Teras Expands Its Position on Its Watseka Project with High Value Ground

2022-08-18 / @newsfile

 

Calgary, Alberta--(Newsfile Corp. - August 18, 2022) - Teras Resources Inc. (TSXV: TRA) (OTC Pink: TRARF) ("Teras" or the "Company") reports that it has further increased its land position on its Watseka gold property in Madison County Montana with high value ground.

Teras' Watseka property consists of 12 patented mining claims owned by Teras and in excess of 24 claims that are leased from private land owners as well as BLM land. The Watseka property currently has a Mill Site housing a main building and equipment for processing ore as well as a separate building with Lab equipment for analysing ore to be mined and processed. The Mill and Mine Site is located in the Rochester Mining District, Madison County, Montana, on the east slope of the continental divide. Primary access to the mine site is via county roads leading from a State Highway and which are maintained throughout the year by State and Federal funds.

Mr. Joseph Carrabba, CEO of Teras, stated, "We are excited with the advancement of our Watseka project in obtaining additional land. This gives Teras the strike length it needs to develop Watseka. The newly acquired land has historical drill results which provides Teras the land position as well as historical assay results along the strike of the Watseka vein including all lands within the project area to pursue a NI 43-101 technical report. The go forward plan for Watseka is to twin a couple of the historical holes and upgrade the NI 43-101 technical report to a Resource report. We are eager to advance Watseka into a mining operation within our onsite facility. Further advancements will be released in the near future."

About Teras

Teras main project is its Cahuilla project located in Imperial County, California.

For further project and corporate information, contact:

Teras Resources Inc.
Peter Leger, Director / Senior Consultant
(403) 262-8411
(403) 852-0644
Email: pleger@teras.ca
Website: www.teras.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy of accuracy of this news release.

This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein may be forward-looking information. Generally, forward-looking information may be identified by the use of forward-looking terminology such as "plans", " expects" or "does not expect", "proposed", "is expected", "budgets", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases, or by the use of words or phrases which state that certain actions, events or results may, could, would, or might occur or be achieved. In particular, this press release contains forward-looking information regarding: the ability to raise the capital needed for the companies project, the development and advancement of the project, the development of the geologic model in respect of the project, the development of further drill plans in relation to the project and the potential of the project to develop into a mining operation. This forward-looking information reflects the Company's current beliefs and is based on information currently available to the Company and on assumptions the Company believes are reasonable. These assumptions include, but are not limited to, the actual results of exploration projects being equivalent to or better than estimated results in technical reports or prior exploration results, future costs and expenses being based on historical costs and expenses, adjusted for inflation, the ability of the Company to obtain acceptable financing, market acceptance of its exploration programs and projects; consistent and favorable commodity prices; and regulatory acceptance of the Company's geologic models . Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information. Such risks and other factors may include, but are not limited to: the early stage development of the Company and its projects; general business, economic, competitive, political and social uncertainties; commodity prices; the actual results of current exploration and development or operational activities; competition; changes in project parameters as plans continue to be refined; accidents and other risks inherent in the mining industry; lack of insurance; delay or failure to receive board or regulatory approvals; changes in legislation, including environmental legislation, affecting the Company; timing and availability of external financing on acceptable terms; conclusions of economic evaluations; and lack of qualified, skilled labour or loss of key individuals. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/134114

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok