Skeena Expands 23 Zone to Surface at Eskay Creek Intersecting 1.20 g/t AuEq over 96.02 metres

2022-10-25 / @accesswire

 

VANCOUVER, BC / ACCESSWIRE / October 25, 2022 / Skeena Resources Limited (TSX:SKE)(NYSE:SKE) ("Skeena" or the "Company") is pleased to announce drilling results from the 2022 regional and near mine exploration programs at the Eskay Creek gold-silver Project ("Eskay Creek" or the "Project") in the Golden Triangle of British Columbia. Analytical results and reference images from the recently completed drill holes are presented at the end of this release as well as on the Company's website. Additional results will be reported once available.

New 2022 Drilling Highlights:

  • 1.94 g/t Au, 32.3 g/t Ag (2.30 g/t AuEq) over 26.50 m (SK-22-1069)
  • 2.59 g/t Au, 7.9 g/t Ag (2.68 g/t AuEq) over 21.00 m (SK-22-1069)
  • 0.98 g/t Au, 6.4 g/t Ag (1.05 g/t AuEq) over 29.87 m (SK-22-1069)
  • 1.97 g/t Au, 9.3 g/t Ag (2.07 g/t AuEq) over 13.56 m (SK-22-1069)
  • 1.12 g/t Au, 4.7 g/t Ag (1.17 g/t AuEq) over 109.82 m (SK-22-1071)
  • 1.13 g/t Au, 6.6 g/t Ag (1.20 g/t AuEq) over 96.02 m (SK-22-1090)

Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 90]. True widths and zone geometries cannot be definitively determined at this time. Grade-capping of individual assays has not been applied to the Au and Ag assays informing the length-weighted AuEq composites. Metallurgical processing recoveries have not been applied to the AuEq calculation and are taken at 100%. Samples below detection limit were nulled to a value of zero.

23 Zone Mineralization Expands to Surface

Infill drill hole SK-22-1090 successfully confirmed the continuity of gold-silver mineralization in the 23 Zone and has expanded mineralization to surface intersecting 1.13 g/t Au, 6.6 g/t Ag (1.20 g/t AuEq) over 96.02 m. This newly drilled mineralization demonstrates excellent downhole continuity but most importantly has extended mineralization to surface, which will have a potentially positive impact on the future open-pit strip ratio once the updated resource and engineering studies are completed. Additional drillholes targeting the surficial mineralization will be planned for future drilling campaigns.

Multiple New Intersections Discovered in 21A West Zone

Highlighted by recently completed exploratory drill hole SK-22-1071, a very wide interval of continuous dacite hosted gold-silver mineralization was intersected grading 1.12 g/t Au, 4.7 g/t Ag (1.17 g/t AuEq) over 109.82 m. This new occurrence of feeder style mineralization occurs 150 metres vertically below surface and below the current engineered pit. Due to the wide spacings of exploratory holes drilled to date, it is currently unclear if this mineralization is an extension of the 21A West Zone or if it represents a new dacite hosted replacement discovery analogous to the 23 Zone.

Situated 70 metres along strike to the southeast of SK-22-1071, numerous rhyolite and dacite hosted gold-silver intersections were encountered by SK-22-1069 over the length of the drillhole including 1.94 g/t Au, 32.3 g/t Ag (2.30 g/t AuEq) over 26.50 m, 2.59 g/t Au, 7.9 g/t Ag (2.68 g/t AuEq) over 21.00 m and 0.98 g/t Au, 6.4 g/t Ag (1.05 g/t AuEq) over 29.87 m. Based upon currently defined zone geometries, these occurrences are likely a combination of 21A West feeder style mineralization and possibly the dacite hosted mineralization uncovered in SK-22-1071.

Additional new mineralization was also discovered in the Even Lower Mudstone via SK-22-1069 which averaged 1.97 g/t Au, 9.3 g/t Ag (2.07 g/t AuEq) over 13.56 m including the high tenor subinterval grading 11.55 g/t Au, 25 g/t Ag (11.83 g/t AuEq) over 1.19 m.

Skeena Resources Limited, Monday, September 26, 2022, Press release picture

About Skeena

Skeena Resources Limited is a Canadian mining exploration and development company focused on revitalizing the past-producing Eskay Creek gold-silver mine located in Tahltan Territory in the Golden Triangle of northwest British Columbia, Canada. The Company released a Feasibility Study for Eskay Creek in September 2022 which highlights an open-pit average grade of 4.00 g/t AuEq, an after-tax NPV5% of C$1.4B, 50% IRR, and a 1-year payback at US$1,700/oz Au and US$19/oz Ag. Skeena is currently continuing exploration drilling at Eskay Creek.

On behalf of the Board of Directors of Skeena Resources Limited,

Walter Coles Jr.
CEO & Director

Contact Information
Investor Inquiries: info@skeenaresources.com
Office Phone: +1 604 684 8725
Company Website: www.skeenaresources.com

Qualified Persons

Exploration activities at the Eskay Creek Project are administered on site by the Company's Exploration Managers, Raegan Markel, P.Geo. and Director of Exploration, Adrian Newton P.Geo. In accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Senior Vice President Exploration and Resource Development, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting the exploration activities on its projects.

Quality Assurance - Quality Control

Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently securely stored on site. Numbered security tags are applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC) samples at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company's Qualified Person, Paul Geddes, P.Geo, Vice President Exploration and Resource Development.

Drill core samples are submitted to ALS Geochemistry's analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed and 1 kg is pulverized. Analysis for gold is by 50 g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 50 g fire assay fusion with gravimetric finish. Analysis for silver is by 50 g fire assay fusion with gravimetric finish with a lower limit of 5ppm and upper limit of 10,000 ppm. Samples with silver assays greater than 10,000 ppm are re-analyzed using a gravimetric silver concentrate method. A selected number of samples are also analyzed using a 48 multi-element geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS) and also for mercury using an aqua regia digest with Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) finish. Samples with sulfur reporting greater than 10% from the multi-element analysis are re-analyzed for total sulfur by Leco furnace and infrared spectroscopy.

Cautionary note regarding forward-looking statements

Certain statements and information contained or incorporated by reference in this news release constitute "forward-looking information" and "forward-looking statements" within the meaning of applicable Canadian and United States securities legislation (collectively, "forward-looking statements"). These statements relate to future events or our future performance. The use of words such as "anticipates", "believes", "proposes", "contemplates", "generates", "targets", "is projected", "is planned", "considers", "estimates", "expects", "is expected", "potential" and similar expressions, or statements that certain actions, events or results "may", "might", "will", "could", or "would" be taken, achieved, or occur, may identify forward-looking statements. All statements other than statements of historical fact are forward-looking statements. Specific forward-looking statements contained herein include, but are not limited to, statements regarding the results of the Feasibility Study, processing capacity of the mine, anticipated mine life, probable reserves, estimated project capital and operating costs, sustaining costs, results of test work and studies, planned environmental assessments, the future price of metals, metal concentrate, and future exploration and development. Such forward-looking statements are based on material factors and/or assumptions which include, but are not limited to, the estimation of mineral resources and reserves, the realization of resource and reserve estimates, metal prices, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes and the assumptions set forth herein and in the Company's MD&A for the year ended December 31, 2021, its most recently filed interim MD&A, and the Company's Annual Information Form ("AIF") dated March 31, 2022. Such forward-looking statements represent the Company's management expectations, estimates and projections regarding future events or circumstances on the date the statements are made, and are necessarily based on several estimates and assumptions that, while considered reasonable by the Company as of the date hereof, are not guarantees of future performance. Actual events and results may differ materially from those described herein, and are subject to significant operational, business, economic, and regulatory risks and uncertainties. The risks and uncertainties that may affect the forward-looking statements in this news release include, among others: the inherent risks involved in exploration and development of mineral properties, including permitting and other government approvals; changes in economic conditions, including changes in the price of gold and other key variables; changes in mine plans and other factors, including accidents, equipment breakdown, bad weather and other project execution delays, many of which are beyond the control of the Company; environmental risks and unanticipated reclamation expenses; and other risk factors identified in the Company's MD&A for the year ended December 31, 2021, its most recently filed interim MD&A, the AIF dated March 31, 2022, and in the Company's other periodic filings with securities and regulatory authorities in Canada and the United States that are available on SEDAR at www.sedar.com or on EDGAR at www.sec.gov.

Readers should not place undue reliance on such forward-looking statements. Any forward-looking statement speaks only as of the date on which it is made and Company does not undertake any obligations to update and/or revise any forward-looking statements except as required by applicable securities laws.

Cautionary note to U.S. Investors concerning estimates of mineral reserves and mineral resources

Skeena's mineral reserves and mineral resources included or incorporated by reference herein have been estimated in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") as required by Canadian securities regulatory authorities, which differ from the requirements of U.S. securities laws. The terms "mineral reserve", "proven mineral reserve", "probable mineral reserve", "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are Canadian mining terms as defined in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") "CIM Definition Standards - For Mineral Resources and Mineral Reserves" adopted by the CIM Council (as amended, the "CIM Definition Standards"). These standards differ significantly from the mineral property disclosure requirements of the U.S. Securities and Exchange Commission in Regulation S-K Subpart 1300 (the "SEC Modernization Rules"). Skeena is not currently subject to the SEC Modernization Rules. Accordingly, Skeena's disclosure of mineralization and other technical information may differ significantly from the information that would be disclosed had Skeena prepared the information under the standards adopted under the SEC Modernization Rules.

In addition, investors are cautioned not to assume that any part or all of Skeena's mineral resources constitute or will be converted into reserves. These terms have a great amount of uncertainty as to their economic and legal feasibility. Accordingly, investors are cautioned not to assume that any "measured", "indicated", or "inferred" mineral resources that Skeena reports are or will be economically or legally mineable. Further, "inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an "inferred mineral resource" will ever be upgraded to a higher category. Under Canadian securities laws, estimates of "inferred mineral resources" may not form the basis of feasibility or prefeasibility studies, except in rare cases where permitted under NI 43-101.

For these reasons, the mineral reserve and mineral resource estimates and related information presented herein may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the U.S. federal securities laws and the rules and regulations thereunder.

Skeena Resources Limited, Tuesday, October 25, 2022, Press release pictureSkeena Resources Limited, Tuesday, October 25, 2022, Press release pictureSkeena Resources Limited, Tuesday, October 25, 2022, Press release picture

Table 1: Eskay Creek Project 2022 Exploratory Drilling Campaign Length-Weighted Drill Hole Composites:

Hole-IDFrom (m)To (m)Sample Length (m)Au (g/t)Ag (g/t)AuEq (g/t)

SK-22-1056

16.88

17.50

0.62

0.31

0.3

0.31

SK-22-1056

29.22

32.83

3.61

0.36

3.1

0.39

SK-22-1056

44.14

48.66

4.52

0.72

107.0

1.92

SK-22-1056

78.70

79.46

0.76

0.34

3.9

0.38

SK-22-1056

89.00

90.50

1.50

0.30

10.5

0.42

SK-22-1056

96.50

98.00

1.50

0.33

1.7

0.35

SK-22-1056

105.50

108.50

3.00

0.43

3.8

0.47

SK-22-1056

116.00

129.50

13.50

0.42

2.5

0.44

SK-22-1056

138.77

142.50

3.73

0.56

9.9

0.67

SK-22-1057

9.50

16.80

7.30

0.99

47.1

1.52

SK-22-1057

25.12

30.20

5.08

0.56

33.6

0.94

SK-22-1058

7.18

13.00

5.82

0.46

16.9

0.65

SK-22-1058

20.50

50.00

29.50

0.46

6.9

0.53

SK-22-1058

59.00

66.50

7.50

0.25

2.5

0.28

SK-22-1058

93.50

99.50

6.00

0.24

1.2

0.25

SK-22-1058

109.50

154.00

44.50

0.40

4.3

0.44

SK-22-1058

163.00

175.40

12.40

0.78

5.5

0.84

SK-22-1059

23.65

25.00

1.35

0.36

0.5

0.36

SK-22-1059

36.50

38.00

1.50

0.29

1.1

0.30

SK-22-1059

44.70

68.45

23.75

0.40

3.6

0.44

SK-22-1059

74.00

75.50

1.50

0.41

0.5

0.41

SK-22-1059

97.50

99.00

1.50

1.16

0.5

1.16

SK-22-1059

124.50

129.00

4.50

0.30

4.0

0.35

SK-22-1060

0.70

15.20

14.50

1.03

5.7

1.10

SK-22-1060

22.00

27.00

5.00

0.32

4.1

0.37

SK-22-1060

47.50

56.00

8.50

0.45

0.7

0.46

SK-22-1060

62.50

65.50

3.00

0.32

0.4

0.32

SK-22-1060

71.47

72.75

1.28

0.58

0.7

0.59

SK-22-1060

80.00

81.00

1.00

0.46

0.3

0.46

SK-22-1060

96.67

98.00

1.33

4.29

15.4

4.46

SK-22-1060

121.00

122.36

1.36

0.36

2.0

0.38

SK-22-1061

62.45

90.50

28.05

1.54

1.5

1.56

Including

78.00

79.00

1.00

13.00

13.0

13.17

SK-22-1061

120.00

121.50

1.50

2.47

2.5

2.50

SK-22-1062

0.07

30.00

29.93

1.03

4.3

1.08

SK-22-1062

54.50

68.93

14.43

0.59

2.1

0.61

SK-22-1062

85.37

89.00

3.63

0.30

2.3

0.32

SK-22-1062

99.21

103.00

3.79

0.23

0.6

0.23

SK-22-1062

111.00

112.50

1.50

0.41

0.5

0.41

SK-22-1063

68.50

69.55

1.05

0.35

0.5

0.36

SK-22-1063

99.70

104.20

4.50

0.60

1.9

0.62

SK-22-1063

121.75

128.00

6.25

0.46

3.0

0.49

SK-22-1063

142.50

144.00

1.50

0.42

3.2

0.46

SK-22-1063

149.74

158.25

8.51

0.40

3.7

0.44

SK-22-1063

182.12

222.00

39.88

0.47

43.7

0.97

SK-22-1064

PENDING

SK-22-1065

124.10

144.00

19.90

0.88

7.9

0.97

SK-22-1065

194.50

202.00

7.50

0.28

2.9

0.31

SK-22-1065

207.50

216.50

9.00

0.18

528.0

6.11

Including

209.00

212.00

3.00

0.14

1505.0

17.05

SK-22-1065

223.47

227.00

3.53

0.33

5.1

0.39

SK-22-1066

140.10

141.95

1.85

0.35

1.2

0.36

SK-22-1066

158.50

164.00

5.50

0.24

13.5

0.39

SK-22-1066

172.69

173.90

1.21

0.91

46.1

1.43

SK-22-1066

228.50

251.50

23.00

0.40

3.6

0.44

SK-22-1066

256.95

265.45

8.50

1.46

10.2

1.57

SK-22-1066

328.48

329.15

0.67

0.31

1.4

0.33

SK-22-1067

60.00

73.50

13.50

0.37

4.5

0.42

SK-22-1067

132.80

142.95

10.15

0.67

2.2

0.70

SK-22-1067

159.00

160.50

1.50

0.48

1.4

0.50

SK-22-1068

55.50

61.50

6.00

1.26

32.3

1.62

SK-22-1068

125.00

166.50

41.50

0.76

3.6

0.80

SK-22-1068

268.00

281.50

13.50

0.48

1.0

0.49

SK-22-1068

290.50

295.00

4.50

0.28

0.5

0.29

SK-22-1069

8.00

12.50

4.50

0.46

4.2

0.51

SK-22-1069

18.50

45.00

26.50

1.94

32.3

2.30

SK-22-1069

57.50

78.50

21.00

2.59

7.9

2.68

Including

71.00

72.00

1.00

23.20

14.2

23.36

and

73.00

74.00

1.00

13.00

14.5

13.16

SK-22-1069

89.00

100.50

11.50

0.56

3.5

0.60

SK-22-1069

106.50

121.00

14.50

0.68

0.5

0.68

SK-22-1069

127.00

156.87

29.87

0.98

6.4

1.05

SK-22-1069

237.65

251.21

13.56

1.97

9.3

2.07

INCLUDING

244.31

245.50

1.19

11.55

25.1

11.83

SK-22-1070

32.00

63.00

31.00

0.50

8.2

0.59

SK-22-1070

68.50

81.54

13.04

0.71

4.3

0.75

SK-22-1070

89.75

154.50

64.75

0.42

1.6

0.44

SK-22-1070

183.50

192.00

8.50

0.31

0.6

0.31

SK-22-1070

246.00

247.50

1.50

0.43

2.8

0.46

SK-22-1070

271.50

274.50

3.00

0.42

4.9

0.47

SK-22-1070

280.50

282.00

1.50

0.37

2.4

0.40

SK-22-1070

333.50

341.00

7.50

0.36

1.9

0.38

SK-22-1070

363.00

370.50

7.50

0.24

0.5

0.24

SK-22-1070

378.00

379.50

1.50

0.45

0.5

0.45

SK-22-1070

393.00

394.50

1.50

0.50

0.5

0.50

SK-22-1070

406.50

408.00

1.50

0.34

0.5

0.34

SK-22-1071

10.84

16.00

5.16

0.61

13.0

0.76

SK-22-1071

35.50

63.27

27.77

0.76

7.4

0.84

SK-22-1071

70.50

85.50

15.00

0.27

4.0

0.31

SK-22-1071

93.00

110.50

17.50

0.38

1.1

0.40

SK-22-1071

141.00

144.00

3.00

0.58

0.8

0.58

SK-22-1071

159.18

269.00

109.82

1.12

4.7

1.17

SK-22-1071

275.00

286.50

11.50

0.53

1.0

0.53

SK-22-1072

PENDING

SK-22-1073

PENDING

SK-22-1074

83.55

84.55

1.00

0.28

2.1

0.30

SK-22-1075

20.00

24.50

4.50

0.56

2.0

0.59

SK-22-1075

31.00

32.00

1.00

0.65

1.3

0.66

SK-22-1075

101.50

107.00

5.50

0.42

0.5

0.42

SK-22-1075

126.50

128.00

1.50

0.78

0.5

0.78

SK-22-1075

142.12

144.50

2.38

0.83

0.5

0.83

SK-22-1076

0.10

2.50

2.40

0.72

2.7

0.75

SK-22-1076

12.00

14.67

2.67

0.25

3.6

0.29

SK-22-1076

23.47

26.91

3.44

0.99

12.9

1.13

SK-22-1076

36.00

49.11

13.11

0.54

3.5

0.58

SK-22-1076

81.00

84.00

3.00

1.50

5.2

1.55

SK-22-1076

97.50

111.28

13.78

1.09

2.6

1.12

SK-22-1077

PENDING

SK-22-1078

PENDING

SK-22-1079

5.15

14.70

9.55

0.52

9.0

0.62

SK-22-1079

33.87

36.29

2.42

0.28

4.1

0.32

SK-22-1079

46.80

47.67

0.87

0.48

4.7

0.53

SK-22-1079

69.10

119.00

49.90

0.61

16.6

0.80

SK-22-1079

143.50

144.98

1.48

0.44

1.9

0.46

SK-22-1079

167.00

168.50

1.50

0.37

0.5

0.37

SK-22-1080

PENDING

SK-22-1081

PENDING

SK-22-1082

7.33

19.90

12.57

1.94

5.8

2.00

SK-22-1082

42.85

52.95

10.10

0.91

8.5

1.00

SK-22-1082

91.50

92.18

0.68

0.39

2.9

0.42

SK-22-1082

114.79

127.00

12.21

0.32

6.1

0.38

SK-22-1082

142.00

143.93

1.93

2.27

2.2

2.30

SK-22-1082

181.00

182.50

1.50

1.49

0.5

1.49

SK-22-1083

PENDING

SK-22-1084

PENDING

SK-22-1085

80.00

104.00

24.00

0.61

4.2

0.65

SK-22-1085

128.50

130.00

1.50

0.43

0.7

0.44

SK-22-1085

142.00

158.50

16.50

0.53

1.8

0.55

SK-22-1086

PENDING

SK-22-1087

PENDING

SK-22-1088

PENDING

SK-22-1089

PENDING

SK-22-1090

1.48

97.50

96.02

1.13

6.6

1.20

SK-22-1090

105.00

115.50

10.50

0.42

1.9

0.44

SK-22-1090

132.00

133.00

1.00

0.41

0.5

0.41

SK-22-1090

187.00

226.50

39.50

0.79

7.3

0.87

Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 90]. True widths and zone geometries cannot be definitively determined at this time. Grade-capping of individual assays has not been applied to the Au and Ag assays informing the length-weighted AuEq composites. Metallurgical processing recoveries have not been applied to the AuEq calculation and are taken at 100%. Samples below detection limit were nulled to a value of zero.

Table 2: Mine Grid Drill Hole Locations and Orientations:

Hole-IDEasting (m)Northing (m)Elevation (m)Length (m)Azimuth (°)Dip (°)

SK-22-1056

9983.4

9721.5

988.3

156.0

74.9

-70.1

SK-22-1057

9985.3

9718.9

988.9

30.2

112.2

-49.9

SK-22-1058

9983.9

9718.4

988.9

178.0

157.1

-60.3

SK-22-1059

9979.5

9719.2

988.9

133.0

276.7

-65.2

SK-22-1060

9992.1

8940.3

970.7

157.0

337.0

-50.1

SK-22-1061

9995.9

8936.9

970.9

132.0

97.2

-59.9

SK-22-1062

9992.3

8939.1

970.9

127.5

277.2

-85.1

SK-22-1063

9845.7

9551.8

1074.6

231.0

47.1

-65.1

SK-22-1065

9845.0

9548.6

1075.3

227.0

176.7

-60.0

SK-22-1066

9843.1

9548.9

1075.1

338.0

216.8

-50.1

SK-22-1067

9840.8

9552.6

1074.3

225.0

277.3

-54.9

SK-22-1068

9841.6

9552.1

1074.4

348.0

277.3

-69.9

SK-22-1069

9882.4

9716.9

1028.9

300.5

277.1

-50.0

SK-22-1070

9882.8

9716.6

1028.7

412.5

277.2

-65.0

SK-22-1071

9882.8

9716.0

1028.6

300.4

297.0

-55.1

SK-22-1074

9966.8

9092.3

965.6

112.0

122.3

-50.1

SK-22-1075

9978.8

8838.0

998.2

151.5

137.0

-88.9

SK-22-1076

9975.9

8841.4

997.5

127.0

137.0

-49.7

SK-22-1079

10051.3

9625.1

1014.4

203.0

257.0

-60.1

SK-22-1082

10055.4

9624.3

1014.5

203.0

97.0

-50.3

SK-22-1085

9796.7

9928.2

1052.3

169.5

257.1

-50.0

SK-22-1090

10129.7

10004.0

984.4

232.5

208.9

-74.0

SOURCE: Skeena Resources Limited



View source version on accesswire.com:
https://www.accesswire.com/722089/Skeena-Expands-23-Zone-to-Surface-at-Eskay-Creek-Intersecting-120-gt-AuEq-over-9602-metres

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok