First ore processed at Cobre Panama

By Staff Reporter / February 14, 2019 / www.mining-journal.com / Article Link

Alderan unlocking Frisco potential

SPONSORED

alderan resources

Alderan unlocking Frisco potentialsponsored-logo

The Toronto-headquartered company said Wednesday the ore passed through the primary crushing circuit last week at initial feed rates of 4,000-5,000t/h, before being placed into the first completed milling circuit.

In the coming weeks the focus will remain on hot commissioning to move the ore throughout the plant until the first copper concentrates are produced.

Alderan unlocking Frisco potential

SPONSORED

alderan resources

Alderan unlocking Frisco potentialsponsored-logo

The company said it was now focused on an efficient phased ramp-up for Cobre Panama through 2019, with the goal of producing 150,000t of copper in concentrate by year-end. At its peak Cobre Panama is expected to produce 350,000t/y copper.

First Quantum in February last year approved a 15% expansion to 85Mt/y by 2020 and plans to take throughput to 100Mt/y by 2022.

At the current price of C$13.80, the company (TSX:FM) is trading 40% below its 12-month high of $23.05 and is currently capitalised at $9.5 billion.

Recent News

Gold and silver price ETFs see major net outflows

November 04, 2025 / canadianminingreport.com

Gold stocks decline by less than metal price

November 04, 2025 / www.canadianminingreport.com

A shift to the later stages of gold and silver bull markets

October 27, 2025 / www.canadianminingreport.com

Gold stocks plunge on metal drop

October 27, 2025 / www.canadianminingreport.com

Gold stocks still up after pullback late in the week

October 20, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok