Anglo American floats solar farm on tailings at Los Bronces

By Canadian Mining Journal Staff / March 18, 2019 / www.mining.com / Article Link

Anglo American has installed 256 photovoltaic panels that float on the tailings containment pond at its Los Bronces complex. This pilot project is expected to generate 150 MWh/year from 256 photovoltaic cells.

The mine is located 65 km from Santiago at an elevation of 3,500 metres. The cells are designed to withstand extreme weather such as snow and heavy rain. Even winds of 210 km/h should not disturb the installation.

A bonus to the cell array is that it slows water evaporation by 80%. Water recovery rates are expected to go up. Currently, recycled water supplies about 45% of Los Bronces' demand.

This article first appeared in the Canadian Mining Journal.

Recent News

AOCE and WB boost gold targets for 2025 significantly

November 10, 2025 / www.canadianminingreport.com

Gold and silver price ETFs see major net outflows

November 04, 2025 / canadianminingreport.com

Gold stocks decline by less than metal price

November 04, 2025 / www.canadianminingreport.com

A shift to the later stages of gold and silver bull markets

October 27, 2025 / www.canadianminingreport.com

Gold stocks plunge on metal drop

October 27, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok