Vancouver, British Columbia--(Newsfile Corp. - January 31, 2023) - Tembo Gold Corp. (TSXV: TEM) (FSE: T23A) ("Tembo" or the "Company") is pleased to announce further encouraging Ngula 1 target results from the ongoing diamond drilling campaign on the Company's Tembo Project in Tanzania. The Company planned a 7,000m programme of drilling of which 4,648m was completed before the drillers break commenced in December, drilling recently recommenced and is expected to be completed by the end of February. All drillholes intersected gold mineralization with one exception and a previously recognized, but undrilled cross structure, returned significant gold intersections associated with abundant sulphide, strong deformation and alteration.
Highlights
Ngula 1
2022
NGULA 1 | >0.50g/t | >2.00g/t | ||||||
TDD0159 | 110.63 | 111.51 | 0.88 | 1.06 | 0.88 | 1.06 | ||
113.39 | 113.85 | 0.46 | 1.24 | 0.46 | 1.24 | |||
117.00 | 117.41 | 0.41 | 0.73 | 3.08 | 1.24 | |||
117.41 | 118.11 | 0.70 | 0.82 | |||||
118.11 | 118.41 | 0.30 | 2.47 | 0.89 | 2.38 | |||
118.41 | 119.00 | 0.59 | 2.34 | |||||
119.00 | 119.62 | 0.62 | 0.27 | |||||
119.62 | 120.08 | 0.46 | 1.43 | |||||
TDD0160 | 107.18 | 107.77 | 0.59 | 1.18 | 1.93 | 5.22 | ||
107.77 | 108.23 | 0.46 | 6.84 | 0.89 | 10.07 | |||
108.23 | 108.66 | 0.43 | 13.52 | |||||
108.66 | 109.11 | 0.45 | 0.95 | |||||
116.39 | 116.87 | 0.48 | 4.22 | 1.54 | 2.73 | 1.06 | 3.13 | |
116.87 | 117.45 | 0.58 | 2.23 | |||||
117.45 | 117.93 | 0.48 | 1.84 | |||||
199.55 | 200.00 | 0.45 | 2.16 | 1.07 | 1.36 | 0.45 | 2.16 | |
200.00 | 200.62 | 0.62 | 0.78 | |||||
234.58 | 235.16 | 0.58 | 0.65 | 0.58 | 0.65 | |||
TDD0161 | 54.43 | 55.43 | 1.00 | 2.03 | 3.07 | 1.64 | 1.00 | 2.03 |
55.43 | 56.00 | 0.57 | 1.94 | |||||
56.00 | 56.56 | 0.56 | 0.59 | |||||
56.56 | 56.91 | 0.35 | 0.94 | |||||
56.91 | 57.50 | 0.59 | 2.12 | 0.59 | 2.12 | |||
61.88 | 62.46 | 0.58 | 0.59 | 0.58 | 0.59 | |||
68.86 | 69.20 | 0.34 | 0.67 | 0.34 | 0.67 | |||
69.68 | 70.23 | 0.55 | 0.66 | 0.55 | 0.66 | |||
TDD0168 | 236.95 | 237.85 | 0.90 | 0.58 | 0.90 | 0.58 | ||
239.43 | 239.73 | 0.30 | 1.93 | 2.57 | 0.68 | |||
239.73 | 240.60 | 0.87 | 0.39 | |||||
240.60 | 241.32 | 0.72 | 0.40 | |||||
241.32 | 242.00 | 0.68 | 0.80 | |||||
252.56 | 253.00 | 0.44 | 1.14 | 0.44 | 1.14 | |||
TDD0169 | 102.76 | 103.26 | 0.50 | 2.22 | 0.50 | 2.22 | ||
159.22 | 159.83 | 0.61 | 1.64 | 2.78 | 0.82 | |||
159.83 | 160.53 | 0.70 | 0.89 | |||||
160.53 | 161.22 | 0.69 | 0.33 | |||||
161.22 | 162.00 | 0.78 | 0.56 | |||||
173.05 | 173.56 | 0.51 | 1.68 | 1.32 | 1.55 | |||
173.56 | 174.07 | 0.51 | 1.05 | |||||
174.07 | 174.37 | 0.30 | 2.18 | 0.30 | 2.18 | |||
TDD0170 | 223.70 | 224.00 | 0.30 | 0.59 | 0.30 | 0.59 | ||
229.13 | 229.87 | 0.74 | 0.87 | 0.74 | 0.87 | |||
278.58 | 278.97 | 0.39 | 1.03 | 0.81 | 0.80 | |||
278.97 | 279.39 | 0.42 | 0.59 | |||||
281.50 | 281.80 | 0.30 | 0.58 | 0.30 | 0.58 | |||
283.25 | 283.55 | 0.30 | 1.47 | 0.30 | 1.47 | |||
TDD0172 | 118.49 | 119.18 | 0.69 | 0.61 | 3.85 | 4.14 | ||
119.18 | 119.87 | 0.69 | 3.11 | 2.08 | 7.03 | |||
119.87 | 120.40 | 0.53 | 1.17 | |||||
120.40 | 121.26 | 0.86 | 13.78 | |||||
121.26 | 121.77 | 0.51 | 1.15 | |||||
121.77 | 122.34 | 0.57 | 0.58 | |||||
TDD0173 | 32.05 | 32.69 | 0.64 | 0.98 | 0.64 | 0.98 | ||
TDD0174 | 35.24 | 35.81 | 0.57 | 19.90 | 0.57 | 19.90 | ||
39.55 | 40.00 | 0.45 | 0.92 | 0.45 | 0.92 | |||
TDD0175 | No significant results | |||||||
TDD0176 | 69.00 | 70.00 | 1.00 | 0.72 | 1.00 | 0.72 | ||
72.45 | 73.45 | 1.00 | 1.47 | 5.28 | 1.68 | |||
73.45 | 74.35 | 0.90 | 0.51 | |||||
74.35 | 75.14 | 0.79 | 0.76 | |||||
75.14 | 75.49 | 0.35 | 1.85 | |||||
75.49 | 76.42 | 0.93 | 2.22 | |||||
76.42 | 77.17 | 0.75 | 2.27 | |||||
77.17 | 77.73 | 0.56 | 3.43 |
Figure 1. Ngula 1 best intersections to date
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2214/153003_2881471154d758e8_004full.jpg
Tembo Exploration Manager, Hendrik Meiring, commented, "The recent completed drilling provided us with additional geological information that has contributed to a more advanced understanding of possible areas of enrichment in mineralization along known existing mineralized structures at Ngula 1 and an ongoing detailed structural study will assist us in targeting future planned drilling targets and possible extension along strike of known mineralized structures."
Tembo President & CEO, David Scott, stated, "Ngula 1 target has once again returned an encouraging set of results, and highlighted the potential of the newly drilled northeast trending cross structure hosting very good mineralization. It is key that we now analyze the structural data this drilling has provided in anticipation of a resource drill out as we pursue the high-grade zones along the plunges, as well as the main gold bearers along strike and down dip."
The above information has been prepared under the supervision of Hendrik Meiring, Pr. Sci. Nat., who is designated as a "Qualified Person" with the ability and authority to verify the authenticity and validity of the data.
QA/QC
A stringent QA/QC practice is applied to all sample batches. A Verified Reference Material standard is inserted every 20th sample, a known blank or blank standard every 20th sample and all samples with assays greater than 0.5g/t are re-assayed. 1% of all samples are submitted to an alternative laboratory for check analysis. In addition the laboratory adheres to an internal QA/QC procedure including standard samples and repeats and blanks inserted independently.
Widths represent drill intersection widths not corrected for drill hole inclination and dip of the geological zone. True widths have not been determined. The drill hole inclination of 60deg and sub vertical dip of the structures suggests that the true width will be approximately 86% of the intersected width.
Drill holes have not been drilled in numerical sequence and not all drill holes in a sequence have necessarily been drilled. Drill hole numbers represent the original drill hole identification assigned when planned.
No capping of high-grade values has been applied to the assay results.
About Tembo Gold Corp.
Tembo Gold is a Canadian public company listed on the TSX Venture Exchange ("TSX-V") under the symbol TEM. The Company currently has 100% interest in the Tembo Gold Project which is located adjacent to Barrick's 20Moz Bulyanhulu Mine in the prolific Lake Victoria Greenstone belt in Tanzania. Our focus is the discovery and development of world-class gold projects in Africa. The company has assembled a highly experienced team with a proven history of developing, financing, and operating mining projects in Africa. The Company's exploration strategy is to discover mineral resources as well as continue to look for additional opportunities that can bring value to the Company and shareholders.
On Behalf of the Board of Directors of Tembo, David Scott, President & CEO
David Scott
President & CEO
Phone: +255 767 366 146
Email: dscott@tembogold.com
For more information please contact:
Simon Benstead
Director & CFO
Phone: 604-685-9316
Email: sbenstead@tembogold.com
Marc Cernovitch
Director
Phone: 604-685-9316
Email: mcernovitch@tembogold.com
Forward-Looking Statements
Certain information set out in this news release constitutes forward-looking information. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "estimate", "expect", "may", "will", "intend", "could", "might", "should", "believe" and similar expressions. Forward-looking statements are based upon the opinions and expectations of management of the Company as at the effective date of such statements and, in certain cases, information provided or disseminated by third parties. Although the Company believes that the expectations reflected in such forward-looking statements are based upon reasonable assumptions, and that information obtained from third party sources is reliable, they can give no assurance that those expectations will prove to have been correct. With respect to forward-looking statements contained in this news release, the Company has made assumptions regarding, among other things, the ability to develop the Company's properties, the economic climate in the jurisdictions where the Company carries on operations and commodity prices. Although the Company believes that the expectations reflected in the forward-looking statements contained in this document, and the assumptions on which such forward-looking statements are made, are reasonable, there can be no assurance that such expectations will prove to be correct. Readers are cautioned not to place undue reliance on forward-looking statements included in this document, as there can be no assurance that the plans, intentions or expectations upon which the forward-looking statements are based will occur. By their nature, forward-looking statements involve numerous assumptions, known and unknown risks and uncertainties that contribute to the possibility that the predictions, forecasts, projections and other forward-looking statements will not occur, which may cause actual results in future periods to differ materially from any estimates or projections of future performance or results expressed or implied by such forward-looking statements. These risks and uncertainties include, among other things, a significant drop in the price of gold, political turmoil in Tanzania and other risk factors set forth in the Company's continuous disclosure. Readers are cautioned that this list of risk factors should not be construed as exhaustive. These statements are made as at the date hereof and unless otherwise required by law, the Company does not intend, or assume any obligation, to update these forward-looking statements.
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/153003