Adriatic reports 2022 drilling campaign

February 27, 2023 / www.mining-journal.com / Article Link

The Rupice underground deposit comprises part of Adriatic's flagship Vares silver project, in Bosnia.

Among the thirteen holes drilled was an intercept of 34.5m at 987.

Recent News

Gold stocks down on metal dip and equities drop

October 19, 2026 / www.canadianminingreport.com

Mining stocks drop, but outperform tech plunge

October 19, 2026 / www.canadianminingreport.com

Gold stocks gain on move back into metal

October 12, 2026 / www.canadianminingreport.com

Silver stocks gain over past year even as metal price weak

October 12, 2026 / www.canadianminingreport.com

Copper price estimates boosted by AOCE

October 05, 2026 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok