URANIUM: Denison extends high grade Huskie zone at Waterbury Lake

By Canadian Mining Journal / September 19, 2017 / www.canadianminingjournal.com / Article Link

Map of the final summer drill holes at Waterbury Lake. (Credit: Denison Mines)

SASKATCHEWAN - With the final summer drill holes, Toronto-based Denison Mines Corp. says it has extended the high grade Huskie zone at the Waterbury Lake uranium project in the Athabasca Basin. The high grade, basement-hosted mineralization has now been expanded to 100 metres along strike, and it remains open in both directions.

The company noted these highlights from the final holes: 1.0% uranium oxide over 7.6 metres, including 4.6% eU3O8 over 1.4 metres in drill hole WAT17-449, and 0.8% eU3O8 over 7.9 metres, including 3.3% eU3O8 over 1.0 metre and 1.3% eU3O8 over 1.0 metre in hole WAT17-450A.

The Huskie zone is interpreted as being geologically similar to the Roughrider and J zones a kilometre to the south. As of Dec. 31, 2016, the J zone at Waterbury Lake contained 291.0 million indicated tonnes grading 2.0 eU3O8.

Denison has a 63% interest in the Waterbury project. The balance is held by Korea Waterbury Uranium LP. Information is available at www.DenisonMines.com.

Recent News

Many new players enter TSXV gold Top 25 by market cap

July 14, 2025 / www.canadianminingreport.com

Gold stocks mixed on moderate metal gain, flat equities

July 14, 2025 / www.canadianminingreport.com

Gold stocks lead the large cap miners by far over H1/25

July 07, 2025 / www.canadianminingreport.com

Gold stocks up as the metal price and equities gain

July 07, 2025 / www.canadianminingreport.com

Mixed outlook for gold as it remains range bound for past three months

June 30, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok