Anglo American resumes Brazilian iron ore production after slurry pipeline rupture

By Ana Paula Camargo / March 27, 2018 / www.metalbulletin.com / Article Link

Anglo American has resumed iron ore output at its Brazilian Minas-Rio operation on Tuesday March 27, following an approval granted by the country's environmental institute, Ibama.

Operations will return to their normal pace immediately, the miner told Metal Bulletin.The company stopped iron ore production at Minas-Rio on March 12, after a slurry pipeline designed to transport material from the mining site - in Minas Gerais state - to...

Recent News

Mixed outlook for gold as it remains range bound for past three months

June 30, 2025 / www.canadianminingreport.com

Gold stocks down on flat metal price

June 30, 2025 / www.canadianminingreport.com

Gold stocks down on metal decline

June 23, 2025 / www.canadianminingreport.com

Huge quantifiable rise in geopolitical, economic and trade risks

June 23, 2025 / www.canadianminingreport.com

Platinum clearly ahead of palladium for first time in seven years

June 16, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok