Vancouver, British Columbia--(Newsfile Corp. - January 21, 2021) - Southern Silver Exploration Corp. (TSXV: SSV) (OTCQB: SSVFF) reported today further intervals of gold-enriched oxide and sulphide mineralization in step out drilling as well as a significant downhole extension of earlier reported high-grade, silver-enriched polymetallic sulphide mineralization in drill hole 20CLM-125 at the Mina La Bocona zone, Cerro Las Minitas project, Durango Mexico.
New assay results from drill hole 20CLM-125 have extended an earlier reported 19.8 metre down hole mineralized interval to a full 50.6 metres (32.2m est. TT) of semi-continuous mineralization averaging 435g/t AgEq including new higher-grade intervals of:
Results from drill hole 20CLM-125 have also identified:
The mineralization identified in drill hole 20CLM-125 is the second, thick sulphide zone identified in this part of the Mina La Bocona target area. It represents a 12m to 25m lateral and down dip extension of mineralization first identified in drill hole 15CLM-078 from the 2015 drilling program and opens up the additional potential for further down-dip extensions of the sulphide mineralization which will be a continued focus of drilling in this current exploration program.
Results from drill hole 20CLM-127 which was cored up-dip from drill hole 20CLM-125, on the same azimuth, returned both gold-enriched oxide and deeper sulphide mineralization including:
Assay results from drill hole 20CLM-127 complement the sulphide and oxide mineralization previously identified in both drill holes 20CLM-125 and 15CLM-078 and highlight the continued exploration potential of the sulphide mineralization to depth and of the shallow oxide mineralization laterally to the southeast. Further drilling is continuing as part of the 2020-21 program to test both of these mineralized projections.
The identification of new thick zones of high-grade sulphide mineralization on the east side of the Cerro, complements the results from earlier drilling and greatly adds to the company's confidence that it can meet or exceed its exploration goals. The now expanded oxide-gold zone remains an intriguing new target for further delineation in 2021.
President Lawrence Page, Q. C. noted: "The present mineral resource estimate is based upon results derived from drill holes situate on the West side of the Cerro. Results from seventeen drill holes located on the East side of the Cerro, many containing high-grade mineralization, are not included in the 2019 Resource Estimate. Drilling currently being conducted on the east side of the Cerro is producing significant values of both oxide and sulphide mineralization, the results of which, together with results of the seventeen drill holes previously drilled, will be incorporated into an updated 43-101 Mineral Resource Estimate leading to further economic assessment studies incorporating all data later in 2021."
Figure 1: Plan Map of the Area of the Cerro showing the distribution of the CLM deposits and the location for new drill targeting, at the Mina La Bocona, South Skarn and Las Victorias targets.
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/5344/72524_6353e8a9346ba9a7_002full.jpg
Table 1: Select Assay intervals from Drill Holes 20CLM-125 and 20CLM-127 in the Mina La Bocona Target
Hole # | From | To | Interval | Est Tr Thck | Ag | Au | Cu | Pb | Zn | AgEq | ZnEq | Notes |
| (m) | (m) | (m) | (m) | (g/t) | (g/t) | (%) | (%) | (%) | (g/t) | (%) |
|
|
|
|
|
| Mina La Bocona Target |
|
|
|
|
| ||
20CLM-125 | 23.8 | 80.6 | 56.8 | 30.9 | 24 | 0.87 | 0.02 | 0.6 | 0.4 | 131 | 3.3 | Inc. New Assays |
inc. | 31.4 | 34.1 | 2.8 | 1.5 | 72 | 5.09 | 0.08 | 1.0 | 0.5 | 552 | 14.0 | Previously Released |
and inc. | 48.9 | 52.3 | 3.4 | 1.8 | 57 | 2.59 | 0.03 | 1.2 | 1.7 | 377 | 9.6 | Previously Released |
and | 135.0 | 138.1 | 3.1 | 1.7 | 17 | 0.66 | 0.03 | 0.8 | 0.5 | 122 | 3.1 | Previously Released |
and | 216.8 | 267.4 | 50.6 | 33.2 | 224 | 0.29 | 0.03 | 3.6 | 1.8 | 435 | 11.0 | Inc. New Assays |
inc. | 221.8 | 227.8 | 6.1 | 4.0 | 421 | 0.45 | 0.01 | 5.5 | 1.9 | 704 | 17.9 | Previously Released |
and inc. | 237.8 | 247.1 | 9.3 | 5.2 | 344 | 0.59 | 0.04 | 5.7 | 3.9 | 728 | 18.5 | New Assays |
and inc. | 250.8 | 253.0 | 2.2 | 1.2 | 520 | 0.34 | 0.06 | 10.6 | 9.8 | 1268 | 32.2 | New Assays |
and inc. | 257.6 | 265.2 | 7.5 | 4.2 | 364 | 0.30 | 0.03 | 7.0 | 1.8 | 678 | 17.2 | New Assays |
and | 326.7 | 328.2 | 1.4 | 0.8 | 1070 | 0.09 | 0.12 | 23.3 | 3.2 | 1937 | 49.1 | New Assays |
20CLM-127 | 44.7 | 56.1 | 11.4 | 7.0 | 24 | 0.93 | 0.01 | 0.5 | 0.7 | 146 | 3.7 | 36% dilution |
and | 132.5 | 175.7 | 43.2 | 26.5 | 26 | 0.37 | 0.02 | 0.5 | 0.4 | 89 | 2.2 |
|
inc. | 132.5 | 134.6 | 2.1 | 1.3 | 131 | 2.56 | 0.15 | 4.3 | 3.6 | 633 | 16.0 |
|
and inc. | 160.2 | 161.9 | 1.7 | 1.0 | 40 | 1.75 | 0.01 | 2.4 | 0.2 | 268 | 6.8 |
|
and | 214.2 | 224.2 | 10.0 | 6.1 | 162 | 0.57 | 0.01 | 3.2 | 1.3 | 359 | 9.1 | 27% dilution |
and | 288.9 | 292.0 | 3.1 | 1.9 | 199 | 0.25 | 0.01 | 1.2 | 1.0 | 298 | 7.6 |
|
and | 301.3 | 307.6 | 6.3 | 3.8 | 62 | 0.13 | 0.01 | 1.6 | 0.6 | 146 | 3.7 | 32% dilution |
Analyzed by FA/AA for gold and ICP-AES by ALS Laboratories, North Vancouver, BC. Silver (>100ppm), copper, lead and zinc (>1%) overlimits assayed by ore grade ICP analysis, High silver overlimits (>1500g/t Ag) and gold overlimits (>10g/t Au) re-assayed with FA-Grav. High Pb (>20%) and Zn (>30%) overlimits assayed by titration. AgEq and ZnEq were calculated using average metal prices of: US$20/oz silver, US$1650/oz gold, US$3.25/lbs copper and US$0.9/lbs lead and US$1.15/lbs zinc. AgEq and ZnEq calculations did not account for relative metallurgical recoveries of the metals. Ore-grade composites are calculated using a 80g/t AgEq cut-off in sulphide and 0.5g/t AuEq in the oxide gold zone Composites have <20% internal dilution, except where noted; anomalous intercepts are calculated using a 10g/t AgEq cut-off.
Approximately 7,500 metres of drilling have now been completed of the anticipated 10,000 metres of core drilling for the 2020-21 exploration program. Drilling which was paused for the Christmas break will continue in late January with one drill focused on the Mina La Bocona target and a second drill exploring the South Skarn target.
Drilling on the east side of the Cerro will test an approximate 800 metre strike length of the South Skarn Target and Mina La Bocona Target mineralized zones to depths of up to 650 metres as well as a high-grade hanging wall zone in the Mina La Bocona Target area. These drill targets are designed to increase the current mineral resource estimate of 24 million tonnes by approximately 30%.
The CLM Project remains one of the larger undeveloped silver-lead-zinc projects in the World and is wholly owned, unburdened by royalties, fully financed and fully permitted.
Cerro Las Minitas Project
The Cerro Las Minitas project is an advanced exploration stage polymetallic Ag-Pb-Zn-Cu Skarn/CRD project located in southern Durango, Mexico.
The Cerro Las Minitas project as of May 9th, 2019 contains a Mineral Resource Estimate, at a 175g/t AgEq cut-off, of(1)
A total of 150 drill holes for 67,375metres have been completed on the CLM Project with exploration expenditures of approximately US$27.0 million equating to exploration discovery costs of approximately C$0.09 per AgEq ounce to the end of 2020.
Table 2: Previously Reported 2020 Assay Results from the South Skarn and Las Victorias Target areas
Hole # | From | To | Interval | Est Tr Thck | Ag | Au | Cu | Pb | Zn | AgEq | ZnEq | Notes |
| (m) | (m) | (m) | (m) | (g/t) | (g/t) | (%) | (%) | (%) | (g/t) | (%) |
|
|
|
| Previously Reported South Skarn Assay Results |
|
|
|
| |||||
20CLM-118 | 170.1 | 177.0 | 6.9 | 4.0 | 109 | 0.14 | 0.02 | 1.8 | 2.1 | 259 | 6.6 | 27.50% |
inc. | 174.2 | 175.4 | 1.2 | 0.9 | 412 | 0.14 | 0.06 | 7.8 | 9.2 | 1033 | 26.2 |
|
and | 188.8 | 190.0 | 1.1 | 0.8 | 132 | 0.12 | 0.02 | 2.8 | 2.0 | 308 | 7.8 |
|
20CLM-119 | 95.0 | 96.5 | 1.5 | 1.1 | 54 | 2.83 | 0.01 | 3.6 | 0.4 | 417 | 10.6 |
|
and | 206.4 | 210.7 | 4.3 | 3.2 | 99 | 0.27 | 0.01 | 0.7 | 0.6 | 165 | 4.2 | 41.9% dilution |
inc. | 206.4 | 207.6 | 1.2 | 0.9 | 216 | 0.22 | 0.01 | 0.8 | 0.1 | 265 | 6.7 |
|
and | 226.1 | 235.1 | 9.0 | 6.7 | 625 | 0.11 | 0.03 | 11.8 | 7.5 | 1298 | 32.9 | 40.8% dilution |
inc. | 226.1 | 228.4 | 2.3 | 1.7 | 1338 | 0.15 | 0.04 | 25.9 | 17.6 | 2849 | 72.3 |
|
and inc. | 232.0 | 233.3 | 1.3 | 0.9 | 1480 | 0.09 | 0.04 | 26.5 | 16.8 | 2973 | 75.4 |
|
and | 241.5 | 243.0 | 1.6 | 1.2 | 112 | 0.07 | 0.02 | 2.2 | 2.1 | 272 | 6.9 |
|
20CLM-120 | 343.8 | 345.7 | 1.9 | 1.4 | 101 | 0.08 | 0.00 | 0.9 | 0.2 | 145 | 3.7 |
|
and | 429.0 | 432.6 | 3.7 | 2.7 | 511 | 0.10 | 0.13 | 5.0 | 3.7 | 835 | 21.2 |
|
inc. | 431.8 | 432.6 | 0.9 | 0.6 | 902 | 0.05 | 0.16 | 7.8 | 8.4 | 1496 | 37.9 |
|
and | 441.0 | 442.3 | 1.3 | 1.0 | 51 | 0.07 | 0.06 | 1.5 | 1.1 | 153 | 3.9 |
|
and | 450.8 | 452.9 | 2.1 | 1.6 | 182 | 0.23 | 0.21 | 4.4 | 4.1 | 522 | 13.2 |
|
20CLM-122 | 390.7 | 391.9 | 1.2 | 0.9 | 97 | 0.18 | 0.01 | 0.2 | 0.2 | 124 | 3.1 |
|
and | 417.8 | 419.0 | 1.2 | 0.9 | 247 | 0.19 | 0.07 | 4.7 | 1.2 | 463 | 11.7 |
|
and | 435.0 | 442.8 | 7.8 | 5.8 | 66 | 0.05 | 0.02 | 0.4 | 0.2 | 92 | 2.3 | 39.4% dilution |
inc. | 442.1 | 442.8 | 0.6 | 0.5 | 237 | 0.07 | 0.02 | 0.9 | 0.2 | 281 | 7.1 |
|
20CLM-124 | 397.2 | 402.1 | 5.0 | 3.3 | 304 | 0.11 | 0.18 | 4.8 | 1.9 | 555 | 14.1 |
|
inc | 400.1 | 401.0 | 0.8 | 0.6 | 607 | 0.15 | 0.49 | 11.0 | 3.4 | 1146 | 29.1 |
|
and | 475.0 | 490.6 | 15.6 | 10.4 | 172 | 0.08 | 0.15 | 3.8 | 3.7 | 458 | 11.6 | 31.1% Dilution |
inc. | 475.0 | 483.7 | 8.7 | 5.8 | 286 | 0.11 | 0.27 | 6.4 | 5.8 | 749 | 19.0 |
|
inc. | 475.0 | 475.9 | 0.9 | 0.6 | 975 | 0.05 | 1.27 | 21.2 | 18.5 | 2503 | 63.5 |
|
and | 498.0 | 499.9 | 1.9 | 1.2 | 303 | 0.05 | 0.02 | 7.1 | 5.8 | 755 | 19.2 |
|
inc. | 499.0 | 499.9 | 0.9 | 0.6 | 544 | 0.05 | 0.02 | 13.1 | 9.1 | 1313 | 33.3 |
|
Hole # | From | To | Interval | Est. Tr. Thck | Ag | Au | Cu | Pb | Zn | AgEq | ZnEq | Notes |
| (m) | (m) | (m) | (m) | (g/t) | (g/t) | (%) | (%) | (%) | (g/t) | (%) |
|
|
|
|
| Previously Reported Las Victorias |
|
|
|
| ||||
20CLM-121 | 678.6 | 679.1 | 0.5 | 0.4 | 155 | 1.79 | 2.28 | 0.1 | 22.8 | 1460 | 37.0 |
|
and | 682.6 | 683.4 | 0.9 | 0.7 | 51 | 0.02 | 0.29 | 0.1 | 3.0 | 204 | 5.2 |
|
and | 685.9 | 687.6 | 1.8 | 1.4 | 188 | 0.07 | 0.53 | 0.2 | 4.1 | 420 | 10.7 |
|
20CLM-123 | 134.6 | 140.8 | 6.2 | 4.3 | 33 | 0.94 | 0.00 | 0.3 | 0.4 | 136 | 3.4 |
|
and | 199.3 | 205.3 | 5.9 | 4.1 | 63 | 1.58 | 0.07 | 0.8 | 0.9 | 259 | 6.6 |
|
Analyzed by FA/AA for gold and ICP-AES by ALS Laboratories, North Vancouver, BC. Silver (>100ppm), copper, lead and zinc (>1%) overlimits assayed by ore grade ICP analysis, High silver overlimits (>1500g/t Ag) and gold overlimits (>10g/t Au) re-assayed with FA-Grav. High Pb (>20%) and Zn (>30%) overlimits assayed by titration. AgEq and ZnEq were calculated using average metal prices of: US$20/oz silver, US$1650/oz gold, US$3.25/lbs copper and US$0.9/lbs lead and US$1.15/lbs zinc. AgEq and ZnEq calculations did not account for relative metallurgical recoveries of the metals. Ore-grade composites are calculated using a 80g/t AgEq cut-off in sulphide and 0.5g/t AuEq in the oxide gold zone Composites have <20% internal dilution, except where noted; anomalous intercepts are calculated using a 10g/t AgEq cut-off.
About Southern Silver Exploration Corp.
Southern Silver Exploration Corp. is an exploration and development company with a focus on the discovery of world-class mineral deposits. Our specific emphasis is the 100% owned Cerro Las Minitas silver-lead-zinc project located in the heart of Mexico's Faja de Plata, which hosts multiple world-class mineral deposits such as Penasquito, Los Gatos, San Martin, Naica and Pitarrilla. We have assembled a team of highly experienced technical, operational and transactional professionals to support our exploration efforts in developing the Cerro Las Minitas project into a premier, high-grade, silver-lead-zinc mine. The Company engages in the acquisition, exploration and development either directly or through joint-venture relationships in mineral properties in major jurisdictions. Our property portfolio also includes the Oro porphyry copper-gold project located in southern New Mexico, USA.
Robert Macdonald, MSc. P.Geo, is a Qualified Person as defined by National Instrument 43-101 and supervised directly the collection of the data from the CLM Project that is reported in this disclosure and is responsible for the presentation of the technical information in this disclosure.
On behalf of the Board of Directors
"Lawrence Page"
Lawrence Page, Q.C.
President & Director, Southern Silver Exploration Corp.
For further information, please visit Southern Silver's website at southernsilverexploration.com or contact us at 604.641.2759 or by email at ir@mnxltd.com.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release contains forward-looking statements. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements. Factors that could cause actual results to differ materially from those in forward looking statements include the timing and receipt of government and regulatory approvals, and continued availability of capital and financing and general economic, market or business conditions. Southern Silver Exploration Corp. does not assume any obligation to update or revise its forward-looking statements, whether as a result of new information, future events or otherwise, except to the extent required by applicable law.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/72524