TORONTO, March 01, 2018 (GLOBE NEWSWIRE) -- Stratabound Minerals Corp. (TSXV:SB) (“Stratabound” or “the Company”) is pleased to announce that the Company will be attending PDAC March 4 through 7 in Toronto and will be presenting its newly optioned Golden Culvert Project at the conference.
We will also be presenting detailed talks followed by discussion at the Yukon Geological Survey booth #528 in the PDAC Trade Show area according to the following schedule:
Sunday, March 4 at 11:00AM
Monday, March 5 at 1:30PM
Kim Tyler, our President and CEO, and Mike Page, our Vice President Exploration, will be available after the talks for questions and answers. The discussions will cover the geological similarities and distinctions between Stratabound’s Golden Culvert Project and the nearby 3 Aces Project.
Please visit Stratabound at Booth # 3243 in the Investors Exchange throughout PDAC.
Mr. R. Kim Tyler, P.Geo., President and CEO of Stratabound, is a “Qualified Person” for the purpose of NI 43-101 and has reviewed and approved the contents of this news release.
About the Golden Culvert and Little Hyland Properties
Golden Culvert and Little Hyland cover 83.8 square kilometres across a 24-kilometre strike located approximately 20 kilometres northeast of and parallel to Golden Predator Mining Corp.’s 3 Aces property. Work filed in Yukon mineral claims assessment reports has outlined a northerly trending, 3 kilometre by 250 metre, +30 ppb Au up to 791 ppb Au gold-in-soil anomaly that remains open at both ends. The soil anomaly is centred around partially exposed primary gold-bearing quartz veins grading between 7.7 to 22.8 gpt gold over 1 metre and complimentary gold-bearing quartz vein stockwork within a larger silicified, altered, sulphide and gold-bearing wallrock grading up to 2.27 gpt gold over 0.5 metre.
To date a total of $564,400 of work has been done on the Property, including 3,645 soil samples, 48 stream samples, 239 rock samples, 19.4 line-km of ground magnetic survey and 18.5 line-km of VLF survey.
For further information, please see the Golden Culvert presentation and the NI 43-101 technical report on the Stratabound web site, www.stratabound.com.
About Stratabound
Stratabound Minerals Corp. is a Canadian exploration and development company focused on the Yukon Territory and to a lesser extent the Bathurst Mining Camp in New Brunswick. Stratabound has a portfolio of quality properties including:
Stratabound management also has a diversified track record of exploration, development and operating successes that includes the Kemess mine in British Columbia; the Colomac mine in the Northwest Territories; the Nighthawk Lake mine in Timmins, Ontario; the Matachewan mine in Ontario; the Pine Point project in the Northwest Territories; rescuing the Caribou mine in New Brunswick from an insolvency auction; Olympic Dam mine in Australia, the Siguiri gold project in Guinea; Norilsk Nickel’s projects in Siberia and Western Australia; and Vale and Rio Tinto Minerals in North America.
For further information contact:
R. Kim Tyler, President and CEO
416-915-4157
info@stratabound.com
www.stratabound.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
WARNING: The Company relies upon litigation protection for “forward looking” statements. The information in this release may contain forward-looking information under applicable securities laws. This forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those implied by the forward-looking information. Factors that may cause actual results to vary materially include, but are not limited to, inaccurate assumptions concerning the exploration for and development of mineral deposits, currency fluctuations, unanticipated operational or technical difficulties, changes in laws or regulations, failure to obtain regulatory, exchange or shareholder approval, the risks of obtaining necessary licenses and permits, changes in general economic conditions or conditions in the financial markets and the inability to raise additional financing. Readers are cautioned not to place undue reliance on this forward-looking information. The Company does not assume the obligation to revise or update this forward-looking information after the date of this release or to revise such information to reflect the occurrence of future unanticipated events, except as may be required under applicable securities laws.