Petra Production Hit by South Africa Power Woes

By IDEX Online Staff Reporter / December 11, 2019 / www.idexonline.com / Article Link

(IDEX Online) - Production at Petra Diamonds' South African mines has been hit by ongoing rolling power cuts across the country. 

Following a request by Eskom, the South African electricity utility, Petra halted produced, hoisting and processing at the Cullinan, Finsch and Koffiefontein mines on December 9. 

On December 10, Eskom downgraded the situation from the unprecedented Stage 6 load shedding to Stage 4. As a result, Petra restarted its mining operations with a 20-percent load curtailment, in line with requirements.

In an update, Petra said it is used to managing the operations optimally to maintain production levels as much as possible throughout load shedding requests. It said that such measures include bringing forward essential maintenance work and restricting load curtailment to processing plants where possible.

Recent News

Silver inventories rebound in UK, output from major producers rises

December 15, 2025 / www.canadianminingreport.com

Silver's three-month outperformance continues

December 15, 2025 / www.canadianminingreport.com

Silver & Copper Supply Distortions Continue

December 08, 2025 / www.canadianminingreport.com

Gold stocks down in risk-on shift

December 08, 2025 / www.canadianminingreport.com

Gold stocks rocket on metal rebound and equities jump

December 01, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok