VANCOUVER, British Columbia, Feb. 28, 2022 (GLOBE NEWSWIRE) -- Solaris Resources Inc. (TSX: SLS; OTCQB: SLSSF) (“Solaris" or the “Company") is pleased to report assay results from a series of additional holes from mineral resource growth drilling at its Warintza Project (“Warintza” or “the Project”) in southeastern Ecuador.
Highlights are listed below, with corresponding images in Figures 1-3 and detailed results in Tables 1-2. A dynamic 3D model is available on the Company’s website (link provided below).
Highlights
Additional holes have enlarged the drill defined envelope of mineralization at Warintza Central, with the highest-grade intersection reported to date building on an emerging near surface, high-grade extension to the northeast that remains open, as well as to the south and southeast.
Drilling Returns Highest Grades Reported to Date in Emerging Northeast Extension that Remains Open:
Drilling Extends Mineralization to Southeast that Remains Open:
To date, 58 holes have been completed at Warintza Central with assays reported for 49 of these.
Updated Warintza Central Mineral Resource expected to be issued in late Q1 2022 / early Q2 2022.
Mr. Jorge Fierro, Vice President, Exploration, commented: “The initial resource growth drilling program for Warintza Central has been completed which will inform the updated mineral resource estimate. With this intensive program behind us, the focus of ongoing drilling has turned to pursuing the further extensions of near-surface, high-grade mineralization which remain open, with additional platforms allowing for more aggressive step-outs under construction.”
Figure 1 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/f511c652-e366-4bcf-a563-adb99fd08c56
Figure 2 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/ac5af1b9-8d36-4d00-b64e-a22750c5dae0
Figure 3 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/a4d29c8e-8b40-4bd2-a3ea-c7ea132c0827
Table 1 – Assay Results
Hole ID | Date Reported | From (m) | To (m) | Interval (m) | Cu (%) | Mo (%) | Au (g/t) | CuEq¹ (%) | ||
SLS-49 | Feb 28, 2022 | 50 | 867 | 817 | 0.50 | 0.02 | 0.04 | 0.60 | ||
Including | 50 | 446 | 396 | 0.59 | 0.02 | 0.04 | 0.70 | |||
SLS-48 | 50 | 902 | 852 | 0.45 | 0.02 | 0.05 | 0.56 | |||
Including | 50 | 150 | 100 | 1.39 | 0.03 | 0.20 | 1.64 | |||
SLS-47 | 48 | 859 | 811 | 0.41 | 0.02 | 0.05 | 0.51 | |||
Including | 48 | 494 | 446 | 0.55 | 0.03 | 0.06 | 0.70 | |||
SLS-46 | 48 | 680 | 632 | 0.27 | 0.01 | 0.03 | 0.31 | |||
Including | 48 | 216 | 168 | 0.61 | 0.02 | 0.04 | 0.69 | |||
SLS-45 | 44 | 608 | 564 | 0.37 | 0.01 | 0.03 | 0.41 | |||
Including | 44 | 280 | 236 | 0.51 | 0.01 | 0.03 | 0.56 | |||
SLS-44 | 6 | 524 | 518 | 0.16 | 0.05 | 0.03 | 0.35 | |||
Including | 44 | 376 | 332 | 0.18 | 0.06 | 0.03 | 0.40 | |||
SLS-43 | 138 | 350 | 212 | 0.17 | 0.03 | 0.03 | 0.30 | |||
SLS-42 | 52 | 958 | 906 | 0.42 | 0.02 | 0.06 | 0.53 | |||
Including | 52 | 792 | 740 | 0.48 | 0.02 | 0.07 | 0.60 | |||
Including | 52 | 692 | 640 | 0.51 | 0.02 | 0.07 | 0.63 | |||
SLSS-01 | Jan 18, 2022 | 0 | 755 | 755 | 0.28 | 0.02 | 0.02 | 0.36 | ||
SLS-41 | Dec 14, 2021 | 0 | 592 | 592 | 0.42 | 0.02 | 0.06 | 0.52 | ||
SLS-40 | 8 | 1056 | 1048 | 0.39 | 0.01 | 0.03 | 0.46 | |||
SLS-39 | 28 | 943 | 915 | 0.49 | 0.01 | 0.04 | 0.56 | |||
SLS-38 | 58 | 880 | 822 | 0.28 | 0.01 | 0.05 | 0.35 | |||
SLS-37 | 28 | 896 | 868 | 0.39 | 0.05 | 0.05 | 0.58 | |||
SLS-36 | Nov 15, 2021 | 2 | 1082 | 1080 | 0.33 | 0.01 | 0.04 | 0.41 | ||
SLS-35 | 48 | 968 | 920 | 0.53 | 0.02 | 0.04 | 0.62 | |||
SLS-34 | Oct 25, 2021 | 52 | 712 | 660 | 0.36 | 0.02 | 0.06 | 0.47 | ||
SLS-33 | 40 | 762 | 722 | 0.55 | 0.03 | 0.05 | 0.69 | |||
SLSE-02 | 0 | 1160 | 1160 | 0.20 | 0.01 | 0.04 | 0.25 | |||
SLS-32 | Oct 12, 2021 | 0 | 618 | 618 | 0.38 | 0.02 | 0.05 | 0.48 | ||
SLS-31 | 8 | 1008 | 1000 | 0.68 | 0.02 | 0.07 | 0.81 | |||
SLS-30 | 2 | 374 | 372 | 0.57 | 0.06 | 0.06 | 0.82 | |||
SLSE-01 | Sep 27, 2021 | 0 | 1213 | 1213 | 0.21 | 0.01 | 0.03 | 0.28 | ||
SLS-29 | Sep 7, 2021 | 6 | 1190 | 1184 | 0.58 | 0.02 | 0.05 | 0.68 | ||
SLS-28 | 6 | 638 | 632 | 0.51 | 0.04 | 0.06 | 0.68 | |||
SLS-27 | 22 | 484 | 462 | 0.70 | 0.04 | 0.08 | 0.91 | |||
SLS-26 | July 7, 2021 | 2 | 1002 | 1000 | 0.51 | 0.02 | 0.04 | 0.60 | ||
SLS-25 | 62 | 444 | 382 | 0.62 | 0.03 | 0.08 | 0.77 | |||
SLS-24 | 10 | 962 | 952 | 0.53 | 0.02 | 0.04 | 0.62 | |||
SLS-19 | 6 | 420 | 414 | 0.21 | 0.01 | 0.06 | 0.31 | |||
SLS-23 | May 26, 2021 | 10 | 558 | 548 | 0.31 | 0.02 | 0.06 | 0.42 | ||
SLS-22 | 86 | 324 | 238 | 0.52 | 0.03 | 0.06 | 0.68 | |||
SLS-21 | 2 | 1031 | 1029 | 0.63 | 0.02 | 0.04 | 0.73 | |||
SLS-20 | April 19, 2021 | 18 | 706 | 688 | 0.35 | 0.04 | 0.05 | 0.51 | ||
SLS-18 | 78 | 875 | 797 | 0.62 | 0.05 | 0.06 | 0.83 | |||
SLS-17 | 12 | 506 | 494 | 0.39 | 0.02 | 0.06 | 0.50 | |||
SLS-16 | Mar 22, 2021 | 20 | 978 | 958 | 0.63 | 0.03 | 0.06 | 0.77 | ||
SLS-15 | 2 | 1231 | 1229 | 0.48 | 0.01 | 0.04 | 0.56 | |||
SLS-14 | 0 | 922 | 922 | 0.79 | 0.03 | 0.08 | 0.94 | |||
SLS-13 | Feb 22, 2021 | 6 | 468 | 462 | 0.80 | 0.04 | 0.09 | 1.00 | ||
SLS-12 | 22 | 758 | 736 | 0.59 | 0.03 | 0.07 | 0.74 | |||
SLS-11 | 6 | 694 | 688 | 0.39 | 0.04 | 0.05 | 0.57 | |||
SLS-10 | 2 | 602 | 600 | 0.83 | 0.02 | 0.12 | 1.00 | |||
SLS-09 | 122 | 220 | 98 | 0.60 | 0.02 | 0.04 | 0.71 | |||
SLSW-01 | Feb 16, 2021 | 32 | 830 | 798 | 0.25 | 0.02 | 0.02 | 0.31 | ||
SLS-08 | Jan 14, 2021 | 134 | 588 | 454 | 0.51 | 0.03 | 0.03 | 0.62 | ||
SLS-07 | 0 | 1067 | 1067 | 0.49 | 0.02 | 0.04 | 0.60 | |||
SLS-06 | Nov 23, 2020 | 8 | 892 | 884 | 0.50 | 0.03 | 0.04 | 0.62 | ||
SLS-05 | 18 | 936 | 918 | 0.43 | 0.01 | 0.04 | 0.50 | |||
SLS-04 | 0 | 1004 | 1004 | 0.59 | 0.03 | 0.05 | 0.71 | |||
SLS-03 | Sep 28, 2020 | 4 | 1014 | 1010 | 0.59 | 0.02 | 0.10 | 0.71 | ||
SLS-02 | 0 | 660 | 660 | 0.79 | 0.03 | 0.10 | 0.97 | |||
SLS-01 | Aug 10, 2020 | 1 | 568 | 567 | 0.80 | 0.04 | 0.10 | 1.00 | ||
Notes to table: True widths cannot be determined at this time. |
Table 2 - Collar Location
Hole ID | Easting | Northing | Elevation (m) | Depth (m) | Azimuth (degrees) | Dip (degrees) |
SLS-49 | 800383 | 9648303 | 1412 | 867 | 135 | -73 |
SLS-48 | 800178 | 9648285 | 1439 | 1056 | 180 | -60 |
SLS-47 | 799968 | 9648102 | 1510 | 859 | 135 | -72 |
SLS-46 | 800126 | 9648032 | 1566 | 882 | 125 | -70 |
SLS-45 | 800258 | 9648097 | 1559 | 969 | 117 | -70 |
SLS-44 | 799968 | 9648102 | 1510 | 676 | 0 | -75 |
SLS-43 | 799870 | 9648315 | 1414 | 761 | 110 | -75 |
SLS-42 | 800383 | 9648303 | 1412 | 1061 | 55 | -80 |
Notes to table: The coordinates are in WGS84 17S Datum. |
(1) No adjustments were made for recovery as the project is an early-stage exploration project and metallurgical data to allow for estimation of recoveries is not yet available. Solaris defines copper equivalent calculation for reporting purposes only. Copper-equivalence calculated as: CuEq (%) = Cu (%) + 3.33 × Mo (%) + 0.73 × Au (g/t), utilizing metal prices of Cu - US$3.00/lb, Mo - US$10.00/lb and Au - US$1,500/oz.
Technical Information and Quality Control & Quality Assurance
Sample assay results have been independently monitored through a quality control/quality assurance (“QA/QC”) program that includes the insertion of blind certified reference materials (standards), blanks and field duplicate samples. Logging and sampling are completed at a secured Company facility located in Quito, Ecuador. Drill core is cut in half on site and samples are securely transported to ALS Labs in Quito. Sample pulps are sent to ALS Labs in Lima, Peru and Vancouver, Canada for analysis. Total copper and molybdenum contents are determined by four-acid digestion with AAS finish. Gold is determined by fire assay of a 30-gram charge. In addition, selected pulp check samples are sent to Bureau Veritas lab in Lima, Peru. Both ALS Labs and Bureau Veritas lab are independent of Solaris. Solaris is not aware of any drilling, sampling, recovery or other factors that could materially affect the accuracy or reliability of the data referred to herein. ZTEM data quality was validated by a qualified external professional using data validation procedures under high industry standards, and the Company therefore did not deem it necessary to have such ZTEM data verified by a Qualified Person. Analytical data for the surface samples collected are from recent interpretations derived from ZTEM data and from previous operators as detailed in the technical report entitled, “Resource Estimate of the Warintza Central Cu-Mo Porphyry Deposit" prepared by Equity Exploration Consultants Inc. with an effective date of December 13, 2019, and available on the Company’s SEDAR profile and website. The drillhole data has been verified by Jorge Fierro, M.Sc., DIC, PG, using data validation and quality assurance procedures under high industry standards.
Qualified Person
The scientific and technical content of this press release has been reviewed and approved by Jorge Fierro, M.Sc., DIC, PG, Vice President Exploration of Solaris who is a “Qualified Person” as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects. Jorge Fierro is a Registered Professional Geologist through the SME (registered member #4279075).
On behalf of the Board of Solaris Resources Inc.
“Daniel Earle”
President & CEO, Director
For Further Information
Jacqueline Wagenaar, VP Investor Relations
Direct: 416-366-5678 Ext. 203
Email: jwagenaar@solarisresources.com
About Solaris Resources Inc.
Solaris is advancing a portfolio of copper and gold assets in the Americas, which includes: a high-grade resource with expansion and additional discovery potential at the Warintza copper and gold project in Ecuador; discovery potential on the grass-roots Tamarugo project in Chile and Capricho and Paco Orco projects in Peru; exposure to US$130M spending / 5-yrs through a farm-out agreement with Freeport-McMoRan on the Ricardo Project in Chile; and significant leverage to increasing copper prices through its 60%-interest in the La Verde joint-venture project with Teck Resources in Mexico.
Cautionary Notes and Forward-looking Statements
This document contains certain forward-looking information and forward-looking statements within the meaning of applicable securities legislation (collectively “forward-looking statements”). The use of the words “will” and “expected” and similar expressions are intended to identify forward-looking statements. These statements include statements that additional holes have enlarged the drill defined envelope of mineralization at Warintza Central, with the highest-grade intersection reported to date building on an emerging near surface, high-grade extension to the northeast that remains open, as well as to the south and southeast, follow-up drilling is targeting the open areas to the north and northwest, with an additional platform being constructed to pursue further step-outs to the northeast, that an updated Warintza Central Mineral Resource is expected to be issued in late Q1 2022 / early Q2 2022, that the initial resource growth drilling program for Warintza Central has been completed which will inform the updated mineral resource estimate, and that the focus of ongoing drilling has turned to pursuing the further extensions of near-surface, high-grade mineralization which remain open, with additional platforms allowing for more aggressive step-outs under construction. Although Solaris believes that the expectations reflected in such forward-looking statements and/or information are reasonable, readers are cautioned that actual results may vary from the forward-looking statements. These statements are based on a variety of assumptions including assumptions made about the Company’s ability to advance exploration efforts at the Warintza Project; the results of such exploration efforts; and the Company’s ability to achieve its growth objectives. These statements also involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements, including the risks, uncertainties and other factors identified in the Solaris Management’s Discussion and Analysis for the year ended December 31, 2020 available at www.sedar.com. Furthermore, the forward-looking statements contained in this news release are made as at the date of this news release and Solaris does not undertake any obligation to publicly update or revise any of these forward-looking statements except as may be required by applicable securities laws.