Marimaca hits copper mineralisation under pit limit

October 13, 2021 / www.mining-journal.com / Article Link

3 things that help keep capital projects on track

SPONSORED

proudfoot

3 things that help keep capital projects on trackpartner-logo

American Pacific building US copper position

SPONSORED

american pacific mining

American Pacific building US copper positionsponsored-logo

Concession and pre-construction accelerates world class Potash Mine

SPONSORED

highfield resources

Concession and pre-construction accelerates world class Potash Minesponsored-logo

Antipa demonstrates high Calibre

SPONSORED

antipa minerals

Antipa demonstrates high Calibresponsored-logo

Some 3,120m were drilled in 12 re-entry reverse circulation holes as extensions from the bottom of historical holes. Highlights included 284m grading 0.63% copper from a depth of 208m.

Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok