A summary of Antofagasta's production results for the first half of 2019.
IN BRIEF: First-half copper production of 387,300 tonnes was up 22.2% year on year because of higher throughput and grades at most operations, particularly at Centinela, where output rose by 36.8% to 141,900 tonnes. Production at the flagship mine Los Pelambres was up 13.4% year on year at 180,400 tonnes. First-half molybdenum production...