Starcore Announces New Drilling Begins on New Gold Target at El Creston in Opodepe, Sonora State, Mexico

2021-11-08 / @newsfile

 

Vancouver, British Columbia--(Newsfile Corp. - November 8, 2021) - Starcore International Mines Ltd. (TSX: SAM) ("Starcore" or "the Company") is pleased to announce the start of DDH exploration on its MEZTLI 4 and TEOCUITLA claims located in Opodepe, Sonora, Mexico (see Fig.1). This first stage explores five different veins that were discovered after more than eight months of geological works with more than 2000 samples taken (see Fig. 2), and assays and metallurgical tests done (Fig. 3), the results of which formed the direction of the current exploration program (see Fig. 4).

As reported in its news release of August 17, 2021, the Opodepe project represents a three-dimensional prospect for Starcore with possibilities as a moly deposit, or as a property with gold showings, and thirdly as a project with the potential for copper porphyry at depth. These concessions of 11,364 hectares (the MEZTLI 4 claims) have never been explored for precious metals. With the acquisition of 3,087 hectares northwest of the MEZTLI 4 claims (the TEOCUITLA concessions), Starcore now has a total of 14,451 hectares to explore, with five veins identified thus far for the initial stage of drilling.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4479/102226_ed06d8d964ce1b29_002.jpg

Fig. 1 OPODEPE PROJECT LOCATION

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/4479/102226_ed06d8d964ce1b29_002full.jpg 

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4479/102226_ed06d8d964ce1b29_004.jpg

Fig. 2 MAP SHOWING THE 5 VEINS TO BE EXPLORED FIRST STAGE

To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/4479/102226_ed06d8d964ce1b29_004full.jpg

Fig. 3 TABLE OF ASSAYS LAB RESULTS

# TargetsTargetClaimRecognized surface length (mt)Economic length (mt) SurfaceEconomic width (mt) SurfaceAu g/tAg g/t
1Mana SystemMeztli 421003001.070.52250
2Karla System NW18152800.533.5213
3Nom5202000.554.1943
4El Guerigo18001100.980.11162
5San Gerónimo1961000.400.40120
6Midas VeinNew claims acquired5801900.730.20160
7La Aurora - La Espinada Veinold Dumps0.21241
8La ÚltimaOld mining non visited
9El OroOther claim500700.5310.305

 

 Fig. 4 DDH FIRST STAGE PROGRAM

DDH SCHEDULE 2021
TargetCompanyClaimHolesCategoryMeters
Mana SystemContractorMeztli 48Greenfield620
NomMeztli 47Greenfield630
El GuerigoMeztli 47Greenfield450
KarlasMeztli 43Greenfield500
MidasTeocuitla2Greenfield300
Total272500

 

Salvador Garcia, B. Eng., a director of the Company and Chief Operating Officer, is the Company's qualified person on the project as required under NI 43-101 and has prepared the technical information contained in this press release.

About Starcore

Starcore International Mines is engaged in precious metals production with focus and experience in Mexico. This base of producing assets is complemented by exploration and development projects throughout North America. The Company is a leader in Corporate Social Responsibility and advocates value driven decisions that will increase long term shareholder value. You can find more information on the investor friendly website here: www.starcore.com.

ON BEHALF OF STARCORE INTERNATIONAL MINES LTD.

Signed "Robert Eadie"
Robert Eadie, President & Chief Executive Officer

FOR FURTHER INFORMATION PLEASE CONTACT: 

EVAN EADIE
Investor Relations
Telephone: (604) 602-4935 x 203
Toll Free: 1-866-602-4935
Email: eeadie@starcore.com

The Toronto Stock Exchange has not reviewed, nor does it accept responsibility for the adequacy or accuracy of this press release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/102226

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok