Trek Mining Continues to Intersect Significant Gold Mineralization at Piaba West

2017-06-27 / @nasdaq

 

VANCOUVER, British Columbia, June27, 2017(GLOBE NEWSWIRE) -- Trek Mining Inc. (TSX-V:TREK) ("Trek Mining" or "the Company") is pleased to announce that ongoing drilling continues to intersect significant gold mineralization below the shallow, westernmost reserve pit and beyond the current pit limit along the western strike at the Company's 100%-owned Aurizona Gold Mine ("Aurizona") in Brazil.

Further to the May 17, 2017 news release, an additional 13 shallow step-out and infill drill holes totalling 1,486 metres from the exploration program at Piaba West have encountered multiple broad intersections of gold mineralization with grades typical of the Piaba gold deposit. In addition, drill hole BRAZP587, which was collared just beyond the westernmost edge of the existing Piaba pit, encountered two narrow, high-grade intercepts that returned gold values of 19.65 grams per tonne gold ("g/t Au") over 1.0 metre ("m") and 67.09 g/t Au over 5.0 m including 329.00 g/t Au over 1.0 m.

Drilling highlights include:

  • 1.90 g/t Au over 25.0 m in BRAZD529
  • 1.11 g/t Au over 11.0 m in BRAZD530
  • 0.73 g/t Au over 19.0 m BRAZD531
  • 1.64 g/t Au over 18.5 m including 3.69 g/t Au over 5.0 m in BRAZD532
  • 1.53 g/t Au over 43.0 m including 6.05 g/t Au over 6.0 m BRAZP584
  • 19.65 g/t Au over 1.0 m and 67.09 g/t Au over 5.0 m including 329.00 g/t Au over 1.0 m BRAZP587
  • 1.10 g/t Au over 11.0 m and 1.13 g/t Au over 19.0 m in BRAZP590
  • 1.21 g/t Au over 39.0 m BRAZP591

"Drilling in the western extension of the Piaba gold deposit continues to intersect broad zones of ore-grade gold mineralization on strike and to depth," said Scott Heffernan, EVP Exploration of Trek Mining. "These results further confirm the potential for significant resource growth at Piaba."

  • For a complete table of the Company's 2017 exploration drill results to date, click here
  • For a map showing the Company's 2017 exploration drill holes and highlight results to date, click here
  • For an illustrative cross-section including specific recent intercepts from the Company's 2017 exploration drill results to date, click here

Approximately 7,000 metres of drilling has been completed at Piaba West this year. Additional drill results will be released as assay results are received. This first pass program, designed to extend mineralization to depth and on strike, is nearly complete. A follow-up campaign focusing on any required infill drilling is planned to start in late July and will be carried out concurrent with a regional exploration campaign designed to test several high-potential near-mine targets.

Current gold reserves at Aurizona are contained primarily within the Piaba gold deposit which remains open along strike and to depth. Piaba West is a potential 900-metre long extension of the Piaba gold deposit and is the first of several near-mine targets to be drilled as part of the Company's planned 30,000-metre 2017 exploration program at Aurizona. Drilling to date has successfully demonstrated that the Piaba gold deposit extends along strike at least 300 metres to the west. Testing of the additional 600 metres of westerly strike will commence upon receipt and interpretation of a recently completed 38,000 line-km airborne magnetic and radiometric survey.

On behalf of the Board of Trek Mining Inc.

"Christian Milau"

CEO & Director

About the Aurizona Gold Mine

The current reserve and resource model for Aurizona outlines a 6.5-year mine life based on reserves identified in the Piaba and Boa Esperan??a pits. Gold mineralization is structurally controlled by subvertical, strike-slip shear zones occurring along significant lithological contact between metavolcano-sedimentary units and intrusive rocks. Host rocks are hydrothermally altered quartz diorite and plagioclase-quartz diorite rocks. The mineralization style is disseminated stockwork and vein-hosted sulphides and gold within a silicified shear zone. Gold mineralization at Piaba West is hosted in a northern, hanging wall sequence composed mainly of diorite and quartz diorite intrusives with subordinate dacitic volcanics. Additional information about Aurizona is available in the September 2016 "Pre-feasibility Study on Aurizona Mine Project, Maranh??o, Brazil, NI 43-101 Technical Report" that is available on the Company's website and on SEDAR at www.sedar.com.

About Trek Mining Inc.

Trek Mining is a Canadian mining company with a portfolio of production, near-production and exploration-stage projects in North and South America. The Company is producing gold from its Koricancha Mill, a custom-built gold and silver ore processing facility in Peru, and is completing a feasibility study for its past-producing Aurizona Gold Mine in Brazil, with the objective of pouring gold at Aurizona by the end of 2018. Trek Mining's exploration properties include both near-mine and district exploration opportunities at Aurizona; the Warintza project, a porphyry copper-molybdenum exploration project in Southeastern Ecuador; the Ricardo project, a porphyry copper-molybdenum exploration project in Chile; and Elk Gold, a past-producing high-grade gold mine in British Columbia, Canada. Further information about the Company's business strategy and portfolio of assets is available at www.trekmining.com or by email at ir@trekmining.com.

Qualified Person and Disclosure Statement

Scott Heffernan, M.Sc., P.Geo., the Company's EVP Exploration and Qualified Person under National Instrument 43-101, has reviewed and verified that the technical information contained in this news release is accurate and approves the written disclosure of the same. Drill composites were calculated using cut-off values of 0.3 g/t, 1.0 g/t or 5.0 g/t gold as specified in the drill table and contain no more than 3 metres of internal waste. Drill intersections are calculated using uncut assays and are reported as drilled thicknesses. True widths of the mineralized intervals are interpreted to be 60 to 90 percent of the reported lengths. All samples were submitted to ALS Chemex in Belo Horizonte, Brazil for sample preparation. Sample pulps were then sent to ALS Chemex in Lima, Peru for geochemical analysis for gold by fire assay of a 30-gram charge with an Atomic Absorption finish (AA) and for a 33 multi-element geochemical suite by 4-acid digestion and Inductively-Coupled Mass Spectrometry (ICP-MS). Samples with AA gold values over 10.0 g/t are re-assayed by Screen Metallics fire assay. Control samples (accredited standards, blanks and duplicate samples at the field and preparation stages) were inserted on a regular basis. Results were monitored upon receipt of assays.

Cautionary Notes

Neither the TSX Venture Exchange nor its Regulation Services Provider (as such term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This document contains certain forward-looking information and forward-looking statements within the meaning of applicable securities legislation (collectively "forward-looking statements"). The use of the words "will", "should", "could", "expected", "potential" and similar expressions are intended to identify forward-looking statements. Forward-looking statements contained in this press release include statements regarding planned exploration activities and drill results at Aurizona, and the anticipated restart of production at Aurizona. Although Trek Mining believes that the expectations reflected in such forward-looking statements and/or information are reasonable, undue reliance should not be placed on forward-looking statements since Trek Mining can give no assurance that such expectations will prove to be correct. These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements, including the risks, uncertainties and other factors identified in Trek Mining's periodic filings with Canadian securities regulators, and assumptions made with regard to: the anticipated results of exploration activities at Aurizona; whether exploration activities will lead to an increase in Aurizona resources and an extension of the Aurizona mine life; the anticipated results of the feasibility study for Aurizona; the anticipated Board of Directors decision to approve construction of the Aurizona mine; the ability to raise the capital required to fund construction and development of Aurizona; the ability to restart production at Aurizona; and timing of the anticipated restart of production. Furthermore, the forward-looking statements contained in this news release are made as at the date of this news release and Trek Mining does not undertake any obligations to publicly update and/or revise any of the included forward-looking statements, whether as a result of additional information, future events and/or otherwise, except as may be required by applicable securities laws.

Trek Mining Contacts

Christian Milau, Chief Executive Officer
Rhylin Bailie, Vice President Investor Relations
Tel: +1 604-558-0560
Email: ir@trekmining.com

Primary Logo

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok