BlueRock Diamonds to ramp up production in 2018 at Kareevlei mine

By Andrew Scott / March 01, 2018 / www.proactiveinvestors.co.uk / Article Link

Adam Waugh, chief executive of BlueRock Diamonds PLC (LON:BRD), tells Proactive they're expecting to ramp up production this year at the Kareevlei diamond mine in South Africa as they operate from the upgraded plant.

Waugh estimates they can achieve an average grade of between 3.5 carats per hundred tonnes (cpht) and 4.5 cpht, indicating total production of between 9,500 and 12,500 carats.

Last year the mine, located in the Kimberley region, produced 3,728 carats.

 Meet Scancell Holdings Plc, Advanced Blast & Ballistic Systems Ltd and TokenCommunities Plc at our event, London, 08 March 2018.Register here >>

Recent News

Mixed outlook for gold as it remains range bound for past three months

June 30, 2025 / www.canadianminingreport.com

Gold stocks down on flat metal price

June 30, 2025 / www.canadianminingreport.com

Gold stocks down on metal decline

June 23, 2025 / www.canadianminingreport.com

Huge quantifiable rise in geopolitical, economic and trade risks

June 23, 2025 / www.canadianminingreport.com

Platinum clearly ahead of palladium for first time in seven years

June 16, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok