Marimaca sees larger project as it moves to feasibility

February 08, 2022 / www.mining-journal.com / Article Link

The PEA outlined annual production of 35,800 tonnes per year of copper cathode over a 12-year mine life with 40,000tpy of production during the first six years following an initial capital cost of

Recent News

Gold stocks rise even as metal drops for second week

June 22, 2026 / www.canadianminingreport.com

Base outperform precious metals in slowdown from 2025 boom

June 22, 2026 / www.canadianminingreport.com

Mining stocks not looking expensive versus returns

June 15, 2026 / www.canadianminingreport.com

Gold stocks gain even as metal declines

June 15, 2026 / www.canadianminingreport.com

Gold stocks plunge on metal and equities slump

June 08, 2026 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok