For immediate release
6 January 2020
Serabi Gold plc
(“Serabi” or the “Company”)
Step out drilling at Sao Chico significantly extends resource beyond current mine limits
Serabi Gold plc (AIM:SRB, TSX:SBI), the Brazilian-focused gold mining and development company, is pleased to announce the results from its ongoing surface and underground exploration diamond drilling programme being undertaken on the Sao Chico orebody at its Palito Complex.
A PDF copy of this release including images can be accessed using the following link - https://bit.ly/2sQiyer
Highlights
Mike Hodgson, CEO of Serabi, commented:
“This is clearly excellent news for the Company. We are embarking on an aggressive surface and underground drilling programme mostly focusing in and around the Sao Chico orebody to assess its long-term potential. We have always seen the strong potential in and around Sao Chico and exploration success here is key to our next expansion plans should they be justified. These early drill results immediately extending the resource beyond the current mining limits have returned some excellent intersections over minable widths in all directions. Our initial plan is to drill over an area, beyond the current mine workings, of up to 300 metres to the east, 500 metres to the west, and approximately 250 metres at depth.
“The Company has completed approximately 20 per cent of the planned programmes, which are expected to be concluded by the end of June. Our objective is that the drill programme will provide enough new information to allow us to commission the preparation of an updated geological resource and mineral reserve for the Sao Chico orebody during Q3 2020.
“The recent start-up of the RC drilling into the large terrestrial geophysical anomalies just two kilometres to the west of the Sao Chico orebody is also very exciting. These anomalies, which we originally confirmed in November 2018, are quite spectacular when compared to the equivalent geophysical anomaly that overlies the Sao Chico orebody, which has produced approximately 75,000 ounces of gold to date. Strong exploration success here could lead to an expansion in production from the Sao Chico orebodies in the longer term. This programme should take approximately six months to complete although drilling will need to be suspended approximately every two months to allow for the processing of results.
“In the near term, operations have continued to perform well over the last quarter of 2019, and I was at site in December for the initial testing of our ore sorter. Further calibration work will be undertaken this quarter with the manufacturer at site this month. With the ore sorter being tested during this first quarter, we expect the first quarter’s gold production to be at similar levels to 2019, with the enhanced production impact being realised from the second quarter onwards. With this in mind, we anticipate 2020 production guidance of 45,000-46,000 ounces.
“To end, I am pleased to say that the fourth quarter’s production was strong and with final production statistics currently being reconciled, I anticipate providing the final quarter and the full year operational update very shortly.”
An interview with Mike Hodgson discussing this update on the exploration and operational activities of Serabi can be accessed using the following link.
https://www.brrmedia.co.uk/event/164611
SURFACE DRILLING ACTIVITIES
The Company is currently conducting step-out drill traverses, from surface and underground to the east, west and at depth in and around the Sao Chico mining limits. Results to date have established the continuation of payable mineralisation in all three directions.
This step out drilling is significant in that it further highlights the potential in the Sao Chico area for new discoveries within the Serabi’s tenement portfolio.
Significant grade intersections include:
Hole | Target | East | West | RL | Depth (m) | Dip/Azm | From | To | Apparent Width (m) | Real Width (m) | Gold Grade |
(UTM- WGS84) | (UTM- WGS84) | (°/°UTM) | (m) | (m) | (Au g/t) | ||||||
19-SC-141 | Highway | 614,209.21 | 9,290,370.41 | 249.04 | 220.84 | -54/201 | 195.20 | 195.67 | 0.47 | 3.34 | |
214.35 | 215.35 | 1.00 | 10.08 | ||||||||
19-SC-142 | Highway | 614,242.82 | 9,290,379.70 | 235.62 | 214.79 | -45/201 | 194.36 | 196.00 | 1.64 | 27.35 | |
incl. | 195.13 | 196.00 | 0.87 | 50.94 | |||||||
19-SC-143 | Highway | 614,243.04 | 9,290,380.17 | 235.59 | 256.19 | -55/201 | 225.60 | 227.10 | 1.50 | 16.61 | |
19-SC-144 | Highway | 614,294.54 | 9,290,360.95 | 232.09 | 192.80 | -45/198 | 168.31 | 168.95 | 0.64 | 5.36 | |
19-SC-145 | Highway | 614,280.86 | 9,290,365.13 | 231.99 | 220.95 | -48/200 | 159.00 | 161.10 | 2.10 | 8.64 | |
incl. | 159.75 | 160.50 | 0.75 | 23.46 | |||||||
19-SC-146 | Highway | 614,294.54 | 9,290,360.95 | 232.09 | 227.02 | -52/198 | 157.50 | 158.00 | 0.50 | 6.24 | |
19-SC-147 | Highway | 614,280.98 | 9,290,365.65 | 232.00 | 282.04 | -62/200 | 226.00 | 226.39 | 0.39 | 0.87 | |
19-SC-148 | Highway | 614,279.03 | 9,290,088.69 | 308.61 | 336.50 | -55/010 | 278.00 | 278.44 | 0.44 | 5.01 | |
19-SC-149 | Highway | 614,210.93 | 9,290,326.53 | 260.10 | 115.09 | -45/202 | 67.60 | 68.20 | 0.60 | 0.52 | |
77.70 | 78.25 | 0.55 | 2.26 | ||||||||
19-SC-151 | Highway | 614,212.04 | 9,290,326.89 | 260.12 | 120.40 | -45/162 | 72.00 | 73.00 | 1.00 | 0.83 | |
83.50 | 84.05 | 0.55 | 0.72 | ||||||||
97.09 | 99.00 | 1.91 | 0.52 | ||||||||
19-SCUD-219 | Main vein | 613,688.02 | 9,290,479.49 | 189.94 | 85.12 | -10/193 | 66.20 | 68.30 | 2.10 | 2.09 | 21.03 |
19-SCUD-222 | Main vein | 613,688.06 | 9,290,479.52 | 188.00 | 101.50 | -41/192 | 92.70 | 95.60 | 2.90 | 2.38 | 5.31 |
19-SCUD-241 | Main vein | 614,150.37 | 9,290,369.44 | 6.74 | 216.85 | -41/163 | 202.72 | 206.27 | 3.55 | 1.32 | 7.45 |
19-SCUD-248 | Main vein | 613,684.93 | 9,290,501.59 | 190.03 | 128.90 | -23/234 | 102.42 | 106.80 | 4.38 | 1.81 | 15.39 |
19-SCUD-252 | Main vein | 613,687.53 | 9,290,501.61 | 189.41 | 230.65 | -57/171 | 183.45 | 193.70 | 10.25 | 3.80 | 1.53 |
19-SCUD-253 | Main vein | 613,686.70 | 9,290,501.65 | 189.46 | 231.40 | -62/203 | 209.00 | 212.95 | 3.95 | 2.43 | 0.53 |
19-SCUD-255 | Main vein | 613,686.62 | 9,290,501.46 | 189.48 | 191.90 | -59/199 | 168.22 | 174.51 | 6.29 | 2.41 | 5.80 |
19-SCUD-258 | Main vein | 613,685.85 | 9,290,500.89 | -29.09 | 130.75 | -29/130 | 99.92 | 108.35 | 8.43 | 8.01 | 0.34 |
19-SCUD-259 | Main vein | 613,879.99 | 9,290,368.65 | -23.00 | 100.30 | -43/217 | 62.15 | 73.45 | 11.30 | 8.90 | 4.24 |
19-SCUD-261 | Main vein | 613,685.19 | 9,290,501.50 | 189.54 | 173.25 | -34/228 | 127.52 | 131.90 | 4.38 | 2.54 | 6.42 |
19-SCUD-265 | Main vein | 613,685.16 | 9,290,501.34 | 189.16 | 228.60 | -58/240 | 166.00 | 166.70 | 0.70 | 0.41 | 0.93 |
19-SCUD-266 | Main vein | 613,685.71 | 9,290,501.04 | 189.80 | 250.15 | -58/240 | 201.60 | 206.52 | 4.92 | 3.29 | 6.88 |
19-SCUD-268 | Main vein | 614,081.56 | 9,290,366.32 | 6.42 | 207.25 | -46/208 | 190.25 | 195.70 | 5.45 | 2.12 | 1.88 |
19-SCUD-271 | Main vein | 613,880.37 | 9,290,368.63 | -22.83 | 100.00 | -54/220 | 72.80 | 75.65 | 2.85 | 1.22 | 23.24 |
19-SCUD-272 | Main vein | 614,082.32 | 9,290,366.24 | 6.40 | 207.05 | -53/187 | 196.46 | 199.55 | 3.09 | 1.02 | 5.89 |
19-SCUD-274 | Main vein | 613,870.16 | 9,290,377.97 | -22.56 | 91.50 | -51/202 | 76.40 | 77.68 | 1.28 | 1.00 | 114.49 |
19-SCUD-275 | Main vein | 613,864.92 | 9,290,383.72 | -22.24 | 103.00 | -52/218 | 72.01 | 75.43 | 3.42 | 2.33 | 2.10 |
19-SCUD-278 | Main vein | 613,864.80 | 9,290,383.92 | -22.23 | 104.60 | -42/239 | 67.41 | 70.08 | 2.67 | 1.00 | 3.85 |
19-SCUD-279 | Main vein | 614,081.49 | 9,290,366.20 | 6.52 | 198.55 | -52/218 | 166.03 | 169.25 | 3.22 | 1.21 | 1.06 |
19-SCUD-280 | Main vein | 614,081.47 | 9,290,366.12 | 6.76 | 150.56 | -30/207 | 130.68 | 132.57 | 1.89 | 0.91 | 2.40 |
19-SCUD-281 | Main vein | 613,860.64 | 9,290,388.88 | -21.54 | 187.20 | -59/230 | 123.61 | 126.49 | 2.88 | 1.02 | 2.83 |
19-SCUD-284 | Main vein | 613,790.84 | 9,290,344.82 | -32.26 | 55.20 | -54/057 | 35.74 | 44.91 | 9.17 | 1.23 | 34.32 |
Note: Reported intercepts are calculated based on a minimum weighted average grade of 0.3g/t Au using a 0.5g/t Au weighted average lower cut and a maximum internal waste interval of 1.2m based on Palito Laboratory reported analyses. All assays were completed by Palito Laboratory using a 30gm DIBK aqua regia charge with an AAS analysis. Palito Assays are not certified analyses (please refer to the footnote at the end of this release for further details).
To access an image illustrating a long section of the orebody with location of drilling intercepts and key results, please use the following link - https://bit.ly/2SXaXWe
This announcement is inside information for the purposes of Article 7 of Regulation 596/2014.
The person who arranged for the release of this announcement on behalf of the Company was Clive Line, Director.
Enquiries:
Serabi Gold plc | |
Michael Hodgson | Tel: +44 (0)20 7246 6830 |
Chief Executive | Mobile: +44 (0)7799 473621 |
Clive Line | Tel: +44 (0)20 7246 6830 |
Finance Director | Mobile: +44 (0)7710 151692 |
Email: contact@serabigold.com | |
Website: www.serabigold.com | |
Beaumont Cornish Limited Nominated Adviser and Financial Adviser | |
Roland Cornish | Tel: +44 (0)20 7628 3396 |
Michael Cornish | Tel: +44 (0)20 7628 3396 |
Peel Hunt LLP UK Broker | |
Ross Allister | Tel: +44 (0)20 7418 8900 |
James Bavister | Tel: +44 (0)20 7418 8900 |
Copies of this announcement are available from the Company's website at www.serabigold.com.
Neither the Toronto Stock Exchange, nor any other securities regulatory authority, has approved or disapproved of the contents of this announcement.
GLOSSARY OF TERMS
The following is a glossary of technical terms:
“Au” means gold.
“assay” in economic geology, means to analyse the proportions of metal in a rock or overburden sample; to test an ore or mineral for composition, purity, weight or other properties of commercial interest.
“development” - excavations used to establish access to the mineralised rock and other workings
“DNPM” is the Departamento Nacional de Produção Mineral.
“grade” is the concentration of mineral within the host rock typically quoted as grammes per tonne (g/t), parts per million (ppm) or parts per billion (ppb).
“g/t” means grams per tonne.
“granodiorite” is an igneous intrusive rock similar to granite.
“igneous” is a rock that has solidified from molten material or magma.
“Intrusive” is a body of igneous rock that invades older rocks.
“on-lode development” - Development that is undertaken in and following the direction of the Vein
“mRL” – depth in metres measured relative to a fixed point – in the case of Palito and Sao Chico this is sea-level. The mine entrance at Palito is at 250mRL.
“saprolite” is a weathered or decomposed clay‐rich rock.
“stoping blocks” – a discrete area of mineralised rock established for planning and scheduling purposes that will be mined using one of the various stoping methods.
“vein” is a generic term to describe an occurrence of mineralised rock within an area of non-mineralised rock.
Assay Results
The assay results reported in the table within this release are those provided by the Company's own on-site laboratory facilities at Palito and have not been independently verified. Serabi closely monitors the performance of its own facility against results from independent laboratory analysis for quality control purpose. As a matter of normal practice the Company sends duplicate samples derived from a variety of the Company's activities to accredited laboratory facilities for independent verification. Based on the results of this work, the Company's management are satisfied that the Company's own facility shows good correlation with independent laboratory facilities. The Company would expect that in the preparation of any future independent Reserve/Resource statement undertaken in compliance with a recognised standard, the independent authors of such a statement would not use Palito assay results but only use assay results reported by an appropriately certificated laboratory.
Qualified Persons Statement
The scientific and technical information contained within this announcement has been reviewed and approved by Michael Hodgson, a Director of the Company. Mr Hodgson is an Economic Geologist by training with over 26 years' experience in the mining industry. He holds a BSc (Hons) Geology, University of London, a MSc Mining Geology, University of Leicester and is a Fellow of the Institute of Materials, Minerals and Mining and a Chartered Engineer of the Engineering Council of UK, recognising him as both a Qualified Person for the purposes of Canadian National Instrument 43-101 and by the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009.
Forward Looking Statements
Certain statements in this announcement are, or may be deemed to be, forward looking statements. Forward looking statements are identified by their use of terms and phrases such as ‘‘believe’’, ‘‘could’’, “should” ‘‘envisage’’, ‘‘estimate’’, ‘‘intend’’, ‘‘may’’, ‘‘plan’’, ‘‘will’’ or the negative of those, variations or comparable expressions, including references to assumptions. These forward looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding the Company’s future growth, results of operations, performance, future capital and other expenditures (including the amount, nature and sources of funding thereof), competitive advantages, business prospects and opportunities. Such forward looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors. A number of factors could cause actual results to differ materially from the results discussed in the forward looking statements including risks associated with vulnerability to general economic and business conditions, competition, environmental and other regulatory changes, actions by governmental authorities, the availability of capital markets, reliance on key personnel, uninsured and underinsured losses and other factors, many of which are beyond the control of the Company. Although any forward looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions, the Company cannot assure investors that actual results will be consistent with such forward looking statements.
ENDS
Attachment