Southern Silver Extends Oxide-Gold and Sulphide Zones at Cerro Las Minitas with 6.1 Metres Averaging 344g/t Ag, 5.7% Pb and 3.9% Zn (728g/t AgEq) and 1.0 Metre Grading 1070g/t Ag, 23.3% Pb and 3.2% Zn (1,937g/t AgEq)

2021-01-21 / @newsfile

 

Vancouver, British Columbia--(Newsfile Corp. - January 21, 2021) - Southern Silver Exploration Corp. (TSXV: SSV) (OTCQB: SSVFF) reported today further intervals of gold-enriched oxide and sulphide mineralization in step out drilling as well as a significant downhole extension of earlier reported high-grade, silver-enriched polymetallic sulphide mineralization in drill hole 20CLM-125 at the Mina La Bocona zone, Cerro Las Minitas project, Durango Mexico.

New assay results from drill hole 20CLM-125 have extended an earlier reported 19.8 metre down hole mineralized interval to a full 50.6 metres (32.2m est. TT) of semi-continuous mineralization averaging 435g/t AgEq including new higher-grade intervals of:

  • a 9.3m down-hole interval (6.1m est. TT) averaging 344g/t Ag, 0.59g/t Au. 5.7% Pb and 3.9% Zn (728g/t AgEq; 18.5% ZnEq);
  • a 2.2m down-hole interval (1.4m est. TT) averaging 520g/t Ag, 0.34g/t Au, 10.6% Pb and 9.8% Zn (1268g/t AgEq; 32.2% ZnEq); and
  • a 7.5m down-hole interval (5.0m est. TT) averaging 364g/t Ag, 0.3g/t Au, 7.0% Pb and 1.8% Zn (678g/t AgEq; 17.2% ZnEq);

Results from drill hole 20CLM-125 have also identified:

  • in the sulphide zone, a relatively narrow interval of bonanza-grade silver mineralization a further 60m down hole and adjacent to the Central Intrusion which returned a 1.4m interval (1.0m est. TT) grading 1070g/t Ag, 0.09g/t Au, 23.3% Pb and 3.2% Zn (1,937g/t AgEq; 49.1% ZnEq).
  • in the upper oxide-gold zone (first reported in NR-16-20, December 16th, 2020) an extension of the zone of mineralization to 56.8m (30.9m est. TT) averaging 0.87g/t Au and 24g/t Ag.

The mineralization identified in drill hole 20CLM-125 is the second, thick sulphide zone identified in this part of the Mina La Bocona target area. It represents a 12m to 25m lateral and down dip extension of mineralization first identified in drill hole 15CLM-078 from the 2015 drilling program and opens up the additional potential for further down-dip extensions of the sulphide mineralization which will be a continued focus of drilling in this current exploration program.

Results from drill hole 20CLM-127 which was cored up-dip from drill hole 20CLM-125, on the same azimuth, returned both gold-enriched oxide and deeper sulphide mineralization including:

  • a 43.2m down-hole interval (26.5m est TT) averaging 0.37g/t Au and 26g/t Ag of shallow oxide mineralization; and
  • a 10m down-hole interval (6.1m est TT) averaging 162g/t Ag, 0.57g/t Au, 3.2% Pb and 1.3% Zn (359gt/t AgEq; 9.1% Zn) that correlates with the deeper sulphide mineralization

Assay results from drill hole 20CLM-127 complement the sulphide and oxide mineralization previously identified in both drill holes 20CLM-125 and 15CLM-078 and highlight the continued exploration potential of the sulphide mineralization to depth and of the shallow oxide mineralization laterally to the southeast. Further drilling is continuing as part of the 2020-21 program to test both of these mineralized projections.

The identification of new thick zones of high-grade sulphide mineralization on the east side of the Cerro, complements the results from earlier drilling and greatly adds to the company's confidence that it can meet or exceed its exploration goals. The now expanded oxide-gold zone remains an intriguing new target for further delineation in 2021.

President Lawrence Page, Q. C. noted: "The present mineral resource estimate is based upon results derived from drill holes situate on the West side of the Cerro. Results from seventeen drill holes located on the East side of the Cerro, many containing high-grade mineralization, are not included in the 2019 Resource Estimate. Drilling currently being conducted on the east side of the Cerro is producing significant values of both oxide and sulphide mineralization, the results of which, together with results of the seventeen drill holes previously drilled, will be incorporated into an updated 43-101 Mineral Resource Estimate leading to further economic assessment studies incorporating all data later in 2021."

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/5344/72524_6353e8a9346ba9a7_002.jpg

Figure 1: Plan Map of the Area of the Cerro showing the distribution of the CLM deposits and the location for new drill targeting, at the Mina La Bocona, South Skarn and Las Victorias targets.
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/5344/72524_6353e8a9346ba9a7_002full.jpg

Table 1: Select Assay intervals from Drill Holes 20CLM-125 and 20CLM-127 in the Mina La Bocona Target

Hole #

From

To

Interval

Est Tr Thck

Ag

Au

Cu

Pb

Zn

AgEq

ZnEq

Notes

 

(m)

(m)

(m)

(m)

(g/t)

(g/t)

(%)

(%)

(%)

(g/t)

(%)

 

 

 

 

 

 

Mina La Bocona Target

 

 

 

 

 

20CLM-125

23.8

80.6

56.8

30.9

24

0.87

0.02

0.6

0.4

131

3.3

Inc. New Assays

inc.

31.4

34.1

2.8

1.5

72

5.09

0.08

1.0

0.5

552

14.0

Previously Released

and inc.

48.9

52.3

3.4

1.8

57

2.59

0.03

1.2

1.7

377

9.6

Previously Released

and

135.0

138.1

3.1

1.7

17

0.66

0.03

0.8

0.5

122

3.1

Previously Released

and

216.8

267.4

50.6

33.2

224

0.29

0.03

3.6

1.8

435

11.0

Inc. New Assays

inc.

221.8

227.8

6.1

4.0

421

0.45

0.01

5.5

1.9

704

17.9

Previously Released

and inc.

237.8

247.1

9.3

5.2

344

0.59

0.04

5.7

3.9

728

18.5

New Assays

and inc.

250.8

253.0

2.2

1.2

520

0.34

0.06

10.6

9.8

1268

32.2

New Assays

and inc.

257.6

265.2

7.5

4.2

364

0.30

0.03

7.0

1.8

678

17.2

New Assays

and

326.7

328.2

1.4

0.8

1070

0.09

0.12

23.3

3.2

1937

49.1

New Assays

20CLM-127

44.7

56.1

11.4

7.0

24

0.93

0.01

0.5

0.7

146

3.7

36% dilution

and

132.5

175.7

43.2

26.5

26

0.37

0.02

0.5

0.4

89

2.2

 

inc.

132.5

134.6

2.1

1.3

131

2.56

0.15

4.3

3.6

633

16.0

 

and inc.

160.2

161.9

1.7

1.0

40

1.75

0.01

2.4

0.2

268

6.8

 

and

214.2

224.2

10.0

6.1

162

0.57

0.01

3.2

1.3

359

9.1

27% dilution

and

288.9

292.0

3.1

1.9

199

0.25

0.01

1.2

1.0

298

7.6

 

and

301.3

307.6

6.3

3.8

62

0.13

0.01

1.6

0.6

146

3.7

32% dilution

Analyzed by FA/AA for gold and ICP-AES by ALS Laboratories, North Vancouver, BC. Silver (>100ppm), copper, lead and zinc (>1%) overlimits assayed by ore grade ICP analysis, High silver overlimits (>1500g/t Ag) and gold overlimits (>10g/t Au) re-assayed with FA-Grav. High Pb (>20%) and Zn (>30%) overlimits assayed by titration. AgEq and ZnEq were calculated using average metal prices of: US$20/oz silver, US$1650/oz gold, US$3.25/lbs copper and US$0.9/lbs lead and US$1.15/lbs zinc. AgEq and ZnEq calculations did not account for relative metallurgical recoveries of the metals. Ore-grade composites are calculated using a 80g/t AgEq cut-off in sulphide and 0.5g/t AuEq in the oxide gold zone Composites have <20% internal dilution, except where noted; anomalous intercepts are calculated using a 10g/t AgEq cut-off.

Approximately 7,500 metres of drilling have now been completed of the anticipated 10,000 metres of core drilling for the 2020-21 exploration program. Drilling which was paused for the Christmas break will continue in late January with one drill focused on the Mina La Bocona target and a second drill exploring the South Skarn target.

Drilling on the east side of the Cerro will test an approximate 800 metre strike length of the South Skarn Target and Mina La Bocona Target mineralized zones to depths of up to 650 metres as well as a high-grade hanging wall zone in the Mina La Bocona Target area. These drill targets are designed to increase the current mineral resource estimate of 24 million tonnes by approximately 30%.

The CLM Project remains one of the larger undeveloped silver-lead-zinc projects in the World and is wholly owned, unburdened by royalties, fully financed and fully permitted.

Cerro Las Minitas Project

The Cerro Las Minitas project is an advanced exploration stage polymetallic Ag-Pb-Zn-Cu Skarn/CRD project located in southern Durango, Mexico.

The Cerro Las Minitas project as of May 9th, 2019 contains a Mineral Resource Estimate, at a 175g/t AgEq cut-off, of(1)

  • Indicated - 134Moz AgEq: 37.5Moz Ag, 40Mlb Cu, 303Mlb Pb and 897Mlb Zn
  • Inferred - 138Moz AgEq: 45.7Moz Ag, 76Mlb Cu, 253Mlb Pb and 796Mlb Zn

A total of 150 drill holes for 67,375metres have been completed on the CLM Project with exploration expenditures of approximately US$27.0 million equating to exploration discovery costs of approximately C$0.09 per AgEq ounce to the end of 2020.

Table 2: Previously Reported 2020 Assay Results from the South Skarn and Las Victorias Target areas

Hole #

From

To

Interval

Est Tr Thck

Ag

Au

Cu

Pb

Zn

AgEq

ZnEq

Notes

 

(m)

(m)

(m)

(m)

(g/t)

(g/t)

(%)

(%)

(%)

(g/t)

(%)

 

 

 

 

Previously Reported South Skarn Assay Results

 

 

 

 

20CLM-118

170.1

177.0

6.9

4.0

109

0.14

0.02

1.8

2.1

259

6.6

27.50%

inc.

174.2

175.4

1.2

0.9

412

0.14

0.06

7.8

9.2

1033

26.2

 

and

188.8

190.0

1.1

0.8

132

0.12

0.02

2.8

2.0

308

7.8

 

20CLM-119

95.0

96.5

1.5

1.1

54

2.83

0.01

3.6

0.4

417

10.6

 

and

206.4

210.7

4.3

3.2

99

0.27

0.01

0.7

0.6

165

4.2

41.9% dilution

inc.

206.4

207.6

1.2

0.9

216

0.22

0.01

0.8

0.1

265

6.7

 

and

226.1

235.1

9.0

6.7

625

0.11

0.03

11.8

7.5

1298

32.9

40.8% dilution

inc.

226.1

228.4

2.3

1.7

1338

0.15

0.04

25.9

17.6

2849

72.3

 

and inc.

232.0

233.3

1.3

0.9

1480

0.09

0.04

26.5

16.8

2973

75.4

 

and

241.5

243.0

1.6

1.2

112

0.07

0.02

2.2

2.1

272

6.9

 

20CLM-120

343.8

345.7

1.9

1.4

101

0.08

0.00

0.9

0.2

145

3.7

 

and

429.0

432.6

3.7

2.7

511

0.10

0.13

5.0

3.7

835

21.2

 

inc.

431.8

432.6

0.9

0.6

902

0.05

0.16

7.8

8.4

1496

37.9

 

and

441.0

442.3

1.3

1.0

51

0.07

0.06

1.5

1.1

153

3.9

 

and

450.8

452.9

2.1

1.6

182

0.23

0.21

4.4

4.1

522

13.2

 

20CLM-122

390.7

391.9

1.2

0.9

97

0.18

0.01

0.2

0.2

124

3.1

 

and

417.8

419.0

1.2

0.9

247

0.19

0.07

4.7

1.2

463

11.7

 

and

435.0

442.8

7.8

5.8

66

0.05

0.02

0.4

0.2

92

2.3

39.4% dilution

inc.

442.1

442.8

0.6

0.5

237

0.07

0.02

0.9

0.2

281

7.1

 

20CLM-124

397.2

402.1

5.0

3.3

304

0.11

0.18

4.8

1.9

555

14.1

 

inc

400.1

401.0

0.8

0.6

607

0.15

0.49

11.0

3.4

1146

29.1

 

and

475.0

490.6

15.6

10.4

172

0.08

0.15

3.8

3.7

458

11.6

31.1% Dilution

inc.

475.0

483.7

8.7

5.8

286

0.11

0.27

6.4

5.8

749

19.0

 

inc.

475.0

475.9

0.9

0.6

975

0.05

1.27

21.2

18.5

2503

63.5

 

and

498.0

499.9

1.9

1.2

303

0.05

0.02

7.1

5.8

755

19.2

 

inc.

499.0

499.9

0.9

0.6

544

0.05

0.02

13.1

9.1

1313

33.3

 

                         

Hole #

From

To

Interval

Est. Tr. Thck

Ag

Au

Cu

Pb

Zn

AgEq

ZnEq

Notes

 

(m)

(m)

(m)

(m)

(g/t)

(g/t)

(%)

(%)

(%)

(g/t)

(%)

 

 

 

 

 

Previously Reported Las Victorias

 

 

 

 

20CLM-121

678.6

679.1

0.5

0.4

155

1.79

2.28

0.1

22.8

1460

37.0

 

and

682.6

683.4

0.9

0.7

51

0.02

0.29

0.1

3.0

204

5.2

 

and

685.9

687.6

1.8

1.4

188

0.07

0.53

0.2

4.1

420

10.7

 

20CLM-123

134.6

140.8

6.2

4.3

33

0.94

0.00

0.3

0.4

136

3.4

 

and

199.3

205.3

5.9

4.1

63

1.58

0.07

0.8

0.9

259

6.6

 

Analyzed by FA/AA for gold and ICP-AES by ALS Laboratories, North Vancouver, BC. Silver (>100ppm), copper, lead and zinc (>1%) overlimits assayed by ore grade ICP analysis, High silver overlimits (>1500g/t Ag) and gold overlimits (>10g/t Au) re-assayed with FA-Grav. High Pb (>20%) and Zn (>30%) overlimits assayed by titration. AgEq and ZnEq were calculated using average metal prices of: US$20/oz silver, US$1650/oz gold, US$3.25/lbs copper and US$0.9/lbs lead and US$1.15/lbs zinc. AgEq and ZnEq calculations did not account for relative metallurgical recoveries of the metals. Ore-grade composites are calculated using a 80g/t AgEq cut-off in sulphide and 0.5g/t AuEq in the oxide gold zone Composites have <20% internal dilution, except where noted; anomalous intercepts are calculated using a 10g/t AgEq cut-off.

About Southern Silver Exploration Corp.

Southern Silver Exploration Corp. is an exploration and development company with a focus on the discovery of world-class mineral deposits. Our specific emphasis is the 100% owned Cerro Las Minitas silver-lead-zinc project located in the heart of Mexico's Faja de Plata, which hosts multiple world-class mineral deposits such as Penasquito, Los Gatos, San Martin, Naica and Pitarrilla. We have assembled a team of highly experienced technical, operational and transactional professionals to support our exploration efforts in developing the Cerro Las Minitas project into a premier, high-grade, silver-lead-zinc mine. The Company engages in the acquisition, exploration and development either directly or through joint-venture relationships in mineral properties in major jurisdictions. Our property portfolio also includes the Oro porphyry copper-gold project located in southern New Mexico, USA.

  1. The 2019 Cerro Las Minitas Resource Estimate was prepared following CIM definitions for classification of Mineral Resources. Resources are constrained using mainly geological constraints and approximate 10g/t AgEq grade shells. The block models are comprised of an array of blocks measuring 10m x 2m x 10m, with grades for Au, Ag, Cu, Pb, Zn values interpolated using ID3 weighting. Silver and zinc equivalent values were subsequently calculated from the interpolated block grades. The model is identified at a 175g/t AgEq cut-off, with an indicated resource of 11,102,000 tonnes averaging 105g/t Ag, 0.10g/t Au, 1.2% Pb, 3.7% Zn and 0.16% Cu and an inferred resource of 12,844,000 tonnes averaging 111g/t Ag, 0.07g/t Au, 0.9% Pb, 2.8% Zn and 0.27% Cu. AgEq cut-off values were calculated using average long-term prices of $16.6/oz. silver, $1,275/oz. gold, $2.75/lb. copper, $1.0/lb. lead and $1.25/lb. zinc. Metal recoveries for the Blind, El Sol and Las Victorias deposits of 91% silver, 25% gold, 92% lead, 82% zinc and 80% copper and for the Skarn Front deposit of 85% silver, 18% gold, 89% lead, 92% zinc and 84% copper were used to define the cut-off grades. Base case cut-off grade assumed $75/tonne operating, smelting and sustaining costs. All prices are stated in $USD. Silver Equivalents were calculated from the interpolated block values using relative recoveries and prices between the component metals and silver to determine a final AgEq value. The same methodology was used to calculate the ZnEq value. Mineral resources are not mineral reserves until they have demonstrated economic viability. Mineral resource estimates do not account for a resource's mineability, selectivity, mining loss, or dilution. The current Resource Estimate was prepared by Garth Kirkham, P.Geo. of Kirkham Geosciences Ltd. who is the Independent Qualified Person responsible for presentation and review of the Mineral Resource Estimate. All figures are rounded to reflect the relative accuracy of the estimate and therefore numbers may not appear to add precisely.

Robert Macdonald, MSc. P.Geo, is a Qualified Person as defined by National Instrument 43-101 and supervised directly the collection of the data from the CLM Project that is reported in this disclosure and is responsible for the presentation of the technical information in this disclosure.

On behalf of the Board of Directors

"Lawrence Page"

Lawrence Page, Q.C.

President & Director, Southern Silver Exploration Corp.

For further information, please visit Southern Silver's website at southernsilverexploration.com or contact us at 604.641.2759 or by email at ir@mnxltd.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward-looking statements. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements. Factors that could cause actual results to differ materially from those in forward looking statements include the timing and receipt of government and regulatory approvals, and continued availability of capital and financing and general economic, market or business conditions. Southern Silver Exploration Corp. does not assume any obligation to update or revise its forward-looking statements, whether as a result of new information, future events or otherwise, except to the extent required by applicable law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/72524

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok