Orion poised to give Prieska green light in second half

By Richard Wachman in London / June 26, 2019 / www.mining-journal.com / Article Link

Greenland shines brightly in the rare earth spotlight

SPONSORED

greenland minerals

Greenland shines brightly in the rare earth spotlightsponsored-logo

Black Rock readies for race to graphite production

SPONSORED

black rock mining

Black Rock readies for race to graphite productionsponsored-logo

E25 powering towards Butcherbird PFS

SPONSORED

element 25

E25 powering towards Butcherbird PFSsponsored-logo

Finally, a changed mining tech M&A landscape

SPONSORED

atrico

Finally, a changed mining tech M&A landscapepartner-logo

According to Orion's bankable feasibility study, released this week, the project has an NPV post-tax of A$408 million (using an 8% discount rate), and an IRR of 33%, while payback occurs 2.9 years from first production.

Smart told the conference: "We are showing a compelling investment case to establish a financially robust mine with an initial 10-year mine life with post-tax free-cash flow of A$408 million." Peak funding was estimated at A$378 million.

Greenland shines brightly in the rare earth spotlight

SPONSORED

greenland minerals

Greenland shines brightly in the rare earth spotlightsponsored-logo

Black Rock readies for race to graphite production

SPONSORED

black rock mining

Black Rock readies for race to graphite productionsponsored-logo

E25 powering towards Butcherbird PFS

SPONSORED

element 25

E25 powering towards Butcherbird PFSsponsored-logo

Finally, a changed mining tech M&A landscape

SPONSORED

atrico

Finally, a changed mining tech M&A landscapepartner-logo

Smart said: "Our studies illustrate the potential of the foundation stage of the project to underpin a significant near-term, low-cost development project, with exceptional opportunities for future growth.

"There is also ample scope to significantly extend the mine life through further mining studies, drilling and exploration programs to extend the deposit, which remains open at depth and along strike.

"The huge potential for additional satellite discoveries both within the immediate near-mine environment and within the broader region provides us with a very strong project pipeline which we believe will see us operating in this district for many decades to come."

Some 9.7 million tonnes of indicated and inferred mineral resources at grades of 1.1% copper and 3.6% zinc remain outside the immediate mining plan.

In the BFS, Orion used a price of US$6,834/t of copper and $2,756/t of zinc in its modelling, with the metals currently trading at around $6,000/t and $2,500/t, respectively, and all-in-sustaining costs at Prieska put at $3,773/t copper-equivalent metal sold. Orion has a 70% stake in the project with BEE companies holding 20%.

 

Recent News

Gold stocks down as metal and equities momentum fades

September 02, 2024 / www.canadianminingreport.com

Another Kazatomprom guidance announcement shakes uranium price

September 02, 2024 / www.canadianminingreport.com

Major monetary drivers still supporting gold

August 26, 2024 / www.canadianminingreport.com

Gold stocks gain on metal rise and continued equities rebound

August 26, 2024 / www.canadianminingreport.com

Big Gold stocks outperform Big Base Metals

August 19, 2024 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok