Friedland's Ivanhoe picks up the pace in DRC

November 08, 2022 / www.mining-journal.com / Article Link

The Kamoa-Kakula project in the Democratic Republic of the Congo has produced at an annualised rate of over 400,000t of floated and filtered copper for the second month in a row.

Recent News

Big Gold still struggling overall in 2026

September 28, 2026 / www.canadianminingreport.com

Gold stocks down on metal price pullback

September 28, 2026 / www.canadianminingreport.com

Mining sector far outpaces tech over past three years

September 21, 2026 / www.canadianminingreport.com

Gold stocks down with GDXJ outperforming on rebalancing

September 21, 2026 / www.canadianminingreport.com

Copper slides as US apparently wavering on tariff hikes

September 14, 2026 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok