HONG KONG, Nov. 12, 2021 (GLOBE NEWSWIRE) -- SouthGobi Resources Ltd. (Toronto Stock Exchange (“TSX”): SGQ, Hong Kong Stock Exchange (“HKEX”): 1878) (the "Company" or “SouthGobi”) today announces its financial and operating results for the three and nine months ended September 30, 2021. All figures are in U.S. dollars (“USD”) unless otherwise stated.
Significant Events and Highlights
The Company’s significant events and highlights for the three months ended September 30, 2021 and the subsequent period to November 12, 2021 are as follows:
OVERVIEW OF OPERATIONAL DATA AND FINANCIAL RESULTS
Summary of Operational Data
Three months ended | Nine months ended | ||||||||||||||
September 30, | September 30, | ||||||||||||||
2021 | 2020 | 2021 | 2020 | ||||||||||||
Sales Volumes, Prices and Costs | |||||||||||||||
Premium semi-soft coking coal | |||||||||||||||
Coal sales (millions of tonnes) | 0.11 | 0.35 | 0.59 | 0.63 | |||||||||||
Average realized selling price (per tonne) | $ | 64.25 | $ | 30.17 | $ | 51.53 | $ | 29.48 | |||||||
Standard semi-soft coking coal/ premium thermal coal | |||||||||||||||
Coal sales (millions of tonnes) | 0.06 | 0.54 | 0.32 | 0.93 | |||||||||||
Average realized selling price (per tonne) | $ | 33.56 | $ | 30.80 | $ | 35.01 | $ | 31.71 | |||||||
Washed coal | |||||||||||||||
Coal sales (millions of tonnes) | - | 0.10 | 0.01 | 0.12 | |||||||||||
Average realized selling price (per tonne) | $ | - | $ | 41.30 | $ | 48.53 | $ | 41.64 | |||||||
Total | |||||||||||||||
Coal sales (millions of tonnes) | 0.17 | 0.99 | 0.92 | 1.68 | |||||||||||
Average realized selling price (per tonne) | $ | 53.52 | $ | 31.63 | $ | 45.87 | $ | 31.58 | |||||||
Raw coal production (millions of tonnes) | 0.26 | 0.52 | 1.30 | 0.53 | |||||||||||
Cost of sales of product sold (per tonne) | $ | 40.39 | $ | 20.23 | $ | 32.35 | $ | 21.70 | |||||||
Direct cash costs of product sold (per tonne) (i) | $ | 17.50 | $ | 12.38 | $ | 17.82 | $ | 11.57 | |||||||
Mine administration cash costs of product sold (per tonne) (i) | $ | 1.62 | $ | 1.15 | $ | 1.53 | $ | 1.47 | |||||||
Total cash costs of product sold (per tonne) (i) | $ | 19.12 | $ | 13.53 | $ | 19.35 | $ | 13.04 | |||||||
Other Operational Data | |||||||||||||||
Production waste material moved (millions of bank cubic | 0.59 | 1.67 | 5.63 | 2.24 | |||||||||||
meters) | |||||||||||||||
Strip ratio (bank cubic meters of waste material per tonne of | 2.23 | 3.20 | 4.31 | 4.24 | |||||||||||
coal produced) | |||||||||||||||
Lost time injury frequency rate (ii) | 0.00 | 0.00 | 0.00 | 0.04 | |||||||||||
(i) A Non-International Financial Reporting Standards (“non-IFRS”) financial measure. Refer to “Non-IFRS Financial Measures” section. Cash costs of product sold exclude idled mine asset cash costs.
(ii) Per 200,000 man hours and calculated based on a rolling 12-month average.
Overview of Operational Data
For the three months ended September 30, 2021
The Company experienced an increase in the average selling price of coal from $31.6 per tonne in the third quarter of 2020 to $53.5 per tonne in the third quarter of 2021, as a result of improved market conditions in China and an improvement of the overall product mix. The product mix for the third quarter of 2021 consisted of approximately 65% premium semi-soft coking coal and 35% standard semi-soft coking coal/premium thermal coal compared to approximately 35% premium semi-soft coking coal, 55% standard semi-soft coking coal/premium thermal coal and 10% washed coal in the third quarter of 2020.
In response to the increase in COVID-19 case numbers in Mongolia in the third quarter of 2021, the Chinese authorities has been restricting the number of trucks permitted to cross the Ceke port of entry, and such restriction has severely impacted the sales volume of the Company in the third quarter of 2021. As a result, the Company’s sales volume decreased from 1.0 million tonnes in the third quarter of 2020 to 0.2 million tonnes in the third quarter of 2021.
In response to the restrictions on the number of trucks crossing the Mongolian border into China, the Company temporarily suspended its major mining operations (including coal mining) in the second quarter of 2021 in order to control the inventory level and preserve the Company’s working capital. Mining operations (including coal mining) resumed in the third quarter of 2021 and 0.3 million tonnes were produced during the quarter. However, mining operations were temporarily suspended again by the Company beginning in November 2021 in response to the temporary closure of the Ceke Port of Entry. See “Significant Events and Highlights - Impact of the COVID-19 Pandemic” above.
The Company’s unit cost of sales of product sold increased from $20.2 per tonne in the third quarter of 2020 to $40.4 per tonne in the third quarter of 2021. The increase was mainly driven by the diseconomies of scale due to decreased sales as well as the increase in the effective royalty rate.
For the nine months ended September 30, 2021
The Company sold 0.9 million tonnes for the first nine months of 2021 as compared to 1.7 million tonnes for the first nine months of 2020. The average selling price increased from $31.6 per tonne for the first nine months of 2020 to $45.9 per tonne for the first nine months of 2021, as a result of improved market conditions in China and an improvement of the overall product mix.
The Company’s production in the first nine months of 2021 was higher than the first nine months of 2020 as a result of the Company’s major mining operations (including coal mining) being temporarily suspended for a relatively longer period in 2020 in order to mitigate the financial impact of the border closures and to preserve the Company’s working capital.
The Company’s unit cost of sales of product sold increased from $21.7 per tonne for the first nine months of 2020 to $32.4 per tonne in the first nine months of 2021. The increase was mainly driven by the increase in the effective royalty rate.
Summary of Financial Results
Three months ended | Nine months ended | ||||||||||||||
September 30, | September 30, | ||||||||||||||
$ in thousands, except per share information | 2021 | 2020 | 2021 | 2020 | |||||||||||
Revenue (i) | $ | 9,295 | $ | 30,960 | $ | 42,550 | $ | 52,072 | |||||||
Cost of sales (i) | (6,866 | ) | (20,027 | ) | (29,765 | ) | (36,464 | ) | |||||||
Gross profit excluding idled mine asset costs | 3,269 | 11,789 | 15,062 | 19,537 | |||||||||||
Gross profit | 2,429 | 10,933 | 12,785 | 15,608 | |||||||||||
Other operating income/(expenses), net | 100 | (575 | ) | (348 | ) | (5,255 | ) | ||||||||
Administration expenses | (1,467 | ) | (1,789 | ) | (4,733 | ) | (4,851 | ) | |||||||
Evaluation and exploration expenses | (36 | ) | (63 | ) | (148 | ) | (171 | ) | |||||||
Profit from operations | 1,026 | 8,506 | 7,556 | 5,331 | |||||||||||
Finance costs | (11,457 | ) | (9,885 | ) | (32,484 | ) | (24,250 | ) | |||||||
Finance income | 2,040 | 2,583 | 23,055 | 2,600 | |||||||||||
Share of earnings/(loss) of a joint venture | (261 | ) | 660 | (22 | ) | 882 | |||||||||
Current income tax expenses | (78 | ) | (793 | ) | (1,059 | ) | (2,425 | ) | |||||||
Net profit/(loss) attributable to equity holders of the Company | (8,730 | ) | 1,071 | (2,954 | ) | (17,862 | ) | ||||||||
Basic and diluted earnings/(loss) per share | $ | (0.03 | ) | $ | - | $ | (0.01 | ) | $ | (0.07 | ) | ||||
(i) Revenue and cost of sales relate to the Company’s Ovoot Tolgoi Mine within the Coal Division operating segment. Refer to note 3 of the condensed consolidated interim financial statements for further analysis regarding the Company’s reportable operating segments.
Overview of Financial Results
For the three months ended September 30, 2021
The Company recorded a $1.0 million profit from operations in the third quarter of 2021 compared to an $8.5 million profit from operations in the third quarter of 2020. The financial results for the third quarter of 2021 were impacted by the decreased sales resulting from the export volume limitations experienced by the Company during the quarter.
Revenue was $9.3 million in the third quarter of 2021 compared to $31.0 million in the third quarter of 2020. The Company’s effective royalty rate for the third quarter of 2021, based on the Company’s average realized selling price of $53.5 per tonne, was 25.5% or $13.7 per tonne, compared to 11.1% or $3.5 per tonne in the third quarter of 2020 (based on the average realized selling price of $31.6 per tonne).
Royalty regime in Mongolia
The royalty regime in Mongolia is evolving and has been subject to change since 2012.
On September 4, 2019, the Government of Mongolia issued a resolution in connection with the royalty regime. From September 1, 2019 onwards, in the event that the contract sales price is less than the reference price as determined by the Government of Mongolia by more than 30%, then the royalty payable will be calculated based on the Mongolian government’s reference price instead of the contract sales price.
On June 23, 2021, the Government of Mongolia issued a new resolution in connection with the royalty regime. From July 1, 2021 onwards, the royalty payable is to be calculated based on the reference price as determined by the Government of Mongolia, and the reference to the contract sales price will be removed.
Cost of sales was $6.9 million in the third quarter of 2021 compared to $20.0 million in the third quarter of 2020. The decrease in cost of sales was mainly due to the decreased sales during the quarter. Cost of sales consists of operating expenses, share-based compensation expense, equipment depreciation, depletion of mineral properties, royalties and idled mine asset costs. Operating expenses in cost of sales reflect the total cash costs of product sold (a Non-IFRS financial measure, see section “Non-IFRS financial measure” for further analysis) during the quarter.
Three months ended September 30, | ||||
$ in thousands | 2021 | 2020 | ||
Operating expenses | $ 3,251 | $ 13,390 | ||
Share-based compensation expense | 38 | 4 | ||
Depreciation and depletion | 366 | 2,297 | ||
Royalties | 2,371 | 3,480 | ||
Cost of sales from mine operations | 6,026 | 19,171 | ||
Cost of sales related to idled mine assets | 840 | 856 | ||
Cost of sales | $ 6,866 | $ 20,027 | ||
Operating expenses in cost of sales were $3.3 million in the third quarter of 2021 compared to $13.4 million in the third quarter of 2020. The overall decrease in operating expenses was primarily due to the decreased sales volume from 1.0 million tonnes in the third quarter of 2020 to 0.2 million tonnes in the third quarter of 2021.
Cost of sales related to idled mine assets in the third quarter of 2021 included $0.8 million related to depreciation expenses for idled equipment (third quarter of 2020: $0.9 million).
Other operating income were $0.1 million in the third quarter of 2021 (third quarter of 2020: other operating expenses of $0.6 million).
Three months ended September 30, | ||||
$ in thousands | 2021 | 2020 | ||
CIC management fee | $ 199 | $ 864 | ||
Reversal of provision for doubtful trade and other receivables | (16) | (482) | ||
Foreign exchange loss, net | 13 | 113 | ||
Discount on settlement of trade payables | (127) | - | ||
Loss on disposal of items of property, plant and equipment, net | - | 80 | ||
Written off of other payables | (169) | - | ||
Other operating expenses/(income), net | $ (100) | $ 575 | ||
Administration expenses were $1.5 million in the third quarter of 2021 compared to $1.8 million in the third quarter of 2020 as follows:
Three months ended September 30, | ||||
$ in thousands | 2021 | 2020 | ||
Corporate administration | $ 186 | $ 394 | ||
Legal and professional fees | 294 | 395 | ||
Salaries and benefits | 685 | 781 | ||
Share-based compensation expense | 137 | 15 | ||
Depreciation | 165 | 204 | ||
Administration expenses | $ 1,467 | $ 1,789 | ||
The Company continued to minimize evaluation and exploration expenditures in the third quarter of 2021 in order to preserve the Company’s financial resources. Evaluation and exploration activities and expenditures in the third quarter of 2021 were limited to ensuring that the Company met the Mongolian Minerals Law requirements in respect of its mining licenses.
Finance costs were $11.5 million and $9.9 million in the third quarter of 2021 and 2020 respectively, which primarily consisted of interest expense on the $250.0 million CIC Convertible Debenture.
For the nine months ended September 30, 2021
The Company recorded a $7.6 million profit from operations in the first nine months of 2021 compared to a $5.3 million profit from operations in the first nine months of 2020. The financial results were impacted by (i) the higher selling price achieved by the Company; (ii) the decreased sales resulting from the export volume limitations and (iii) a provision for commercial arbitration of $4.6 million recorded for the first nine months of 2020 in connection with the settlement agreement entered into with First Concept Industrial Group Limited (“First Concept”).
Revenue was $42.6 million in the first nine months of 2021 compared to $52.1 million in the first nine months of 2020. The Company’s effective royalty rate for the first nine months of 2021, based on the Company’s average realized selling price of $45.9 per tonne, was 18.1% or $8.3 per tonne, compared to 12.2% or $3.9 per tonne in the first nine months of 2020 (based on the average realized selling price of $31.6 per tonne).
Cost of sales were $29.8 million in the first nine months of 2021 compared to $36.5 million in the first nine months of 2020, as follows:
Nine months ended September 30, | ||||
$ in thousands | 2021 | 2020 | ||
Operating expenses | $ 17,802 | $ 21,912 | ||
Share-based compensation expense | 37 | 23 | ||
Depreciation and depletion | 1,943 | 4,163 | ||
Royalties | 7,706 | 6,437 | ||
Cost of sales from mine operations | 27,488 | 32,535 | ||
Cost of sales related to idled mine assets | 2,277 | 3,929 | ||
Cost of sales | $ 29,765 | $ 36,464 | ||
Operating expenses in cost of sales were $17.8 million in the first nine months of 2021 compared to $21.9 million in the first nine months of 2020. The overall decrease in operating expenses was primarily due to the decreased sales volume.
Cost of sales related to idled mine assets in the first nine months of 2021 included $2.3 million related to depreciation expenses for idled equipment (first nine months of 2020: $3.9 million).
Other operating expenses were $0.3 million in the first nine months of 2021 (first nine months of 2020: $5.3 million). A provision for commercial arbitration of $4.6 million recorded for the first nine months of 2020 in connection with the settlement agreement entered into with First Concept.
Nine months ended September 30, | ||||
$ in thousands | 2021 | 2020 | ||
CIC management fee | $ 932 | $ 1,399 | ||
Provision/(reversal of provision) for doubtful trade and other receivables | 204 | (200) | ||
Foreign exchange loss/(gain), net | 184 | (639) | ||
Loss/(gain) on disposal of items of property, plant and equipment, net | (270) | 61 | ||
Written off of other payables | (169) | - | ||
Reversal of impairment on materials and supplies inventories | (25) | - | ||
Discount on settlement of trade payables | (508) | - | ||
Provision for commercial arbitration | - | 4,634 | ||
Other operating expenses | $ 348 | $ 5,255 | ||
Administration expenses were $4.7 million in the first nine months of 2021 compared to $4.9 million in the first nine months of 2020, as follows:
Nine months ended September 30, | ||||
$ in thousands | 2021 | 2020 | ||
Corporate administration | $ 1,135 | $ 842 | ||
Legal and professional fees | 853 | 944 | ||
Salaries and benefits | 2,083 | 2,448 | ||
Share-based compensation expense | 133 | 84 | ||
Depreciation | 529 | 533 | ||
Administration expenses | $ 4,733 | $ 4,851 | ||
The Company continued to minimize evaluation and exploration expenditures in the first nine months of 2021 in order to preserve the Company’s financial resources. Evaluation and exploration activities and expenditures in the first nine months of 2021 were limited to ensuring that the Company met the Mongolian Minerals Law requirements in respect of its mining licenses.
Finance costs were $32.5 million and $24.3 million in the first nine months of 2021 and 2020 respectively, which primarily consisted of interest expense on the $250.0 million CIC Convertible Debenture. The increase was mainly due to the associated increase in interest expenses following the recording of a gain on extinguishment of the CIC Convertible Debenture.
Summary of Quarterly Operational Data
2021 | 2020 | 2019 | ||||||||||||||||||||||||
Quarter Ended | 30-Sep | 30-Jun | 31-Mar | 31-Dec | 30-Sep | 30-Jun | 31-Mar | 31-Dec | ||||||||||||||||||
Sales Volumes, Prices and Costs | ||||||||||||||||||||||||||
Premium semi-soft coking coal | ||||||||||||||||||||||||||
Coal sales (millions of tonnes) | 0.11 | 0.08 | 0.40 | 0.38 | 0.35 | 0.21 | 0.07 | 0.39 | ||||||||||||||||||
Average realized selling price (per tonne) | $ | 64.25 | $ | 52.11 | $ | 47.88 | $ | 39.34 | $ | 30.17 | $ | 28.69 | $ | 28.46 | $ | 29.18 | ||||||||||
Standard semi-soft coking coal/ premium thermal coal | ||||||||||||||||||||||||||
Coal sales (millions of tonnes) | 0.06 | 0.03 | 0.23 | 0.50 | 0.54 | 0.26 | 0.13 | 0.40 | ||||||||||||||||||
Average realized selling price (per tonne) | $ | 33.56 | $ | 36.71 | $ | 35.17 | $ | 31.66 | $ | 30.80 | $ | 33.12 | $ | 32.71 | $ | 31.88 | ||||||||||
Washed coal | ||||||||||||||||||||||||||
Coal sales (millions of tonnes) | - | - | 0.01 | 0.07 | 0.10 | 0.02 | - | 0.20 | ||||||||||||||||||
Average realized selling price (per tonne) | $ | - | $ | - | $ | 49.62 | $ | 42.51 | $ | 41.30 | $ | 43.26 | $ | - | $ | 42.95 | ||||||||||
Total | ||||||||||||||||||||||||||
Coal sales (millions of tonnes) | 0.17 | 0.11 | 0.64 | 0.95 | 0.99 | 0.49 | 0.20 | 0.99 | ||||||||||||||||||
Average realized selling price (per tonne) | $ | 53.52 | $ | 47.93 | $ | 43.46 | $ | 35.53 | $ | 31.63 | $ | 31.66 | $ | 31.18 | $ | 33.04 | ||||||||||
Raw coal production (millions of tonnes) | 0.26 | - | 1.04 | 0.96 | 0.52 | - | 0.01 | 1.48 | ||||||||||||||||||
Cost of sales of product sold (per tonne) | $ | 40.39 | $ | 41.38 | $ | 28.67 | $ | 23.36 | $ | 20.23 | $ | 21.16 | $ | 30.36 | $ | 23.68 | ||||||||||
Direct cash costs of product sold (per tonne) (i) | $ | 17.50 | $ | 16.39 | $ | 18.15 | $ | 14.78 | $ | 12.38 | $ | 9.90 | $ | 11.69 | $ | 13.61 | ||||||||||
Mine administration cash costs of product sold (per tonne) (i) | $ | 1.62 | $ | 4.26 | $ | 1.04 | $ | 1.07 | $ | 1.15 | $ | 1.70 | $ | 2.50 | $ | 1.29 | ||||||||||
Total cash costs of product sold (per tonne) (i) | $ | 19.12 | $ | 20.65 | $ | 19.19 | $ | 15.85 | $ | 13.53 | $ | 11.60 | $ | 14.19 | $ | 14.90 | ||||||||||
Other Operational Data | ||||||||||||||||||||||||||
- | - | - | - | - | - | - | - | |||||||||||||||||||
Production waste material moved (millions of bank | 0.59 | - | 5.04 | 3.10 | 1.67 | - | 0.57 | 3.61 | ||||||||||||||||||
cubic meters) | ||||||||||||||||||||||||||
Strip ratio (bank cubic meters of waste material per | 2.23 | - | 4.83 | 3.24 | 3.20 | - | 85.08 | 2.44 | ||||||||||||||||||
tonne of coal produced) | ||||||||||||||||||||||||||
Lost time injury frequency rate (ii) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.04 | 0.09 | 0.08 | ||||||||||||||||||
(i) A Non-IFRS financial measure. Refer to “Non-IFRS Financial Measures” section. Cash costs of product sold exclude idled mine asset cash costs.
(ii) Per 200,000 man hours and calculated based on a rolling 12-month average.
Summary of Quarterly Financial Results
The Company’s consolidated financial statements are reported under IFRS issued by the International Accounting Standards Board (the “IASB”). The following table provides highlights, extracted from the Company’s annual and interim consolidated financial statements, of quarterly results for the past eight quarters:
$ in thousands, except per share information | 2021 | 2020 | 2019 | |||||||||||||||||||||||
Quarter Ended | 30-Sep | 30-Jun | 31-Mar | 31-Dec | 30-Sep | 30-Jun | 31-Mar | 31-Dec | ||||||||||||||||||
Financial Results | ||||||||||||||||||||||||||
Revenue (i) | $ | 9,295 | $ | 5,191 | $ | 28,064 | $ | 33,879 | $ | 30,960 | $ | 14,975 | $ | 6,137 | $ | 32,113 | ||||||||||
Cost of sales (i) | (6,866 | ) | (4,552 | ) | (18,347 | ) | (22,193 | ) | (20,027 | ) | (10,366 | ) | (6,071 | ) | (23,446 | ) | ||||||||||
Gross profit excluding idled mine asset costs | 3,269 | 1,565 | 10,228 | 12,610 | 11,789 | 6,286 | 1,462 | 9,971 | ||||||||||||||||||
Gross profit including idled mine asset costs | 2,429 | 639 | 9,717 | 11,686 | 10,933 | 4,609 | 66 | 8,667 | ||||||||||||||||||
Other operating income/(expenses), net | 100 | (113 | ) | (335 | ) | 434 | (575 | ) | (5,150 | ) | 470 | (1,589 | ) | |||||||||||||
Administration expenses | (1,467 | ) | (1,484 | ) | (1,781 | ) | (2,120 | ) | (1,789 | ) | (1,291 | ) | (1,771 | ) | (1,386 | ) | ||||||||||
Evaluation and exploration expenses | (36 | ) | (47 | ) | (65 | ) | (55 | ) | (63 | ) | (52 | ) | (56 | ) | (382 | ) | ||||||||||
Profit/(loss) from operations | 1,026 | (1,005 | ) | 7,536 | 9,945 | 8,506 | (1,884 | ) | (1,291 | ) | 5,310 | |||||||||||||||
Finance costs | (11,457 | ) | (8,870 | ) | (14,637 | ) | (7,442 | ) | (9,885 | ) | (7,258 | ) | (7,135 | ) | (7,095 | ) | ||||||||||
Finance income | 2,040 | 2,494 | 21,001 | 13 | 2,583 | 2 | 43 | 36 | ||||||||||||||||||
Share of earnings/(loss) of a joint venture | (261 | ) | (35 | ) | 274 | 431 | 660 | 268 | (46 | ) | 225 | |||||||||||||||
Current income tax credit/(expenses) | (78 | ) | 139 | (1,120 | ) | (5,174 | ) | (793 | ) | (900 | ) | (732 | ) | (659 | ) | |||||||||||
Net profit/(loss) | (8,730 | ) | (7,277 | ) | 13,054 | (2,227 | ) | 1,071 | (9,772 | ) | (9,161 | ) | (2,183 | ) | ||||||||||||
Basic earnings/(loss) per share | $ | (0.03 | ) | $ | (0.03 | ) | $ | 0.05 | $ | (0.01 | ) | $ | - | $ | (0.04 | ) | $ | (0.03 | ) | $ | (0.01 | ) | ||||
Diluted earnings/(loss) per share | $ | (0.03 | ) | $ | (0.03 | ) | $ | 0.02 | $ | (0.01 | ) | $ | - | $ | (0.04 | ) | $ | (0.03 | ) | $ | (0.01 | ) | ||||
(i) Revenue and cost of sales relate to the Company’s Ovoot Tolgoi Mine within the Coal Division operating segment. Refer to note 3 of the condensed consolidated interim financial statements for further analysis regarding the Company’s reportable operating segments.
LIQUIDITY AND CAPITAL RESOURCES
Liquidity and Capital Management
The Company has in place a planning, budgeting and forecasting process to help determine the funds required to support the Company’s normal operations on an ongoing basis and its expansionary plans.
Costs reimbursable to Turquoise Hill Resources Limited (“Turquoise Hill”)
Prior to the completion of a private placement with Novel Sunrise Investments Limited (“Novel Sunrise”) on April 23, 2015, Rio Tinto plc (“Rio Tinto”) was the Company’s ultimate parent company. In the past, Rio Tinto sought reimbursement from the Company for the salaries and benefits of certain Rio Tinto employees who were assigned by Rio Tinto to work for the Company, as well as certain legal and professional fees incurred by Rio Tinto in relation to the Company’s prior internal investigation and Rio Tinto’s participation in the tripartite committee. Subsequently Rio Tinto transferred and assigned to Turquoise Hill its right to seek reimbursement for these costs and fees from the Company.
As at December 31, 2020, the amount of reimbursable costs and fees claimed by Turquoise Hill (the “TRQ Reimbursable Amount”) amounted to $8.1 million (such amount is included in the trade and other payables).
On January 20, 2021, the Company and Turquoise Hill entered into a settlement agreement, whereby Turquoise Hill agreed to a repayment schedule in settlement of certain secondment costs in the amount of $2.8 million (representing a portion of the TRQ Reimbursable Amount) pursuant to which the Company agreed to make monthly payments to Turquoise Hill in the amount of $0.1 million per month from January 2021 to June 2022. The Company is contesting the validity of the remaining balance of the TRQ Reimbursable Amount claimed by Turquoise Hill.
Going concern considerations
The Company’s condensed consolidated interim financial statements have been prepared on a going concern basis which assumes that the Company will continue operating until at least September 30, 2022 and will be able to realize its assets and discharge its liabilities in the normal course of operations as they come due. However, in order to continue as a going concern, the Company must generate sufficient operating cash flow, secure additional capital or otherwise pursue a strategic restructuring, refinancing or other transactions to provide it with additional liquidity.
Several adverse conditions and material uncertainties cast significant doubt upon the Company’s ability to continue as a going concern and the going concern assumption used in the preparation of the Company’s consolidated financial statements. The Company had a deficiency in assets of $79.1 million as at September 30, 2021 as compared to a deficiency in assets of $76.2 million as at December 31, 2020 while the working capital deficiency (excess current liabilities over current assets) was $36.5 million as at September 30, 2021 compared to a working capital deficiency of $217.6 million as at December 31, 2020.
Included in the working capital deficiency as at September 30, 2021 are significant obligations, mainly comprised of trade and other payables of $68.7 million, which includes the unpaid taxes of $22.2 million that are repayable on demand to the Mongolian Tax Authority (“MTA”).
The Company may not be able to settle all trade and other payables on a timely basis, while continuing to postpone the settlement of certain trade payables owed to suppliers and creditors may impact the mining operations of the Company and may result in potential lawsuits and/or bankruptcy proceedings being filed against the Company. Except as disclosed elsewhere in this press release, no such lawsuits or proceedings are pending as at November 12, 2021. However, there can be no assurance that no such lawsuits or proceedings will be filed by the Company’s creditors in the future and the Company’s suppliers and contractors will continue to supply and provide services to the Company uninterrupted.
There are significant uncertainties as to the outcomes of the above events or conditions that may cast significant doubt on the Company’s ability to continue as a going concern and, therefore, the Company may be unable to realize its assets and discharge its liabilities in the normal course of business. Should the use of the going concern basis in preparation of the condensed consolidated interim financial statements be determined to be not appropriate, adjustments would have to be made to write down the carrying amounts of the Company’s assets to their realizable values, to provide for any further liabilities which might arise and to reclassify non-current assets and non-current liabilities as current assets and current liabilities, respectively. The effects of these adjustments have not been reflected in the condensed consolidated interim financial statements. If the Company is unable to continue as a going concern, it may be forced to seek relief under applicable bankruptcy and insolvency legislation.
Management of the Company has prepared a cash flow projection covering a period of 12 months from September 30, 2021. The cash flow projection has taken into account the anticipated cash flows to be generated from the Company’s business during the period under projection including cost saving measures. In particular, the Company has taken into account the following measures for improvement of the Company’s liquidity and financial position, which include: (a) entering into the deferral agreement on November 19, 2020 (the “2020 November Deferral Agreement”) and the 2021 July Deferral Agreement with CIC for a deferral of (i) deferred cash interest and deferral fees of $75.2 million which were due and payable to CIC on or before September 14, 2020, under the deferral agreement signed on June 19, 2020 (the “2020 June Deferral Agreement”); (ii) semi-annual cash interest payments in the aggregate amount of $16.0 million payable to CIC on November 19, 2020 and May 19, 2021; (iii) $4.0 million worth of PIK Interest shares issuable to CIC on November 19, 2020 under the CIC Convertible Debenture; and (iv) the management fee which payable to CIC on November 14, 2020, February 14, 2021, May 15, 2021, August 14, 2021 and November 14, 2021 under the amended and restated mutual cooperation agreement signed on April 23, 2019 (“Amended and Restated Cooperation Agreement”) (collectively, the “2020 November Deferral Amounts”) and the 2021 Deferral Amounts respectively until August 31, 2023; (b) agreeing to deferral arrangements and improved payment terms with certain vendors; (c) reducing the outstanding tax payable by making monthly payments to the MTA beginning as of June 2020; (d) reducing the inventory of low quality coal by wet washing; and (e) temporarily suspend mining operations (including coal mining) beginning as of early November 2021 in order to control the inventory level and preserve the Company’s working capital. After considering the above, the directors of the Company believe that there will be sufficient financial resources to continue its operations and to meet its financial obligations as and when they fall due in the next 12 months from September 30, 2021 and therefore are satisfied that it is appropriate to prepare the condensed consolidated interim financial statements on a going concern basis.
Factors that impact the Company’s liquidity are being closely monitored and include, but are not limited to, impact of the COVID-19 pandemic, restrictions on the Company’s ability to import its coal products for sale in China, China’s economic growth, market prices of coal, production levels, operating cash costs, capital costs, exchange rates of currencies of countries where the Company operates and exploration and discretionary expenditures.
As at September 30, 2021 and December 31, 2020, the Company was not subject to any externally imposed capital requirements.
Impact of the COVID-19 Pandemic
Since the second quarter of 2021, additional precautionary measures were imposed by the Chinese authorities at the Ceke port of entry in response to the increase of COVID-19 cases in Mongolia, which included restricting the number of trucks crossing the Mongolian border into China. The restrictions on trucking volume have had an adverse impact on the Company’s ability to import its coal products into China in the third quarter of 2021.
In response to the increase in the number of COVID-19 cases in Ejinaqi, a region in China’s Inner Mongolia Autonomous Region, reported in late October 2021, the local government authorities have imposed stringent preventive measures throughout the region, including the temporary closure of the Ceke Port of Entry located at the border of Mongolia and China. Accordingly, the Company’s coal exports into China have been suspended and such suspension remains in effect as of the date hereof. The Company anticipates the temporary closure of the Ceke Port of Entry will have a material adverse impact on the Company’s sales and cash flow until such time as coal exports into China are allowed to resume. In order to control the inventory level and preserve the Company’s working capital, the Company decided to temporarily suspend mining operations (including coal mining) beginning as of early November 2021.
The Company will continue to closely monitor the development of the COVID-19 pandemic and the impact it has on coal exports to China and will continue to react promptly to preserve the working capital of the Company and mitigate any negative impacts on the business and operations of the Company.
CIC Convertible Debenture
In November 2009, the Company entered into a financing agreement with CIC for $500 million in the form of a secured, convertible debenture bearing interest at 8.0% (6.4% payable semi-annually in cash and 1.6% payable annually in the Company’s shares) with a maximum term of 30 years. The CIC Convertible Debenture is secured by a first ranking charge over the Company’s assets and certain subsidiaries. The financing was used primarily to support the accelerated investment program in Mongolia and for working capital, repayment of debts, general and administrative expenses and other general corporate purposes.
On March 29, 2010, the Company exercised its right to call for the conversion of up to $250.0 million of the CIC Convertible Debenture into approximately 21.5 million shares at a conversion price of $11.64 (CAD$11.88). As at June 30, 2021, CIC owned approximately 23.7% of the issued and outstanding Common Shares of the Company.
On November 19, 2020, the Company and CIC entered into the 2020 November Deferral Agreement pursuant to which CIC agreed to grant the Company a deferral of the 2020 November Deferral Amounts. The 2020 November Deferral Agreement became effective on January 21, 2021, being the date on which the 2020 November Deferral Agreement was approved by shareholders at the Company’s annual and special meeting of shareholders.
The principal terms of the 2020 November Deferral Agreement are as follows:
On July 30, 2021, the Company and CIC entered into the 2021 July Deferral Agreement pursuant to which CIC agreed to grant the Company a deferral of: (i) semi-annual cash interest payments of $8.1 million payable to CIC on November 19, 2021; and (ii) $4.0 million worth of PIK Interest issuable to CIC on November 19, 2021 under the CIC Convertible Debenture. The effectiveness of the 2021 July Deferral Agreement and the respective covenants, agreements and obligations of each party under the 2021 July Deferral Agreement are subject to the Company obtaining the requisite approval from the TSX on or before August 22, 2021 in accordance with applicable TSX rules.
The principal terms of the 2021 July Deferral Agreement are as follows:
REGULATORY ISSUES AND CONTINGENCIES
Class Action Lawsuit
In January 2014, Siskinds LLP, a Canadian law firm, filed a class action (the “Class Action”) against the Company, certain of its former senior officers and directors, and its former auditors (the “Former Auditors”), in the Ontario Court in relation to the Company’s restatement of certain financial statements previously disclosed in the Company’s public fillings (the “Restatement”).
To commence and proceed with the Class Action, the plaintiff was required to seek leave of the Court under the Ontario Securities Act (“Leave Motion”) and certify the action as a class proceeding under the Ontario Class Proceedings Act. The Ontario Court rendered its decision on the Leave Motion on November 5, 2015, dismissing the action against the former senior officers and directors and allowing the action to proceed against the Company in respect of alleged misrepresentation affecting trades in the secondary market for the Company’s securities arising from the Restatement. The action against the Former Auditors was settled by the plaintiff on the eve of the Leave Motion.
Both the plaintiff and the Company appealed the Leave Motion decision to the Ontario Court of Appeal. On September 18, 2017, the Ontario Court of Appeal dismissed the Company’s appeal of the Leave Motion to permit the plaintiff to commence and proceed with the Class Action. Concurrently, the Ontario Court of Appeal granted leave for the plaintiff to proceed with their action against the former senior officers and directors in relation to the Restatement.
The Company filed an application for leave to appeal to the Supreme Court of Canada in November 2017, but the leave to appeal to the Supreme Court of Canada was dismissed in June 2018.
In December 2018, the parties agreed to a consent Certification Order, whereby the action against the former senior officers and directors was withdrawn and the Class Action would only proceed against the Company.
Counsel for the plaintiff and defendants have agreed on and the case management judge has ordered a trial to commence in December 2022 (subject to Court availability). To accomplish all steps necessary for trial preparation, counsels have agreed to the following proposed schedule under the case management of the judge: (i) document production and pleading amendments by October 31, 2021; (ii) oral examinations for discovery ending by December 31, 2022; (iii) expert reports of plaintiff by March 31, 2022 and by defendants July 31, 2022; and (iv) pre-trial filings and motions by August 31, 2022. The Company has urged a trial as early as possible.
The Company firmly believes that it has a strong defense on the merits and will continue to vigorously defend itself against the Class Action through independent Canadian litigation counsel retained by the Company for this purpose. Due to the inherent uncertainties of litigation, it is not possible to predict the final outcome of the Class Action or determine the amount of potential losses, if any. However, the Company has determined that a provision for this matter as at September 30, 2021 was not required.
Toll Wash Plant Agreement with Ejin Jinda
In 2011, the Company entered into an agreement with Ejin Jinda, a subsidiary of China Mongolia Coal Co. Ltd., to toll-wash coal from the Ovoot Tolgoi Mine. The agreement had a duration of five years from the commencement of the contract and provided for an annual washing capacity of approximately 3.5 million tonnes of input coal.
Under the agreement with Ejin Jinda, which required the commercial operation of the wet washing facility to commence on October 1, 2011, the additional fees payable by the Company under the wet washing contract would have been $18.5 million. At each reporting date, the Company assesses the agreement with Ejin Jinda and has determined it is not probable that this $18.5 million will be required to be paid. Accordingly, the Company has determined that a provision for this matter as at September 30, 2021 was not required.
Special Needs Territory in Umnugobi
On February 13, 2015, the Soumber mining licenses (MV-016869, MV-020436 and MV-020451) (the “License Areas”) were included into a special protected area (to be further referred as Special Needs Territory, the “SNT”) newly set up by the Umnugobi Aimag’s Civil Representatives Khural (the “CRKh”) to establish a strict regime on the protection of natural environment and prohibit mining activities in the territory of the SNT.
On July 8, 2015, SouthGobi Sands LLC (“SGS”) and the chairman of the CRKh, in his capacity as the respondent’s representative, reached an agreement (the “Amicable Resolution Agreement”) to exclude the License Areas from the territory of the SNT in full, subject to confirmation of the Amicable Resolution Agreement by the session of the CRKh. The parties formally submitted the Amicable Resolution Agreement to the appointed judge of the Administrative Court for her approval and requested a dismissal of the case in accordance with the Law of Mongolia on Administrative Court Procedure. On July 10, 2015, the judge issued her order approving the Amicable Resolution Agreement and dismissing the case, while reaffirming the obligation of CRKh to take necessary actions at its next session to exclude the License Areas from the SNT and register the new map of the SNT with the relevant authorities. Mining activities at the Soumber property cannot proceed unless and until the Company obtains a court order restoring the Soumber mining licenses and until the License Areas are removed from the SNT.
On July 24, 2021, SGS was notified by the Implementing Agency of Mongolian Government that the license area covered by two mining licenses (MV-016869 and MV-020451) are no longer overlapping with the SNT. The Company will continue to work with the Mongolian authorities regarding the license area covered by the mining license (MV-020436).
Mongolian Royalties
On June 23, 2021, the Government of Mongolia issued a new resolution in connection with the royalty regime. From July 1, 2021 onwards, the royalty payable is to be calculated based on the reference price as determined by the Government of Mongolia, and the reference to the contract sales price will be removed.
Importing F-Grade Coal into China
As a result of import coal quality standards established by Chinese authorities, the Company has not been able to export its F-grade coal products into China since December 15, 2018 as the F-grade coal products do not meet the quality requirement.
TRANSPORTATION INFRASTRUCTURE
On August 2, 2011, the State Property Committee of Mongolia awarded the tender to construct a paved highway from the Ovoot Tolgoi Mine to the Shivee Khuren Border Crossing (the “Paved Highway”) to consortium partners NTB LLC and SGS (together referred to as “RDCC LLC”) with an exclusive right of ownership of the Paved Highway for 30 years. The Company has an indirect 40% interest in RDCC LLC through its Mongolian subsidiary SGS. The toll rate is MNT 1,500 per tonne.
The Paved Highway has a carrying capacity in excess of 20 million tonnes of coal per year.
For the three and nine months ended September 30, 2021, RDCC LLC recognized toll fee revenue of $0.3 million (2020: $2.3 million) and $2.0 million (2020: $3.8 million), respectively.
PLEDGE OF ASSETS
There was no pledge of assets as at September 30, 2021 ($0.1 million of the Company’s property, plant and equipment were pledged as security for a bank loan granted to the Company as at December 31, 2020).
PURCHASE, SALE OR REDEMPTION OF LISTED SECURITIES OF THE COMPANY
The Company did not redeem its listed securities, nor did the Company or any of its subsidiaries purchase or sell such securities during the nine months ended September 30, 2021.
COMPLIANCE WITH CORPORATE GOVERNANCE
The Company has, throughout the nine months ended September 30, 2021, applied the principles and complied with the requirements of its corporate governance practices as defined by the board of directors (“Board”) and all applicable statutory, regulatory and stock exchange listings standards, which include the code provisions set out in the Corporate Governance Code (the “Corporate Governance Code”) contained in Appendix 14 to the Rules Governing the Listing of Securities on the HKEX (the “Hong Kong Listing Rules”), except for the following:
Pursuant to code provision A.2.7 of the Corporate Governance Code, the chairman of the Board (“Chairman”) should at least annually hold meetings with the non-executive directors (including independent non-executive directors) without the executive directors present. The Company has not had a Chairman since the conclusion of the annual general meeting held on June 30, 2017. During the period of January 1, 2021 to September 30, 2021 there was one meeting between the Independent Lead Director, who is fulfilling the duties of the Chairman, and the non-executive directors without the presence of the executive director. The opportunity for such communication channel is offered at the end of each Board meeting.
SECURITIES TRANSACTIONS BY DIRECTORS
The Company has adopted policies regarding directors’ securities transactions in its Corporate Disclosure, Confidentiality and Securities Trading Policy that have terms that are no less exacting than those set out in the Model Code for Securities Transactions by Directors of Listed Issuers contained in Appendix 10 to the Hong Kong Listing Rules (“Model Code”).
In response to a specific enquiry made by the Company on each of the directors, all directors confirmed that they had complied with the required standards as set out in the Model Code and the Company’s Corporate Disclosure, Confidentiality and Securities Trading Policy throughout the nine months ended September 30, 2021.
OUTLOOK
The COVID-19 pandemic has caused unprecedented challenges around the world and adversely impacted the global economy. The Company has adopted, and will continue to implement strict COVID-19 precautionary measures at the mine site as well as in all of its offices in order to maintain operations in the normal course, while also complying with the advice or orders of local public health authorities.
As a result of the restrictions on trucking volume crossing the Mongolian border into China imposed by Chinese Authorities at the Ceke port of entry, the Company anticipates that it will continue to be negatively impacted by the COVID-19 pandemic for the foreseeable future, which will have an adverse effect on the Company’s sales, production, logistics and financials. In particular, the restriction of the number of trucks for crossing the Mongolian border into China by the Chinese authorities will limit the Company’s ability to increase revenue despite the improved market conditions in China.
Following the recent temporary closure of the Ceke border, there will be a material adverse impact on the Company’s sales and cash flow until such time as coal exports into China are allowed to resume. In order to control the inventory level and preserve the Company’s working capital, the Company decided to temporarily suspend mining operations (including coal mining) beginning as of early November 2021.The Company will continue to closely monitor the development of the COVID-19 pandemic and the impact it has on coal exports to China, and will continue to react promptly to preserve the working capital of the Company and mitigate any negative impacts on the business and operations of the Company.
The Company remains cautiously optimistic regarding the Chinese coal market, as coal is still considered to be the primary energy source which China will continue to rely on in the foreseeable future. Coal supply and coal import in China are expected to be limited due to increasingly stringent requirements relating to environmental protection and safety production, which may result in volatile coal prices in China. The Company will continue to monitor and react proactively to the dynamic market.
In the medium term, the Company will continue to adopt various strategies to enhance its product mix in order to maximize revenue, expand its customer base and sales network, improve logistics, optimize its operational cost structure and, most importantly, operate in a safe and socially responsible manner.
The Company’s objectives for the medium term are as follows:
In the long term, the Company will continue to focus on creating and maximizing shareholders value by leveraging its key competitive strengths, including:
NON-IFRS FINANCIAL MEASURES
Cash Costs
The Company uses cash costs to describe its cash production and associated cash costs incurred in bringing the inventories to their present locations and conditions. Cash costs incorporate all production costs, which include direct and indirect costs of production, with the exception of idled mine asset costs and non-cash expenses which are excluded. Non-cash expenses include share-based compensation expense, impairment of coal stockpile inventories, depreciation and depletion of property, plant and equipment and mineral properties. The Company uses this performance measure to monitor its operating cash costs internally and believes this measure provides investors and analysts with useful information about the Company’s underlying cash costs of operations. The Company believes that conventional measures of performance prepared in accordance with IFRS do not fully illustrate the ability of its mining operations to generate cash flows. The Company reports cash costs on a sales basis. This performance measure is commonly utilized in the mining industry.
Idle Mine Asset Costs
The Company uses idle mine asset costs to describe the cost incurred during idle mine period. Idle mine asset costs include share-based compensation expense, impairment of coal stockpile inventories, depreciation and depletion of property, plant and equipment and mineral properties. The Company uses this performance measure to monitor its gross profit internally and believes this measure provides investors and analysts with useful information about the Company’s underlying gross profit. The Company believes that conventional measures of performance prepared in accordance with IFRS do not fully illustrate the ability of its mining operations to generate cash flows. This performance measure is commonly utilized in the mining industry.
Summarized Comprehensive Income Information
(Expressed in thousands of USD, except for share and per share amounts)
Three months ended | Nine months ended | |||||||||||||||
September 30, | September 30, | |||||||||||||||
2021 | 2020 | 2021 | 2020 | |||||||||||||
Revenue | $ | 9,295 | $ | 30,960 | $ | 42,550 | $ | 52,072 | ||||||||
Cost of sales | (6,866 | ) | (20,027 | ) | (29,765 | ) | (36,464 | ) | ||||||||
Gross profit | 2,429 | 10,933 | 12,785 | 15,608 | ||||||||||||
Other operating income/(expenses), net | 100 | (575 | ) | (348 | ) | (5,255 | ) | |||||||||
Administration expenses | (1,467 | ) | (1,789 | ) | (4,733 | ) | (4,851 | ) | ||||||||
Evaluation and exploration expenses | (36 | ) | (63 | ) | (148 | ) | (171 | ) | ||||||||
Profit from operations | 1,026 | 8,506 | 7,556 | 5,331 | ||||||||||||
Finance costs | (11,457 | ) | (9,885 | ) | (32,484 | ) | (24,250 | ) | ||||||||
Finance income | 2,040 | 2,583 | 23,055 | 2,600 | ||||||||||||
Share of earnings/(loss) of a joint venture | (261 | ) | 660 | (22 | ) | 882 | ||||||||||
Profit/(loss) before tax | (8,652 | ) | 1,864 | (1,895 | ) | (15,437 | ) | |||||||||
Current income tax expenses | (78 | ) | (793 | ) | (1,059 | ) | (2,425 | ) | ||||||||
Net profit/(loss) attributable to equity holders of the Company | (8,730 | ) | 1,071 | (2,954 | ) | (17,862 | ) | |||||||||
Other comprehensive income/(loss) to be reclassified to | ||||||||||||||||
profit or loss in subsequent periods | ||||||||||||||||
Exchange difference on translation of foreign operation | 73 | (1,576 | ) | (151 | ) | (6,365 | ) | |||||||||
Net comprehensive loss attributable to equity holders of the Company | $ | (8,657 | ) | $ | (505 | ) | $ | (3,105 | ) | $ | (24,227 | ) | ||||
Basic and diluted earnings/(loss) per share | $ | (0.03 | ) | $ | - | $ | (0.01 | ) | $ | (0.07 | ) | |||||
Summarized Financial Position Information
(Expressed in thousands of USD)
As at | |||||||||
September 30, | December 31, | ||||||||
Notes | 2021 | 2020 | |||||||
Assets | |||||||||
Current assets | |||||||||
Cash and cash equivalents | $ | 3,344 | $ | 20,121 | |||||
Restricted cash | 1,237 | 918 | |||||||
Trade and other receivables | 11 | 79 | 1,305 | ||||||
Inventories | 12 | 53,137 | 42,383 | ||||||
Prepaid expenses | 1,980 | 1,666 | |||||||
Total current assets | 59,777 | 66,393 | |||||||
Non-current assets | |||||||||
Property, plant and equipment | 13 | 134,778 | 131,425 | ||||||
Inventories | 12 | - | 680 | ||||||
Investment in a joint venture | 15,846 | 16,134 | |||||||
Total non-current assets | 150,624 | 148,239 | |||||||
Total assets | $ | 210,401 | $ | 214,632 | |||||
Equity and liabilities | |||||||||
Current liabilities | |||||||||
Trade and other payables | 14 | $ | 68,651 | $ | 74,365 | ||||
Deferred revenue | 22,709 | 20,831 | |||||||
Interest-bearing borrowing | 15 | - | 2,826 | ||||||
Lease liabilities | 258 | 202 | |||||||
Income tax payable | 4,626 | 4,365 | |||||||
Current portion of convertible debenture | 16 | - | 181,411 | ||||||
Total current liabilities | 96,244 | 284,000 | |||||||
Non-current liabilities | |||||||||
Lease liabilities | 605 | 424 | |||||||
Convertible debenture | 16 | 185,854 | - | ||||||
Decommissioning liability | 6,775 | 6,445 | |||||||
Total non-current liabilities | 193,234 | 6,869 | |||||||
Total liabilities | 289,478 | 290,869 | |||||||
Equity | |||||||||
Common shares | 1,098,809 | 1,098,634 | |||||||
Share option reserve | 52,792 | 52,702 | |||||||
Capital reserve | 396 | 396 | |||||||
Exchange reserve | (30,422 | ) | (30,271 | ) | |||||
Accumulated deficit | (1,200,652 | ) | (1,197,698 | ) | |||||
Total deficiency in assets | (79,077 | ) | (76,237 | ) | |||||
Total equity and liabilities | $ | 210,401 | $ | 214,632 | |||||
Net current liabilities | $ | (36,467 | ) | . | $ | (217,607 | ) | ||
Total assets less current liabilities | $ | 114,157 | $ | (69,368 | ) | ||||
REVIEW OF INTERIM RESULTS
The condensed consolidated interim financial statements of the Company for the three and nine months ended September 30, 2021, which are unaudited and have not been reviewed by the Company’s independent auditor, but have been reviewed by the Audit Committee and they have been prepared in compliance with the IFRS, the Hong Kong Listing Rules, TSX Company Manual and other applicable legal requirements.
The Company’s results for the three and nine months ended September 30, 2021 are contained in the unaudited condensed consolidated interim financial statements and Management Discussion and Analysis of Financial Condition and Results of Operations, available on the SEDAR website at www.sedar.com and the Company’s website at www.southgobi.com.
ABOUT SOUTHGOBI
SouthGobi, listed on the Toronto and Hong Kong stock exchanges, owns and operates its flagship Ovoot Tolgoi coal mine in Mongolia. It also holds the mining licences of its other metallurgical and thermal coal deposits in South Gobi Region of Mongolia. SouthGobi produces and sells coal to customers in China.
Contact:
Investor Relations
Office: | +852 2156 1438 (Hong Kong) |
+1 604 762 6783 (Canada) | |
Email: | info@southgobi.com |
Website: | www.southgobi.com |
Except for statements of fact relating to the Company, certain information contained herein constitutes forward-looking statements. Forward-looking statements are frequently characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, "could", "should", "seek", "likely", "estimate" and other similar words or statements that certain events or conditions “may” or “will” occur. Forward-looking statements relate to management’s future outlook and anticipated events or results and are based on the opinions and estimates of management at the time the statements are made. Forward-looking statements in this press release include, but are not limited to, statements regarding:
Forward-looking information is based on certain factors and assumptions described below and elsewhere in this press release, including, among other things: the current mine plan for the Ovoot Tolgoi mine; mining, production, construction and exploration activities at the Company’s mineral properties; the costs relating to anticipated capital expenditures; the capacity and future toll rate of the paved highway; plans for the progress of mining license application processes; mining methods; the Company's anticipated business activities, planned expenditures and corporate strategies; management’s business outlook, including the outlook for 2021 and beyond; currency exchange rates; operating, labour and fuel costs; the ability of the Company to raise additional financing; the anticipated royalties payable under Mongolia’s royalty regime; the future coal market conditions in China and the related impact on the Company’s margins and liquidity; the anticipated impact of the COVID-19 pandemic; the assumption that the border crossings with China will remain open for coal exports; the anticipated demand for the Company’s coal products; future coal prices, and the level of worldwide coal production. While the Company considers these assumptions to be reasonable based on the information currently available to it, they may prove to be incorrect. Forward-looking statements are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These risks and uncertainties include, among other things: the uncertain nature of mining activities, actual capital and operating costs exceeding management’s estimates; variations in mineral resource and mineral reserve estimates; failure of plant, equipment or processes to operate as anticipated; the possible impacts of changes in mine life, useful life or depreciation rates on depreciation expenses; risks associated with, or changes to regulatory requirements (including environmental regulations) and the ability to obtain all necessary regulatory approvals; the potential expansion of the list of licenses published by the Government of Mongolia covering areas in which exploration and mining are purportedly prohibited on certain of the Company's mining licenses; the Government of Mongolia designating any one or more of the Company’s mineral projects in Mongolia as a Mineral Deposit of Strategic Importance; the risk of continued restrictions on the number of trucks crossing the border at the Ceke port of entry; the risk that the import coal quality standards established by Chinese authorities will negatively impact the Company’s operations; the risk that Mongolia’s southern borders with China will be subject of closure; the negative impact of the COVID-19 pandemic on the demand for coal and the economy generally in China; the risk that the COVID-19 pandemic is not effectively controlled in China and Mongolia; the risk that the Company’s existing coal inventories are unable to sufficiently satisfy expected sales demand; the possible impact of changes to the inputs to the valuation model used to value the embedded derivatives in the CIC Convertible Debenture; the risk of the Company failing to successfully negotiate favorable repayment terms on the TRQ Reimbursable Amount (as described under section “Liquidity and Capital Resources” of this press release under the heading entitled “Liquidity and Capital Management – Costs Reimbursable to Turquoise Hill”); the risk of the Company or its subsidiaries defaulting under its existing debt obligations, including the CIC Convertible Debenture, the 2020 November Deferral Agreement, the Amended and Restated Cooperation Agreement and the 2021 July Deferral Agreement; the impact of amendments to, or the application of, the laws of Mongolia, China and other countries in which the Company carries on business; modifications to existing practices so as to comply with any future permit conditions that may be imposed by regulators; delays in obtaining approvals and lease renewals; the risk of fluctuations in coal prices and changes in China and world economic conditions; the outcome of the Class Action (as described under section “Regulatory Issues and Contingencies” of this press release under the heading entitled "Class Action Lawsuit") and any damages payable by the Company as a result; the risk that the Company is unable to successfully negotiate a debt restructuring plan with respect to the amounts owing to CIC; the risk that the calculated sales price determined by the Company for the purposes of determining the amount of royalties payable to the Mongolian government is deemed as being “non-market” under Mongolian tax law; customer credit risk; cash flow and liquidity risks; risks relating to the Company’s decision to suspend activities relating to the development of the Ceke Logistics Park project, including the risk that its investment partner may initiate legal action against the Company for failing to comply with the underlying agreements governing project development; risks relating to the ability of the Company to enhance the operational efficiency and the output throughput of the washing facilities at Ovoot Tolgoi; the risk that the Company is unable to successfully negotiate an extension of the agreement with the third party contractor relating to the operation of the wash plant at the Ovoot Tolgoi mine site and risks relating to the Company’s ability to raise additional financing and to continue as a going concern. This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements.
Due to assumptions, risks and uncertainties, including the assumptions, risks and uncertainties identified above and elsewhere in this press release, actual events may differ materially from current expectations. The Company uses forward-looking statements because it believes such statements provide useful information with respect to the currently expected future operations and financial performance of the Company, and cautions readers that the information may not be appropriate for other purposes. Except as required by law, the Company undertakes no obligation to update forward-looking statements if circumstances or management’s estimates or opinions should change. The reader is cautioned not to place undue reliance on the forward-looking statements, which speak only as of the date of this press release; they should not rely upon this information as of any other date.
The English text of this press release shall prevail over the Chinese text in case of inconsistencies.