |||||||
ZKX1301 | 109.54 | 110.16 | 732.24 | 0.62 | 0.51 | 311 | 2.24 | 0.31 | LM8_4 | ||||||
199.19 | 199.57 | 676.07 | 0.38 | 0.32 | 706 | 3.37 | 0.60 | LM17W | |||||||
ZKX0512 | 149.82 | 150.61 | 1,029.70 | 0.79 | 0.45 | 55 | 6.38 | 0.30 | LM12 | ||||||
ZKX1302 | 121.20 | 122.42 | 708.19 | 1.22 | 1.21 | 661 | 14.00 | 0.28 | LM17W2 | ||||||
136.59 | 139.42 | 696.74 | 2.83 | 1.88 | 195 | 2.48 | 0.25 | LM8_4 | |||||||
ZKX0917 | 197.20 | 197.52 | 623.42 | 0.32 | 0.21 | 148 | 4.84 | 0.16 | LM17W2 | ||||||
ZKX10505 | 397.94 | 398.45 | 411.25 | 0.51 | 0.29 | 15 | 0.03 | 0.06 | LM30W | ||||||
584.80 | 585.20 | 322.06 | 0.40 | 0.28 | 31 | 6.21 | 0.37 | LM14 | |||||||
ZKX10707 | 494.52 | 495.79 | 402.96 | 1.27 | 1.02 | 147 | 0.80 | 0.12 | LM14 | ||||||
ZKX12004 | 28.50 | 29.22 | 885.60 | 0.72 | 0.43 | 4 | 0.02 | 0.01 | LM10W1 | ||||||
ZKX10108 | 137.59 | 137.82 | 535.31 | 0.23 | 0.13 | 133 | 7.89 | 0.04 | LM30 | ||||||
320.29 | 320.64 | 429.27 | 0.35 | 0.19 | 229 | 3.95 | 8.30 | LM19W3 |
Table 2: Selected mineralized zones exposed by drift tunneling at the LMW mine
Tunnel ID | Target Vein | Level (m) | Length (m) | True Width (m) | Ag (g/t) | Pb (%) | Zn (%) | ||||
SJ969-LM12_1-550-14SYM | LM12_1 | 550 | 68.0 | 0.66 | 503 | 6.12 | 0.44 | ||||
SJ969-LM12_1-550-14NYM | LM12_1 | 550 | 9.8 | 0.40 | 141 | 5.28 | 0.19 | ||||
PD969-LM12E-969-9NYM | LM12E | 969 | 52.0 | 0.54 | 958 | 2.77 | 0.22 | ||||
XPDS-LM14-625-109SYM | LM14 | 625 | 62.0 | 0.65 | 242 | 2.36 | 0.37 | ||||
XPDS-LM14-625-109NYM | LM14 | 625 | 105.0 | 0.60 | 197 | 1.13 | 0.31 | ||||
XPDS-LM14-575-113NYM | LM14 | 575 | 7.5 | 1.56 | 88 | 4.21 | 0.26 | ||||
XPDS-LM16-725-117NYM | LM16 | 725 | 110.5 | 0.85 | 517 | 2.72 | 0.39 | ||||
XPDS-LM16-725-111SYM | LM16 | 725 | 10.0 | 0.29 | 313 | 1.08 | 0.15 | ||||
SJ969-LM19W2-550-110NYM | LM19W2 | 550 | 116.0 | 0.97 | 26 | 8.58 | 0.26 | ||||
XPDN-LM19W2-700-122NYM | LM19W2 | 700 | 10.0 | 0.39 | 880 | 9.29 | 1.40 | ||||
PD918-LM25-880-4NYM | LM25 | 880 | 30.0 | 0.56 | 247 | 2.73 | 0.17 | ||||
SJ969-LM30-600-116SYM | LM30 | 600 | 100.5 | 0.58 | 711 | 4.81 | 0.27 | ||||
PD969Shaft-LM32-550-116NYM | LM32 | 550 | 10.0 | 0.42 | 192 | 5.37 | 1.49 | ||||
PD969Shaft-LM32-600-116SYM | LM32 | 600 | 83.0 | 0.32 | 896 | 3.31 | 0.71 | ||||
PD924-LM8_4-870-108NYM | LM8_4 | 870 | 20.0 | 0.40 | 55 | 4.57 | 0.61 | ||||
PD924-LM8_4-924-104SYM | LM8_4 | 924 | 10.0 | 0.29 | 27 | 9.34 | 0.08 | ||||
PD969-LM8_4-969-102SYM | LM8_4 | 969 | 10.0 | 0.42 | 459 | 3.81 | 0.08 | ||||
PD924-LM8_4_1-870-108NYM | LM8_4_1 | 870 | 20.0 | 0.59 | 236 | 2.98 | 0.74 | ||||
XPDN-LM8W-800-108SYM | LM8W | 800 | 15.0 | 1.14 | 675 | 1.91 | 0.19 | ||||
PD924-T24-835-106NYM | T24 | 835 | 25.0 | 0.44 | 144 | 4.81 | 0.32 |
Quality Control
Drill cores are NQ size. Drill core samples, limited by apparent mineralization contact or shear/alteration contact, were split into halves by saw cutting. The half cores are stored in the Company's core shacks for future reference and checking, and the other half core samples are shipped in security-sealed bags to the Chengde Huakan 514 Geology and Minerals Test and Research Institute in Chengde, Hebei Province, China, 226km northeast of Beijing, and the Zhengzhou Nonferrous Exploration Institute Lab in Zhengzhou, Henan Province, China. Both labs are ISO9000 certified analytical labs. For analysis the sample is dried and crushed to minus 1mm and then split to a 200-300g subsample which is further pulverized to minus 200 mesh. Two subsamples are prepared from the pulverized sample. One is digested with aqua regia for gold analysis with atomic absorption spectroscopy (AAS), and the other is digested with two-acids for analysis of silver, lead, zinc, and copper with AAS.
Channel samples are collected along sample lines perpendicular to the mineralized vein structure in exploration tunnels. Spacing between sampling lines is typically 5m along strike. Both the mineralized vein and the altered wall rocks are cut with continuous chisel chipping. Sample length ranges from 0.2m to more than 1m, depending on the width of the mineralized vein and the mineralization type. Channel samples are prepared and assayed with AAS at Silvercorp’s mine laboratory (Ying Lab) located at the mill complex in Luoning County, Henan Province, China. The Ying lab is officially accredited by the Quality and Technology Monitoring Bureau of Henan Province and is qualified to provide analytical services. The channel samples are dried, crushed and pulverized. A 200g sample of minus 160 mesh is prepared for assay. A duplicate sample of minus 1mm is made and kept in the laboratory archives. Gold is analysed by fire assay with AAS finish, and silver, lead, zinc, and copper are assayed by two-acid digestion with AAS finish.
A routine quality assurance/quality control (QA/QC) procedure is adopted to monitor the analytical quality at each lab. Certified reference materials (CRMs), pulp duplicates and blanks are inserted into each lab batch of samples. QA/QC data at the lab are attached to the assay certificates for each batch of samples.
The Company maintains its own comprehensive QA/QC program to ensure best practices in sample preparation and analysis of the exploration samples. Project geologists regularly insert CRM, field duplicates and blanks to each batch of 30 core samples to monitor the sample preparation and analysis procedures at the labs. The analytical quality of the labs is further evaluated with external checks by sending about 3-5% of the pulp samples to higher level labs to check for lab bias.
Data from both the Company's and the labs' QA/QC programs are reviewed on a timely basis by project geologists.
Guoliang Ma, P. Geo., Manager of Exploration and Resource of the Company, is the Qualified Person for Silvercorp under NI 43-101 and has reviewed and given consent to the technical information contained in this news release.
About Silvercorp
Silvercorp is a profitable Canadian mining company producing silver, lead and zinc metals in concentrates from mines in China. The Company’s goal is to continuously create healthy returns to shareholders through efficient management, organic growth and the acquisition of profitable projects. Silvercorp balances profitability, social and environmental relationships, employees’ wellbeing, and sustainable development. For more information, please visit our website at www.silvercorp.ca.
For further information
Lon Shaver
Vice President
Silvercorp Metals Inc.
Phone: (604) 669-9397
Toll Free: 1(888) 224-1881
Email: investor@silvercorp.ca
Website: www.silvercorp.ca
CAUTIONARY DISCLAIMER - FORWARD LOOKING STATEMENTS
Certain of the statements and information in this press release constitute “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects”, “is expected”, “anticipates”, “believes”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategies”, “targets”, “goals”, “forecasts”, “objectives”, “budgets”, “schedules”, “potential” or variations thereof or stating that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements or information. Forward-looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral resource and mineral reserve estimates at the Company’s material properties; the sufficiency of the Company’s capital to finance the Company’s operations; estimates of the Company’s revenues and capital expenditures; estimated production from the Company’s mines in the Ying Mining District; timing of receipt of permits and regulatory approvals; availability of funds from production to finance the Company’s operations; and access to and availability of funding for future construction, use of proceeds from any financing and development of the Company’s properties.
Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks relating to: fluctuating commodity prices; calculation of resources, reserves and mineralization and precious and base metal recovery; interpretations and assumptions of mineral resource and mineral reserve estimates; exploration and development programs; feasibility and engineering reports; permits and licenses; title to properties; property interests; joint venture partners; acquisition of commercially mineable mineral rights; financing; recent market events and conditions; economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic returns of future production; integration of future acquisitions into the Company’s existing operations; competition; operations and political conditions; regulatory environment in China and Canada; environmental risks; foreign exchange rate fluctuations; insurance; risks and hazards of mining operations; key personnel; conflicts of interest; dependence on management; internal control over financial reporting as per the requirements of the Sarbanes-Oxley Act; and bringing actions and enforcing judgments under U.S. securities laws.
This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements or information. Forward-looking statements or information are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements or information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company’s Annual Information Form for the year ended March 31, 2019 under the heading “Risk Factors”. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.
The Company’s forward-looking statements and information are based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking statements and information if circumstances or management’s assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking statements and information.