Answers key enviro assessment questions

By Staff Reporter / November 08, 2018 / www.mining-journal.com / Article Link

DR Congo: Is government intervention the real risk to watch?

SPONSORED

verisk maplecroft

DR Congo: Is government intervention the real risk to watch?partner-logo

Bezant's Mankayan back in copper-gold spotlight

SPONSORED

bezant resources

Bezant's Mankayan back in copper-gold spotlightsponsored-logo

Kyzyl ramp-up signals new growth path at buoyant Polymetal

SPONSORED

polymetal international

Kyzyl ramp-up signals new growth path at buoyant Polymetalsponsored-logo

Golden Mile has the right stuff: Reynolds

SPONSORED

golden mile resources

Golden Mile has the right stuff: Reynoldssponsored-logo

The company said this week its 18-month assessment of what it called "best available tailings technology (BATT)" options considered 11 locations and five technologies, including dry-stacking. It consulted with First Nations, the Yukon Environmental and Socio-economic Assessment Board and the Yukon Government on the work.

WRN said the BATT study considered environmental, technical, economic, social and failure impacts of tailings and mine waste disposal.

DR Congo: Is government intervention the real risk to watch?

SPONSORED

verisk maplecroft

DR Congo: Is government intervention the real risk to watch?partner-logo

Bezant's Mankayan back in copper-gold spotlight

SPONSORED

bezant resources

Bezant's Mankayan back in copper-gold spotlightsponsored-logo

Kyzyl ramp-up signals new growth path at buoyant Polymetal

SPONSORED

polymetal international

Kyzyl ramp-up signals new growth path at buoyant Polymetalsponsored-logo

Golden Mile has the right stuff: Reynolds

SPONSORED

golden mile resources

Golden Mile has the right stuff: Reynoldssponsored-logo

"The selected option impounds tailings and mine waste in a facility constrained by an embankment constructed from cycloned tailings material," it said.

"The location and footprint of the facility are similar to that proposed in the January 25, 2013 Casino project feasibility study."

Further engineering studies will confirm if design enhancements promising reduced "construction, operation and closure risks and less potential environmental impact" can be achieved at costs comparable to the 2013 feasibility study.

Casino has an estimated  4.5 billion pounds of copper and 8.9Moz of gold reserves, and 5.4 billion pounds copper and 9Moz gold resources, to support a projected 55-year mine life. Its previous studies point to good economics driven by a low strip ratio surface mining operation.

WRN was up 3.6% Wednesday at C86c, capitalising the company at $86.7 milion, but has fallen by a third since the start of 2018.

Recent News

Market sees gold sector nearing full value overall after target upgrades

August 18, 2025 / www.canadianminingreport.com

Gold stocks gain even as metal pulls back

August 18, 2025 / www.canadianminingreport.com

Gold stocks rocket to new highs, valuations no longer inexpensive

August 11, 2025 / www.canadianminingreport.com

Tariff issue caused by potential definition change of traded gold bars

August 11, 2025 / www.canadianminingreport.com

US BLS head removed after revisions to employment data

August 04, 2025 / www.canadianminingreport.com
See all >
Share to Youtube Share to Facebook Facebook Share to Linkedin Share to Twitter Twitter Share to Tiktok